Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Wireless System for Monitoring Cave-back Propagation

    By S Steffen, S Talu, J Poulsen, G Watt, A van As, J S. Ooi

    The economic success of cave mining projects is significantly influenced by the secondary fragmentation size distribution of the caved orebody and making the fragmented ore available for extraction. I

    May 9, 2016

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Controls on the Hydrology of Large Volcanically Hosted Geothermal Systems : Implication for Exploration for Epithermal Mineral Deposits

    By Lawless JV

    Recent exploration for gold on the Pacific Rim has utilised similarities between active hydrothermal systems and epithermal gold deposits. The major control over formation of such deposits is the

    Jan 1, 1987

  • AUSIMM
    Renison - New Advances in the Geological Understanding of a World-Class Ore Deposit

    By Mroczek C. R, Evans D. A

    Renison is a world-class ore deposit that has been mined for over 100 years. It currently has reserves of 5.06 Mt @ 1.88 per cent Sn and a projected mine life of 8.5 years. Recent advances in the ge

    Jan 1, 1997

  • AUSIMM
    The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025

    By A P. Wibowo

    Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2

    Nov 22, 2011

  • AUSIMM
    Longwall Mining at Appin Colliery

    A four monthly period was analysed for each retreating longwall face which indicated that output increased from 1140 tonnes/day for Longwall 1, to 1620 tonnes/day for Longwall 2 and to 2090 tonnes

    Jan 1, 1976

  • AUSIMM
    Investigation of flotation behaviours of fine particles in a complex ore consisting of various copper minerals

    By K Aikawa, M Ito, K Mitsuhashi, Y Ebisu, J V. Satur, I Park, N Hiroyoshi, T Suto

    Copper concentration using flotation is becoming more difficult, because of an increase in ore complexity accompanied by smaller grain sizes of copper minerals than usual, requiring finer grinding in

    Aug 24, 2022

  • AUSIMM
    Tailing Thickener Operability and Control Improvements at ProminentáHill

    By J Lombardi, M Weidenbach

    "OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township

    Oct 29, 2012

  • AUSIMM
    Segregation Roasting of Nickel Oxide Ore

    By Svensson J

    The nickel segregation process is one of the methods for treating nickel oxide ores. In this process nickel oxide ores are heated together with a small amount of the carbonaceous reductants and hal

    Jan 1, 1980

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast

    By Kleine T. H

    Blast design involves many engineering constraints and objectives. Some of the more important include the implementation costs, the desired fragmentation and shape of the muckpile. A spreadsheet has b

    Jan 1, 1992

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Flocculation Behaviour of Dolomite

    By Behl S

    Flocculation behaviour of six different dolomite samples, four from the Florida mining district, one from Perry, South Georgia and another from New Jersey was examined using polyethylene oxide (PEO)

    Jan 1, 1993

  • AUSIMM
    "Comprehensive Mineralogical Characterisation at the Cerro Corona Cu-Au Porphyry Mine – the Fundamental Key for Geometallurgical Applications"

    By P Gomez, R Baumgartner, G Escobar

    "The Cerro Corona mine consists of a Cu-Au porphyry deposit located in the Andes of northern Peru. The deposit comprises a typical Cu-Au multiphase porphyry mineralisation that has been overprinted by

    Jun 15, 2016

  • AUSIMM
    Energy Recovery from Hot Particulates

    There are a number of mineral processing operations which produce at some point a stream of hot particulates. At today's energy prices it becomes important to recover the energy held in the ho

    Jan 1, 1981

  • AUSIMM
    Ventilation Survey Procedures and Database for Use with Computer Simulation Techniques

    By Nixon TR

    The Australian Coal Industry Research Laboratories Ltd. (A.C.I.R.L.) MINVENT computer program can be used to simulate existing and projected colliery ventilation requirements. New collieries can be

    Jan 1, 1983

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Ground support in strongly foliated and faulted rocks at Woodlawn Mines, NSW

    The Woodlawn base metal sulphide deposit, located 50km S of Goulbum, New South Wales, was mined as an open pit operation for 10 years from 1977, producing 8 million tonnes of ore. Underground developm

    Jan 1, 1990

  • AUSIMM
    The Foreign Investment Climate for Mining and Exploration in Indonesia and Papua New Guinea from an Australian Perspective

    By Gillies A. D S

    The active history of foreign investment in the mining industry has resulted in Australia emerging as a major world producer of a range of mineral commodities. The current contribution to the nation

    Jan 1, 1994

  • AUSIMM
    Energy Efficiency Assessments in Design – Seminal Decisions and Effective Processes

    By M Allen

    Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta

    Aug 8, 2011