    Continuous Carbon Concentration Measurement at Newmont Boddington Gold

    By C McCamley

    "The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold

    Oct 10, 2016

  • AUSIMM
    Resource Modelling and Mine Design at Obuasi Mine, Ghana

    By C K. Boafo, J Visser

    Obuasi Mine in Ghana, with more than 100 years of mining history, developed from a surface operation into a deep >2000 m underground gold mine. The challenge is to extract value from narrow veins l

    Jan 1, 2008

  • AUSIMM
    Gold Mining and Exploration in South America -- An Overview

    Gold mine production in South America was 247.3 tonnes in 1995 up from 156.4 tonnes ten years earlier in 1986. This represents a 58 per cent increase and amounted to 11 per cent of total world gold mi

    Jan 1, 1997

  • AUSIMM
    Your Career ù Are You an Overnight Dot.Com or a Long-Term Growth Option?

    The current boom being experienced by mining, coupled with a shortage of professionals, will mean those in the industry will have many choices. It may be easy to become carried away and run with the h

    Jan 1, 2004

  • AUSIMM
    A Bounding Surface Model for Sand Subjected to Blast-induced Vibrations

    By L M. Zhang, T H. Xu, J Zhao

    Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc

    Nov 5, 2014

  • AUSIMM
    A Review of Processing at the Cannington Ag/Pb/Zn Mine

    By G Clarke

    Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t

    Jan 1, 2007

  • AUSIMM
    Truck Fleet Utilisation and Fuel Saving in Aitik

    Aitik, a Boliden owned and operated open pit mine located in northern Sweden, will expand production from 18 Mt per year today to 36 Mt per year copper ore during 2010. The challenge for the mine oper

    Jan 1, 2007

  • AUSIMM
    Review of Seam Gas Drainage in Australia

    By Lunarzewski L

    Gas problems, largely instantaneous outbursts of coal and gas, arose in the early days of coal mining in Australia, leading to attempts at predrainage often including destressing. With deeper mining a

    Jan 1, 1985

  • AUSIMM
    The Preparation of Pastefill and Its Use at Some Canadian Mines

    Two key elements in the design of a pastefill or high density backfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owing

    Jan 1, 1998

  • AUSIMM
    The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel Mine

    By K Rees

    In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow

    Mar 26, 2012

  • AUSIMM
    Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill Operation

    By D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett

    During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve

    Oct 29, 2012

  • AUSIMM
    Clean Energy and Mining – Future Synergies

    By R Memary

    The environmental and economic impacts of a significant dependence on fossil fuels are affecting the future of sectors such as of mining. These impacts are prompting the Australian Government to seek

    Nov 22, 2011

  • AUSIMM
    Presidential Address 1958: Early History of the Mineral Industry in Tasmania

    It is a very great privilege for me to be able to address you tonight and I am deeply sensible of the honour which has been done me. I am equally sensible of the inadequacy of my training for the posi

    Jan 1, 1958

  • AUSIMM
    Sampling for Grinding Pilot Plant Test - The Effect of Size Distribution Variability

    By S Brochot

    During the development of a mining project, samples are taken for metallurgical tests. The sample can be a composite sample made of material coming from a selection of various drilling products or a s

    Aug 21, 2012

  • AUSIMM
    Isasmelt - A 250 000 TPA Copper Smelting Furnace

    MIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ

    Jan 1, 1998

  • AUSIMM
    How the Use of Market-Based Risk Metrics can Undervalue Good Mining Projects and Overvalue Poor Ones

    By T Y. Dube

    In this paper current net present value (NPV) based mine valuation techniques that take into account market and private risk are discussed and analysed. Potential pitfalls that arise from the applicat

    May 24, 2012

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015

  • AUSIMM
    Flotation as an Operation of Macromolecular Mass Transfer

    By M R. Drumond

    The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the

    Jan 1, 2005

  • AUSIMM
    Scoping of Feasibility Studies

    How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I

    Jan 1, 1998

  • AUSIMM
    Managing Safety: Management's Role in Preventing Accidents

    An intensive safety campaign at Mount Isa Mines Limited from 1956 to 1966 saw the lost time accident frequency rate fall to half its original level. A review of the safety programme was carried out

    Jan 1, 1975