Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Feasibility Studies - Scope and Accuracy

    Feasibility is a value improvement process for projects. At any stage in project development, a feasibility study can be undertaken, but although the scope generally remains unchanged the extent of

    Jan 1, 1997

  • AUSIMM
    Modelling the Shutdown and Startup Behaviour of Continuous Leaching Reactors

    Continuous processes must be shutdown and restarted regularly. Results from the study of operating plants showed potential value for computer simulation of the shutdown and startup of stirred tank

    Jan 1, 1984

  • AUSIMM
    The Auscoke Project

    The Auscoke project has reached-a stage where a pilot plant nominally able to produce 100 t.p.d. of coked briquettes is being brought on stream during Nov. 1971 . The targets for this stage of the

    Jan 1, 1972

  • AUSIMM
    Some Problems in Deep Open Cut Mining and their Solution by Goldsworthy Mining Limited

    The iron ore mining operations carried out by Goldsworthy Mining Limited at Golds- worthy, Shay Gap and Sunrise Hill, in the Pilbara region of the North-West of Western Australia, are unusual insofa

    Jan 1, 1979

  • AUSIMM
    The Mount Leyshon Gold Mine (NE Queensland), an Intrusive Breccia and Igneous Complex

    By Orr T. O H, Hodkinson I. P

    The Mount Leyshon breccia complex is located on an east-west trending contact between Cambrian metasediments (Puddler Creek Formation) and the Ordovician Mt. Leyshon granite, within the Lolworth-Rav

    Jan 1, 1991

  • AUSIMM
    Mine Process Simulation ù A Strategic Tool as Well as a Process Optimisation Tool

    Mining is a high risk, high capital and potentially high reward undertaking. A large proportion of the risk comes from a lack of definition of the orebody (which also provides some of the potential) a

    Jan 1, 2003

  • AUSIMM
    Assessment of Leachate From Blended Waste Rock Material at the Pasminco Century Mine ù Initial Results From a Two-Year Study

    By M Ridd

    The Pasminco Century Mine (PCML) is located 250 kilometres north-north-west of Mt Isa in Queensland. As one of the worldÆs largest zinc mines, PCML comprises mining and milling operations at Lawn Hill

    Jan 1, 2004

  • AUSIMM
    The High Productive Operation of a Small Blast Furnace

    By Fukui M

    An increase in pig iron output by 50 per cent was aimed at after re-lining No.2 blast furnace of NAKAYAMA STEEL WORKS. This had to be achieved by increasing both the furnace volume (from 673 to 757

    Jan 1, 1980

  • AUSIMM
    Burden Movement Experiments Using the Hybrid Stress Blasting Model (HSBM)

    By G Chitombo, M Ruest

    In surface mining, studies of the kinematics of blasted rocks using high speed film/video image analysis have allowed the estimation of the starting time, direction and magnitude of visible movement o

    Jan 1, 2007

  • AUSIMM
    Review of Rock Blasting and Explosives Engineering Research at SveBeFo

    A short overview of the research program of SveBeFo, Swedish Rock Engineering Research, which was founded in 1993 is first given. Then four recent and ongoing projects in rock blasting and explosive

    Jan 1, 1995

  • AUSIMM
    Modelling Heap Leach Operations with Metsim

    Metsim is proving to be a powerful tool when designing a heap leach operation. The most useful outputs arc determining the fluctuations in pregnant solution recovery rate, make-up water rate, gold r

    Jan 1, 1994

  • AUSIMM
    Modelling Undissolved Gold Losses in an Industrial Plant with Neurofuzzy Methods

    By L Lorenzen, C Aldrich

    In this paper, a neurofuzzy model is proposed for the development of an explanatory model of an industrial gold leach circuit based on historic plant data. A regression tree was used to partition the

    Jan 1, 2007

  • AUSIMM
    Recoverable Resource Estimation Using Bivariate Uniform Conditioning at the Lihir Gold Mine

    By A Tomsett, R Kidd, Z Casley

    Bivariate recoverable resource estimation aims at predicting the recovered metal for a secondary variable when a cut-off is applied to a primary variable. The choice of a consistent geostatistical mod

    Jan 1, 2009

  • AUSIMM
    Site Investigation Drilling on the Derwent River

    By Billingham R

    The Department of Mines Tasmania employs a Drilling Section for specialised drilling re- quired by government and semi-government bodies. The section has a complement of nine crews oper- ating auger

    Jan 1, 1977

  • AUSIMM
    Basic Mechanism of Strata Fractures Formation and Expansion Around Mine Working

    Underground measurements, observations and computed simulations, started a long time ago were concerning the study of : - occurence of typical rockburst, - inducing, stretching of main fractures in

    Jan 1, 1988

  • AUSIMM
    A General Description of Community Life and Safety Work in Vatukoula, Fiji

    Vatukoula is credited with the second largest population in the Colony of Fiji. Within an area comprising 550 acres are living approximately 4,500 people. Of these, about 1,150 Fijians, 90 Rotumans, 9

    Jan 1, 1953

  • AUSIMM
    Sampling High Purity Copper Cathodes

    Interest in the sampling of refined copper cathodes has heightened over the last ten years. This has followed the increasing importance of cathodes as the principle trading form for metallic copper. I

    Jan 1, 1976

  • AUSIMM
    Principles of Coal Preparation

    The first stage in process design for coal preparation is a study of the coal seam and its associated features followed by an examination of the mining method to.be employed and the coal market requi

    Jan 1, 1975

  • AUSIMM
    Pit Lake Sustainability - What Is It, and How Do I Get It?

    By M Lund

    Due to operational and regulatory practicalities, pit lakes will continue to be legacies of many open cut mining lease relinquishments. Unplanned or inappropriate management of these significant geogr

    Jan 1, 2006

  • AUSIMM
    Mine Equipment

    By Ingham PD

    Selection of equipment for a mining operation, such as Mount Isa Mines, requires certain parameters to be correctly defined. Management control is essential for monitoring, improving and future pu

    Jan 1, 1982