Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Characterisation of Silver Minerals in Lead-Zinc Flotation Tailings and Their Response to Cyanidation

    By N Guresin, M Rohde

    A lead-zinc flotation tailings sample containing silver from BHP Billiton’s Cannington Mine has been characterised to understand occurrences of silver in the tailings by conventional elemental, X-ray

    Sep 1, 2014

  • AUSIMM
    Ore Dilution Sources in Underground Mines - Interpretation and Evalution Methods

    By Szymanski J

    In the first part of this paper, the principal sources of dilution during underground evaluation and mining are discussed, then definitions of ore dilution currently in use are analysed. These defin

    Jan 1, 1995

  • AUSIMM
    Principles and Practice of Effluent Control at Sulphide Corporation Cockle Creek, N.S.W.

    Sulphide Corporation Pty. Limited operates a Lead/Zinc Smelter at Cockle Creek, some 11 miles from Newcastle, N. S. W . Works effluents totalling some 8, 500, 000 gallons/day join Cockle Creek some

    Jan 1, 1971

  • AUSIMM
    The Challenges of Selective Mining within the Globe Progress Gold Mine, Reefton, South Island, New Zealand

    By R Cooksey

    The Globe-Progress Mine is an open pit gold mine that is part of the larger Reefton Goldfields deposit located on the West Coast of New Zealand. The regional geology comprises a series of north to sou

    Aug 22, 2011

  • AUSIMM
    Exploration and Geology of the Goodall Gold Mine

    By D R Quick

    The Goodall gold mine is located 30 km east of Adelaide River, within the Pine Creek 1:250 000 map sheet, at 8 525 000 mN: 750 000 mE, on the AMG grid. The first gold was poured in April 1988 and th

    Jan 1, 1994

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    The Hamata Gold Prospect, Morobe Goldfield, Papua New Guinea

    By Mowat B. A

    I lamata is within the Morobe Goldfield (7¦ 25' S, 146¦ 39' E) on the Wau (SB 55-14),1:250,000 scale map sheet (Fig 1). The deposit is 13 km SW of Wau, within the headwaters of the Upper

    Jan 1, 1997

  • AUSIMM
    Economy in a basket: multi-purpose use of gabions at the Porgera Gold Mine

    By Thompson M

    The humble gabion basket is to mine development what the light bulb and safety pin are to eir-ryday life. Gabions provide a flexible, easy to assemble and cost efficient solution for "101" mine and ci

    Jan 1, 1994

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Machine Mining

    By Littlewood E

    We offer these notes as a practical contribution. All the arguments we advance have been tested by practical experience.In its preparation we realised that our subject was one of such importance and c

    Jan 1, 1944

  • AUSIMM
    Sampling for the percentage moisture in the iron ore industry

    By M Fritz, B Ziegelaar

    "For moisture samples, the International Standard for iron ore sampling states the following: Moisture samples shall be processed as soon as possible and test portions weighed immediately. If this

    May 9, 2017

  • AUSIMM
    The Subsurface Distribution of the "Upper Coal Measures", Sydney Basin, New South Wales

    Subsurface information from the "Upper Coal Measures" of the Sydney Basin is interpreted by means of structure contour maps, isopach maps and geological cross- sections. Particular reference is mad

    Jan 1, 1972

  • AUSIMM
    The Chromite Resources of Papua New Guinea

    Deposits of chromite are in associated with ophiolite complexes in Papua New Guinea. No deposits which are currently exploitable have been recognised, but large resources that may be economic in t

    Jan 1, 1987

  • AUSIMM
    Increasing production systems availability through remote support discipline

    By A Innis, A Bye, B McCarthy, S Glover

    Technology adoption in the mining industry has been steadily increasing over the past decade, driven by the need to improve operational efficiency, safety, sustainability, and profitability. As mining

    Sep 1, 2024

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011

  • AUSIMM
    Block Model Data Reduction and Sensitivity Analysis

    By J E. Everett

    Maximising ore tonnage at a selected target grade requires that appropriate ore identification criteria be established. Iron ore mining block models may consist of many millions of estimated blocks, e

    Jul 13, 2015

  • AUSIMM
    Automated Loading and Hauling Experiences at De Beers Finsch Mine

    By R Grobler, D Burger, L Alberts

    The current climate in the mining industry is allowing mining companies to further broaden their views and investigate technologies to improve the safety, efficiency and cost-effectiveness of their op

    Jan 1, 2008

  • AUSIMM
    The Electronic Delay Detonator Trial at KCGM Mount Charlotte Operation

    By D Caffrey

    To demonstrate the advantages of using electronic delay detonators over pyrotechnic detonators, a trial using the DNES Dynatronic System was conducted at the KCGM Mount Charlotte operation in 1998. Th

    Jan 1, 1999

  • AUSIMM
    Functional Performance of Ball Milling Circuits – A Plant Metallurgist’s Tool for Process Characterisation and Optimisation

    By O Arafat, K M. Bartholomew

    A voracious consumer of energy and grinding media, the modern ball milling circuit has a huge direct cost impact on a mineral processing operation. Through optimisation, grinding also has the potentia

    Sep 1, 2014