Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Study of Floor Heave in the Mines of the Southern Coalfield of New South Wales by Two Dimensional Finite Element ModellingBy Seneviratne SP
The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. A
Jan 1, 1992
-
New risk assessment method for coal mine excavated slopesBy I Canbulat, J Oh, A Mcquillan, D Payne
This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer
Nov 30, 2018
-
Tectonic Features of Sumatra and New Zealand in Relation to Active and Fossil Hydrothermal Systems: A Comparison (03fbbe41-bfa7-4f63-a332-5ec59c058031)By Bogie I, White P. J
Active geothermal systems occur widely in Sumatra and in the Taupo Volcanic Zone (TVZ) of New Zealand. There are also many occurrences of epithermal gold mineralisation in Sumatra, some of which are
Jan 1, 1995
-
Applicability of TBM (tunnel boring machine) for deep lunar subsurface explorationBy T Y. Ko, Y S. Kang, S J. Park, J H. Hwang
The lunar subsurface, particularly the lava tubes formed by ancient volcanic activity, presents a promising environment for establishing safe and sustainable human habitats on the Moon. Tunnel Boring
Sep 1, 2024
-
Assessing the Feasibility of Constructing a Subsea Water Supply from the New Territories to Ma Wan Island ù Directionally Drill or Tunnel?By D Moy, T Carter
This paper outlines the feasibility assessment conducted to explore the possibility of constructing two submarine water supply pipelines beneath the Ma Wan Channel in Hong Kong using either horizontal
Jan 1, 1999
-
Project Selection and Process Development for Mining JuniorsBy L Lorenzen, H Muller
"Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th
May 24, 2012
-
The Need for Specification Development in Australian Road TunnelsBy T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
Dissolution of quartz in Mn-slags during production of SiMn alloyBy S Jayakumari, E Ringdalen, V Canaguier
Silicomanganese (SiMn), containing approximately 16–30 per cent Si, is produced in submerged arc furnaces using various Mn sources and quartz as the primary raw materials, along with fluxes and reduct
Jun 19, 2024
-
The Use of Simulation in the Lihir Gold Expansion StudyBy C Glassock, P Tilyard, T Sandeman
Computer simulation is a well accepted tool for modelling the behaviour of large and complex operating systems. It is a particularly useful technique in complex operations where there are multiple int
Jan 1, 2006
-
Studies on Active Gold Mineralisation in the Waiotapu Geothermal System, New ZealandGold is actively precipitating at grades up to 80 g/tonne at and near the surface of the Waiotapu geothermal system, located in the Taupo Volcanic Zone of New Zealand. Many characteristics of this act
Jan 1, 1984
-
Experiences from developing a road map to attractive, inclusive and safe mining workplacesBy L Abrahamsson
The aim with this paper is to discuss experiences from the ongoing research project ‘Attract: A roadmap to attractive, inclusive, and safe mining workplaces’. The project’s aim is to analyse possibili
Sep 1, 2024
-
Queensland’s open cut coalmine void rehabilitation planning practices – challenges and opportunitiesBy M Clay, J Dunlop
Thermal and metallurgical coal mining in Queensland has resulted in mines which contain voids due to open cut mining. While there are several proposals for greenfield coalmines or expansions to existi
Aug 2, 2023
-
The Application of SimulationTechnology to Enchance Operator PerformanceBy Morrison RD, Peberdy NJ
Simulator training provides a cost effective method of training operators in both the process and control aspects of a metallurgical plant. The components and requirements of a training simulator ar
Jan 1, 1991
-
The Role of Geologists in Assessing and Quantifying Geological Uncertainty in the Conversion of Mineral Resources to Ore ReservesStandards in the public reporting of resources and reserves in Australia have dramatically improved since the implementation of the Australasian Code for Reporting of Mineral Resources and Ore Reserve
Jan 1, 2003
-
Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?By C Pope, M Tannock
Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m
Jul 13, 2015
-
Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)By Medhurst TP, Trueman R, Hutchinson IN
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed
Jan 1, 1992
-
Can Mining Be Part of the Circular Economy or Is It Squaring the Circle?By A Golev, G Corder
The concept of the circular economy has been gaining traction both in Europe and China.In Europe the Ellen Macarthur Foundation see their mission as accelerating the transition from a linear take-make
Jun 28, 2016
-
Slot Stopping At Bold Head Mine, King Island ScheeliteBy Snowden C. T
B Lens Main is a scheelite orebody with an average dip of approximately 15¦ and thickness ranging from 1.5 to 6.0 m. The orebody is overlain by a banded section of ore and waste which tends to slab
Jan 1, 1977
-
The Application of Measurement and Modelling of Sulfidic Coal Wastes at Pacific Coal's Kestrel Mine for Use in Development of a Closure PlanBy T A. Short, P L. Brown
Kestrel Mine co-disposes around 1.5 Mt of fine (2SO4/t and to date around 9 Mt has been deposited. The mine plans to co-dispose of approximately 39 Mt of material, creating a dump with a maximum heigh
Jan 1, 2003
-
Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes MinesBy F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan
"Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th
Oct 10, 2016