Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Characteristics Of Mining-Induced Fractures In Overlying Strata

    By Jialin Xu

    Bed separations position, size, development characteristics and their influence factors have been analyzed in-depth by experimental and theoretical methods. The results show that the key strata determ

    Jan 1, 2003

  • SME-ICGCM
    Use Of Database In Ground Control To Identify Weightings And Water Inflows

    By G. C. Xiao

    A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate

    Jan 1, 1990

  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    The Broken Rock Zone Around Tunnels And Its Support Theory

    By Fangting Dong

    The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s

    Jan 1, 1988

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • SME-ICGCM
    Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)

    By S. J. Mitchell

    An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz

    Jan 1, 1984

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions

    By M Nombe

    Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was

    Jan 1, 2002

  • SME-ICGCM
    Acoustic Scanner Analysis of Borehole Breakout to Define the Stress Field Across Mine Sites in the Sydney and Bowen Basins, Australia

    By S. MacGregor

    The role of horizontal stress, its orientation and magnitude, in defining the behaviour of strata in underground coal mines has been well established. Poor panel layouts have led to gate end stress co

    Jan 1, 2002

  • SME-ICGCM
    Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining Operations

    By Yi Luo

    The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c

    Jan 1, 2003

  • SME-ICGCM
    Investigations Of Underground Coal Mine Bursts

    By K. Haramy

    Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;

    Jan 1, 1984

  • SME-ICGCM
    Evaluation Of Support Performance In A Highly Stressed Mine

    By Hamid Maleki

    The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5

    Jan 1, 1994

  • SME-ICGCM
    Load Deformation Behavior Of Simulated Longwall Gob Material

    By Deno M. Pappas

    The purpose of this U.S. Bureau of Mines study was to determine the material stiffness properties of the gob for use in numerical models of rock mass response to longwall mining. Photographs of actual

    Jan 1, 1993

  • SME-ICGCM
    The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)

    By Stephen Tadolini

    Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen

    Jan 1, 2003

  • SME-ICGCM
    Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case Studies

    By S. S. Peng

    In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga

    Jan 1, 1999

  • SME-ICGCM
    Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)

    By Gabriel Esterhuizen

    The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability

    Jan 1, 2004

  • SME-ICGCM
    Monitoring Of Longwall Seal Behaviour For Permeability And Stress Changes

    By Ken Mills

    Dartbrook Mine (Australia) works the Wynn seam, which has a moderate propensity for spontaneous combustion. Prior to any mining a commitment was made to place a segregation barrier pillar between long

    Jan 1, 1999

  • SME-ICGCM
    Improving Roof Control At A South African Coal Mine

    By Alan Bugden

    Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and

    Jan 1, 2001

  • SME-ICGCM
    Understanding the Causes of Roof Control Problems on a Longwall Face From Shield Monitoring Data ? A Case Study

    By Robert Trueman

    This paper details the results of an assessment aimed at understanding the shield loading mechanisms associated with strata-related issues on a longwall face. Shield load cycle analysis theories devel

    Jan 1, 2011