Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    New Technology Changes Blind Shaft Drilling

    By Alan Zeni

    Blind shaft drilling equipment has not changed substantially since the 1970s. Since it resides in a niche market between conventional shaft sinking and raise boring, the relatively small demand has re

  • SME
    Improvements In Copper/Lead Separation With Activated Carbon (cda83d32-ab8b-441a-bc6d-9412a16e7289)

    By John A. Meech

    In many multiple-sulphide ore flotation processes, it is desirable to concentrate each of the various valuable minerals into separate products. Although there are a variety of techniques and chemicals

    Jan 1, 1977

  • SME
    Recovery Of Value-Added Products From Red Mud (159ea712-0a88-432f-8569-a6e0e2ae6cf7)

    By B. Mishra, A. Staley, D. Kirkpatrick

    The major waste product of the alkaline extraction of alumina from bauxite [Bayer Process] is known as red-mud. Approximately, a ton of red-mud is produced for every two tons of bauxite mined. The red

    Jan 1, 2001

  • SME
    Uncertainty Based Push-Back Design Algorithm In Open Pit Mining

    By J. Gholamnejad

    In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi

    Jan 1, 2007

  • SME
    Preventing Injuries Caused By Unrecognized Stone Mine Roof Beam Failures With A Pro-Active Roof Control Plan (0c7b539f-811b-45a7-99b1-58337aa78aec)

    By A. T. Iannacchione

    Unrecognized roof beam failures resulted in 69% of the falls of ground injuries occurring in underground U.S. stone mines from 1990 to 1996. Field investigations at 45 underground stone mines suggest

    Jan 1, 1999

  • SME
    Economic Conditions Help Minnesota’s Iron Ore Mining

    By William R. Yernberg

    What a difference a year makes. One year ago, the iron mining industry and the steelmaking industry in the United States were in trouble. Many companies were in bankruptcy, and talk of plant and mine

    Jan 1, 2004

  • SME
    Field verification of an improved mine fire location model

    By L. Yuan, D. Bahrami

    Underground mine fires remain a concern for mine operators, posing a health and safety risk to mineworkers. In the last decade, the number of mine fires has decreased significantly. However, dealing w

  • SME
    Planning to meet the required DPM concentration levels in underground mines ? a calibration model

    By k. Osei-Boakye

    This paper presents the calibration of a real-time aerosol monitor, the TSI DustTrak?, to the NIOSH 5040 method being used by the Mine Safety and Health Administration (MSHA) for compliance enforcemen

    Jan 1, 2009

  • SME
    Study On Preparation Techniques Of Carnallite With Waste Brine

    In this work, the crystallization of Carnallite from waste brine of Qaidam Basin in Qinghai province was studied based on NaCl-KCl-MgCl2-H2O phase diagram. According to this study, a new crystallizati

    Jan 1, 2012

  • SME
    Options For Coal Firing For The Straight Grate Pelletizing Process

    By M. A. A. de Klaver

    Functional Description Figure 1 is a typical flowsheet for a system for solid fuel addition to filter cake. Solid fuel, coal, coal breeze, or charcoal, is fed from a,stockpile to a surge hopper. The s

    Jan 1, 1980

  • SME
    The North American Tunnel Method—Lessons Learned

    By Don Phelps, John Hawley, David P. Field

    In recent years observational techniques of tunneling have become increasingly popular methods to facilitate complex underground infrastructure projects. The traditional design and construction manage

    Jan 1, 2005

  • SME
    Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)

    By S. Ersayin

    In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im

    Jan 1, 2008

  • SME
    Mystery Of The Missing Grade And Recovery

    By S. Ripke

    Between 2002 and 2004, the performance of a six million ton per year iron ore beneficiation plant dropped significantly. In a classic case of “who done it,” was it the mine, the concentrator, an ore c

    Jan 1, 2007

  • SME
    A Review Of The Many Cost Approach Methods For Minerals Valuation

    By T. R. Ellis

    Many appraisers/valuers believe that the only valuation method available within the Cost Approach category for Real Property appraisal is the depreciated replacement cost method. Some valuation and fi

    Jan 1, 2011

  • SME
    Interaction Of Grade And Metallurgy Simulations In Assessing Uncertainty For Ore Routing Determinations In The Gold Quarry Deposit

    By M. Baumann

    Introduction Gold Quarry is one of the largest gold deposits in Nevada, located along the Carlin Trend, approximately seven miles north of Carlin, NV. Owned and operated by Newmont Mining Corporati

    Jan 1, 2007

  • SME
    Differential Separation Of Albite From Microcline By Monovalent Salts In Hf Medium

    By C. Demir, M. S. Celik, I. Gülgonul

    Na-feldspar (albite) and K-feldspar (microcline or orthoclase) are major feldspar minerals with identical crystal structures and physicochemical properties. Flotation appears to be a unique method of

    Jan 1, 2002

  • SME
    Critical Considerations in Robotic Seabed Drilling

    By Steve Stuart

    Deep-sea mineral SMS deposits present some of the world’s most challenging conditions for drilling equipment. As robotic seabed drilling services mature so too the ways that clients engage with servic

    Sep 1, 2014

  • SME
    An Equipment Selection Application Using The AHP Method

    By M. Yavuz

    Multiple Criteria Decision Making (MCDM) is one of the most considerable branches of Operation Research. MCDM refers to making decisions in the presence of multiple, usually conflicting, criteria. The

    Jan 1, 2007

  • SME
    Field Monitoring of Delayed Coal Burst in an Advancing Entry of a Deep Coal Mine - Mining, Metallurgy & Exploration (2021)

    By Shannon Seitz, Qingwen Shi, Junfeng Pan, Shuwen Wang, Brijes Mishra, Shaohong Liu

    Delayed coal bursts in deep coal mines have caused significant fatalities and economic losses in recent years. Instead of occurring right around the advancing face, this particular type of coal burst

    Oct 19, 2021

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996