Blasting and Groundwater Contamination – Case Study
By James Tarr, Matthew Eichler, Brent Tardif
ANFO was being used as one of the blasting agents on a construction site in New England. Groundwater was encountered in numerous blast holes. The blasting contractor was employing typical explosives l
Jan 1, 2003
-
479 Charges, 13 Decks...120 Meters Above a Crushing Plant
By Thierry Bernard
This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.
Jan 1, 2015
-
Uses for Blasting Instrumentation - Practical Applications
By Cam Thomas, Steve Bernard
Various types of blasting instrumentation can be used in the field to analyze conditions before, during and after a blast, and to indicate what changes need to be made. When different types of measure
Jan 1, 2012
-
Innovative Blasting Mine Life Extension at a Coal Mine in Australia
By R. Bitmead, R Barker, A. Drake
The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea
Jan 1, 2002
-
Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey
By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire
With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre
Jan 1, 2005
-
"Suppression of Dust Generation during Blast Demolition of ConcreteColumns"
By Chulgi Suk, Hoon Park, Hyonsoo Kim, Hakman Kim, Sangho Cho
Dust emission from blast demolition and other construction activities can be a nuisance; it is widely recognized that fine particles less than 10 µm in equivalent diameter (called PM10) may cause heal
Jan 1, 2016
-
Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.
By Grigor Mishev, Georgi Petrov, Benjamin Cebrian
Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra
Jan 1, 2016
-
Case Examples of Sensor Coupling Effect on Blast Vibration Measurement and Charge Weight Scaling Plot
By Gabsoo Kim, Rulin Yang, Dave Kay
Blast vibration data, such as PPV are usually scattered. In many cases, plots of PPV versus the charge weight scaled distance are so scattered that useful trends from different blast designs cannot be
Jan 1, 2014
-
Internships: A Bridge into the Explosives Industry
By Richard Hosley, James Daley
Every grey haired member of the explosive’s industry has said at least once, “We have to get some younger blood into our industry, I might want to retire someday.” And many a youngster who loves to se
Jan 1, 2014
-
The Effects of Short Delay Times on Rock Fragmentation
By Joseph Nawrocki, Margaret Hettinger, Dr. Catherine Johnson
"Optimized rock fragmentation is essential for minimizing downstream costs to mining operations.Photographic fragmentation analysis, vibration monitoring, and high-speed video all providemeasurements
Jan 1, 2016
-
EDZ Control in Nuclear Waste Disposal Facility in Finland
By Sanna Mustonen, Seppo Mellanen, Mellanen, Pekka Kantia
In Finland Posiva Oy (Company) is responsible for implementing the final disposal programme for spent nuclear fuel of its owners. Company is preparing for the geological disposal in Olkiluoto crystall
Jan 1, 2016
-
Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation
By Dale Preece
A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would
Jan 1, 2006
-
Production Blasting with Electronic Delay Detonators at Peak Quarry
By H G. Bosmare, G Bedser, C V. B Cunningham
Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl
Jan 1, 1998
-
Impact of Open-Pit Blasting on the Multi-Seam Workings of Adjoining Underground Coal Mine
By Ajoy K. Singh, B Mohanty, P K. Singh
A study was conducted to investigate the damage potential to underground multiseam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal exp
Jan 1, 2011
-
Novel Impulse Instrumentation for Buried Explosive Charges
By Phillip R. Mulligan, Kevin Gantz, Aaron J. Ward, allen shirley, Sean Treadway
Understanding the impulse transferred into a structure by the coupled two-phase loading produced by an explosive charge buried in soil is of interest for various applications. The most common impulse
Jan 1, 2016
-
Small Scale Study of Damage Due to Blasting and Implications on Crushing and Grinding
By C. Pelley, S. Kelebek, S. Gregersen, P. Katsabanis
A series of small scale tests have been conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the physical properties of the rock as well as its resistance to crushin
Jan 1, 2003
-
Study on Safe Criterion of Blasting Excavating Oil-Gas Pipeline Ditches
By Qi Shifu, Guo Tao, Liu Haoquan, Yao Chaogui, Zheng Li
Abstract: To excavate oil-gas pipeline ditches in a rocky region or area the explosive method is needed. When a parallel ditch is to be dug by blasting near or in the vicinity of an existing pipeline,
Jan 1, 2014
-
Modified Case Charge for Avalanche Control
By Eduardo Lozano, Vilem Petr
This paper provides an overview of a new method for avalanche control using a high explosive charge placed at the avalanche runout zone: the case charge technique. This new avalanche control technique
Jan 1, 2018
-
Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk
By Enver Alan
This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the
-
Development of a Wireless Sensor Network for Blast Monitoring and Slope Stability
By Johnny Lyons-Baral, John Kemeny, Don Kraemer
Ground vibrations from blasting can result in the degradation and failure of rock and soil exposures, as well as damaging neighboring houses and buildings. At the same time, vibration provides an oppo
Jan 1, 2014