Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design And Start Up Of The Cortez Gold Mines Pipeline MillBy R. N. Powell
The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the
Jan 1, 1999
-
The Sir Adam Beck II Intake Tunnels—Homage To The BuildersBy Clair Murdock, David Heath
The 1,280 MW Sir Adam Beck II Hydroelectric Project was constructed in the1950s, at Niagara Falls, Ontario, Canada. The twin intake tunnels total over 17 kilometers in length and pass deep below the C
Jan 1, 2007
-
Bias And Error In Mine Project Capital Cost EstimationBy J. Bertisen, G. Davis
Previous analyses of small samples of mining projects have found that feasibility studies tend to well under-estimate the actual capital costs of the project. Our review of 63 mining and smelting pro
Jan 1, 2007
-
SME Annual Meeting and Exhibit – Suppliers Display Latest in Mining Technology at SME 2007 ExhibitBy Georgene Renner, William R. Yernberg, William Gleason
American Commercial (ACI) offers a selection of ground control solutions. Beginning with steel liner plates installed in the Gratiot Avenue sewer system in Detroit, MI 1920, ACI is one of the leading
Jan 1, 2007
-
Use Of The 1500-pDR For Gravimetric Respirable Dust Measurements At MinesBy W. R. Reed
The National Institute for Occupational Safety and Health (NIOSH) uses light-scattering dust monitors (nephelometers) in its research to develop dust controls to reduce respirable silica dust overexpo
Jan 1, 2012
-
A Micro-Scale Investigation of the Adsorption of Collectors on Bastnaesite Mining, Metallurgy and Exploration (85616d6e-c7a6-4b57-8595-493361618312)By James Withers, Dongbo An, Jinhong Zhang
A micro-scale investigation was carried out by applying atomic force microscopy (AFM) to study in situ the adsorption of various collectors, i.e., oleic acid, octanohydroxamic acid (HA), and salicylhy
-
A Micro-Scale Investigation of the Adsorption of Collectors on Bastnaesite Mining, Metallurgy and ExplorationBy James Withers, Dongbo An, Jinhong Zhang
A micro-scale investigation was carried out by applying atomic force microscopy (AFM) to study in situ the adsorption of various collectors, i.e., oleic acid, octanohydroxamic acid (HA), and salicylhy
-
1970s – SME Moves Headquarters From New YorkBy William M. Gleason
The war in Vietnam stretched into another decade, an American President was at the brink of impeachment, the earth was given its own day, twin tower monuments of American ingenuity were completed in N
Jan 1, 2007
-
A New Diatomite Resource In EgyptBy M. I. Al-Wakeel
Nile sediment was collected as a waste from one of the water treatment plants in Cairo, and subjected to petrographical investigation and granulometric, chemical, and mineralogical analyses. It was ex
Jan 1, 2008
-
Notes On Impediments To Mining Investments In The Developing WorldBy J. S. Carman
As with the slogans of Madison Avenue, catch words or phrases frequently become topical. Much is heard these days of the confrontation between governments of developing countries and international min
Jan 1, 1977
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Summersville Raw Water IntakeBy Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005
-
Industrial Minerals 1987By L Baumgardner, A. V. Castelli
Barite In 1987, United States mine production of barite increased 15.870, consumption (sold or used by grinding plants) increased by 6.97, and imports are estimated to have fallen by 19.57. World
Jan 6, 1988
-
Reducing Emissions Through The Use Of A Fuel Borne Combustion CatalystBy R. Curtis
To achieve compliance with 2015 EPA Tier 4 Final regulations, which permit only around 10% of Tier 3 particulate matter (PM) and NOx emissions, a number of technologies are being implemented. Use of a
Feb 27, 2013
-
Evaluation Of Sulfuric Acid Baking And Leaching Of Enargite ConcentratesBy M. S. Safarzadeh
Over the last fifty years, the treatment of enargite concentrates has not received much attention primarily because of the availability of other clean concentrates suitable for processing with existin
Jan 1, 2012
-
Management By Loss In Mining - Introduction - Preprint 09-017By M. J. Ramos
Without an exclusive definition of administration in business, we could propose to define it as performance by management to adopt or implement established business formulas. Administration could als
Jan 1, 2009
-
Rare Earth Elements (REE) Deposits In New MexicoBy V. T. McLemore
Deposits of rare earth elements (REE) are found in NM, but they have not been important exploration targets in past years because demand has been met elsewhere. However, with the projected increase in
Jan 1, 2012
-
New Test Methodology For Estimating The Abrasiveness Of Soils For TBM TunnelingBy F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen
Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes
Jan 1, 2007
-
Solvent Extraction Approach To Recover Boron From Wastewater Generated By The LCD Manufacturing Industry: Part 1By D. Mohapatra
The possibility of using 2,2,4-trimethyl-1,3-pentanediol dissolved in tetrachloromethane as extractant for boron recovery is discussed. The parameters optimized for this purpose are contact time, boro
Jan 1, 2008