Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits
By Krzysztof Kotwica
The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in
Jan 1, 2006
-
A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad
By Jennifer Riefenberg
Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern
Jan 1, 1993
-
Improvements in Long Tendon Support with Pumpable Resin
By Tom Meikle
Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use
Jan 1, 2012
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)
By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009
-
Analysis Of Entry Roof Failure And Falls At Springvale Colliery
By Wm. Mark Hart
High horizontal stresses and shear failure have been considered the major reasons that cause entry roof failure and falls for underground mining. Therefore, reorientation of the current mining systems
Jan 1, 1996
-
In-Seam Seismic Tomography Mapping Application To Coal Mining Problems
Continuing with the effort of providing new and more effective exploration methods to the mining industry, where direct methods (drilling, cross-cutting, etc.) are not applicable, either for logistica
Jan 1, 1996
-
Analytical Investigation of Shaft Damages at West Elk Mine
By Tim Ross
Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear
Jan 1, 2006
-
The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study
By A. W. Khair
This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan
Jan 1, 1986
-
Keynote Address for 24th International Conference on Ground Control in Mining, August 2- 4, 2005 - Like Deja Vu All Over Again
By Peter B. Lilly
Thank you, Syd, for the kind introduction and for inviting me to give the Keynote Address at this very prestigious gathering of some of the finest intellect and talent in the domestic and internationa
Jan 1, 2006
-
Detailed Stress Analysis of Longwall Panels
By Khaled Morsy
In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh
Jan 1, 2006
-
Knowledge Is Power: Introducing the Midas, a New Permissible Datalogging System for Use in Mines
By Tristan H. Jones
Beginning in 1987, miniature dataloggers approved by the Mine Safety and Health Administration (MSHA) were publicly available for sale. The principal among these was the model CR21XQM, manufactured by
Jan 1, 2012
-
Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)
By Holger Witthaus
Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci
Jan 1, 2009
-
Coal Pillar Loading Mechanisms and Progress in Pillar Design
By David Hill
The Australian underground coal mining industry is increasingly operating in an environment that challenges traditional concepts of coal pillar design, against a background of heightened expectations
Jan 1, 2008
-
Influence Of Cutting Sequence On Development Of Cutters And Roof Falls In Underground Coal Mine (e70fc8d5-b1f5-424b-b360-729cb6e50081)
By Anil K. Ray
Roof falls are one of the greatest hazards in underground coal mines worldwide. Due to stringent safety measures and extensive support system development, roof falls have been reduced significantly bu
Jan 1, 2009
-
Subsidence and Uplift Prediction in German and Polish Hard Coal Mining
By Axel Preusse
For the last 150 years, subsidence damage to the surface has been an unavoidable phenomenon associated with underground coal mining. In particular, the mechanization of mining methods in multiple seam
Jan 1, 2012
-
Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?
By Dan Payne
The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo
Jan 1, 2008
-
The Investigation Of The Rock Mass Stressed-Deformed State Under The Conditions Of Floating Earth Presence In The Roof Of The Level Working
By V. Bondarenko
The forecasting of floating earth inrush into the working is to a great extent connected with the investigation of the rock mass stressed-deformed state around the working. The aim of such investigati
Jan 1, 1996
-
New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology
By Victor Nazimko
A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d
Jan 1, 2008
-
CISPM - A subsidence prediction model
By Y. Luo
A PC based computer model has been developed by the authors for predicting the surface subsidence due to underground coal mining. Its reliability, comprehensiveness and user friendliness demonstrate t
Jan 1, 1989
-
Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)
By David Conover
The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo
Jan 1, 2009