Trenchless Utility Relocation Addresses Environmental Impact for Channel Crossing - NAT2022By John D. Hanifin, C. Kevin Moon, Eric C. Wang
Value Engineering on Connecticut DOT’s Walk Bridge selected the trenchless option for utility relocation to address the channel crossing’s environmental concerns. The design and construction considera
Dec 1, 2022
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997
-
Application of Predictive Maintenance Techniques for Large Electric Mining Shovels – Preprint 97-205By Michael Lenz
Predictive maintenance technologies including vibration analysis, tribology, infrared thermography, ultrasonic detection, and electrical measurements have been applied to large electric mining shovels
Feb 24, 1997
-
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic ShakingBy Bhaskar B. Thapa
The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet
Jan 1, 2008
-
Development of an instrumented longwall bit to measure coal cutting forces for use in developing noise controlsBy L. A. Alcorn, H. E. Camargo, G. Gwaltney
"One of the most pervasive diseases in the mining industry is noise-induced hearing loss. The exposure of miners to noise levels above the permissible exposure level results in hearing loss in approxi
Jan 1, 2014
-
Sustainable Mineral Development: Possibilities and Pitfalls illustrated by the Rise and Fall of Dutch Mineral Planning GuidanceBy M. J. van der Meulen
"The Netherlands has major resources of sand, gravel and clay, exploited mainly for construction works and the building materials industry. As in most western countries, mineral extraction meets with
Jan 1, 2005
-
Conversion Of A Tailing Impoundment To A Freshwater Reservoir, The Eagle Park Reservoir Project, Climax Mine, ColoradoBy J. L. Cupp, R. C. Ford, B. R. Romig
The Climax Molybdenum Mine, located near Leadville, Colorado, is the site of a lengthy mining history spanning more than 80 years. In the 1960’s, extraction of molybdenum from oxide ore located adjac
Jan 1, 1999
-
CFD Analysis on Gas Distribution for Different Scrubber Redirection Configurations in Sump CutBy J. P. Rider, T. W. Beck, J. A. Organiscak
"The National Institute for Occupational Safety and Health (NIOSH), Office of Mine Safety and Health Research (OMSHR) has recently developed a series of models utilizing Computational Fluid Dynamics (
Jan 1, 2015
-
Investigation of Induced Recirculation During Planned Ventilation System MaintenanceBy C. J. Pritchard
The Office of Mine Safety and Health Research (OMSHR) investigated ways to increase mine airflow to underground metal/nonmetal (M/NM) mine working areas to improve miners? health and safety. One of th
-
Ambitious Endeavors in Mechanized Shaft Construction: A Case History of Two Mine Shaft Projects in AustraliaBy John Zeni
In Australia during the 1990s, Zeni Drilling took on several demanding shaft boring contracts. This paper describes the safety, operational, technical and environmental advantages derived through the
Jan 1, 2001
-
Tunnel Protection by Ground Improvement Prior to Track LoweringBy Ronald E. Triplett, George K. Burke, Bernard H. Voor
To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which
Jan 1, 2001
-
Tunneling Alternatives For Subway Connection In Downtown ChicagoBy A. Ayoubian, V. Nasri
This Tunnel Connection project will include construction of two short tunnels to connect the existing subway tunnels (Red and Blue lines) in the northern loop area of downtown Chicago through a new st
Jan 1, 2007
-
Extraction Of Nonferrous Petals From High Salinity Brine Geothermal Brine By Sulfide Precipitation*By R. W. Bartlett
High salinity geothermal brines typically contain up to several hundred parts per million of valuable heavy metals, and because of the large potential flow of geothermal brines from future power plant
Jan 1, 1980
-
Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And PracticeBy Horst Pöchhacker
The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin
Jan 1, 1976
-
Coal Quality And Resources In The Us Gulf Coastal PlainBy J. C. Willett, J. R. Sanfilipo, P. D. Warwick
The U.S. Geological Survey has conducted an assessment of the Nation’s coal deposits that potentially could be mined during the next 30 or more years. For the Gulf Coastal Plain region, the assessmen
Jan 1, 2001
-
Wild World of Mining Appropriate Theme For Colorado MPD MeetingBy Steve Kral
Conference themes are usually chosen by organizers to reflect the current state of the industry. The Colorado Section MPD came up with what may be the most appropriate theme of a mining conference du
Jan 1, 2006
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO ProjectBy Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
National Mining Hall of Fame to Induct SevenSeven legendary figures of American mining will be enshrined in the National Mining Hall of Fame in ceremonies on Saturday, Sept. 7 at the Little America Hotel in Salt Lake City, UT. The 15th annu
Jan 1, 2002
-
Planning and Design of the A3 Hindhead Tunnel, Surrey, United KingdomBy Tom Ireland, Tony Rock
The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons
Jan 1, 2007
-
Lithologic and Structural Constraints on TBM Tunneling in New York CityBy Charles Merguerian
In medium- to high-grade metamorphic terrains such as found in New York City(NYC), rock mass texture and mineralogy are important factors in predicting TBM penetration destiny. Integration of data fro
Jan 1, 2005