Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Shear Walls Used For Liquefaction Stabilization Of Earthen Dam EmbankmentsBy Peter J. Nicholson
Recognition of the liquefaction susceptibility of dam embankments has been heightened since the San Fernando Dam near failure incident in 1971. Both the downstream and upstream slopes of dams can be
Jan 1, 2008
-
Deflection-based Design For The Capitol Crossing Support Of ExcavationBy Harald P. Ludwig, Matthew J. Niermann
The support of excavation (SOE) for the Capitol Crossing project in Washington, DC consisted of a combination of soldier piles, lagging, tiebacks, braces, underpinning, single auger soil mixed (SASM)
-
Wick Drains into the unknownBy Brian McGlynn
There are many factors that can result in a site characterization being limited. For example, a client may undervalue the importance of a good geotechnical report, or an owner may feel that it would t
May 1, 2023
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)By Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
Design And Performance Of Helical Screw Piles In Collapsible And Expansive Soils In Arid Regions Of The United StatesBy David R. Black
Foundation problems due to collapsible and expansive soils are well known throughout the arid western United States. Millions of dollars are spent annually to counteract the effects of such soils for
Jan 1, 2002
-
Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASINGBy Emad Farouz, Roger Failmezger
"The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos
Jan 1, 2007
-
TRD Soil Mixing at Herbert Hoover DikeBy George Burke
"Many soil mixing methods have evolved over the years, but the Trench Cutting Re-mixing Deep method (TRD) was developed in Japan, circa 1993, to construct continuous uniform cutoff walls, without the
Jan 1, 2009
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a WetlandBy Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian
"Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2
Jan 1, 2017
-
Session 21 "Grouting in Karst"By Jim Henry
I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi
Feb 10, 2003
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in RenoBy K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
Opimization of Solid and Hollow Micropiles for Shallow Foundations on SandBy P. D. Arumairaj, B. Vani
"Micropiles are small diameter cast insitu reinforced grouted piles and it has been effectively used in many applications of ground improvement. It increases the load carrying capacity of soil and red
Jan 1, 2015
-
Time-Dependent Increase In Load Capacity Of Tapered PilesBy Jeongbok Seo
This paper describes successful application of driven tapered-steel-pipe piles for two large-scale projects in the New York metropolitan area: Rego Park Mall, Rego Park, N.Y. and 164 Kent Avenue, Broo
Jan 1, 2008
-
Alignment Control Of Drilling Rods For Jet Grouting By Integrated MicrochipsBy Mousaab Majar, Nikolaus Schneider
The technical challenges for accurate drilling positions increase with deep underground structures in inner city areas. Designed for jet grouting, specific sensors have been developed to record the al
May 1, 2022
-
Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?By Franz-Werner Gerressen, Manfred Schoepf
"Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,
Jan 1, 2015
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future GenerationsBy John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
Hydraulic Drive Head Performance Curves For Prediction Of Helical Pile CapacityBy Donald Deardorff
Helical piles often rely on the final installation torque for ultimate capacity verification. When helical piles are designed using traditional bearing capacity equations for deep foundations and fie
-
Calibration of the Gates Pile Driving Equation for LRFD in LouisianaBy Glenn J. Rix, Eduardo Tavera, Raphael Siebenmann, Zhongjie Zhang, Robert C. Bachus, Jongwon Jung
"The Louisiana Department of Transportation and Development (LADOTD) uses a variation of the FHWA-modified Gates equation to verify the nominal pile bearing resistance, typically on smaller projects w
Jan 1, 2017
-
Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The ProjectBy D. X. Xu
A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin
Jan 1, 2010
-
Injecting Sustainability into Deep Soil Mixing ProjectsBy Paul R. Lear
Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi
Sep 8, 2021