Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Mitigating Loaded Blast Patterns Buried Beneath a High Wall Failure

    By Aiden Carey, Jim Kennedy

    During December 2007, Lake Cowal Gold Mine located in New South Wales, Australia experienced a significant pit wall failure. The wall failure resulted in the deposition of a large quantity of saprolit

    Jan 1, 2011

  • ISEE
    Improved Signature Hole Technique – What is a Signature Waveform?

    By Jhon Silva

    "Signature Hole and Waveform Superposition techniques used to predict and control mine blast ground vibrations require a clearly defined information collection configuration. The collection of this in

    Jan 1, 2017

  • ISEE
    Slope stability through the application of low-energy explosives technology

    By Jorge Cárdenas, Diego Gamarra

    In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they

    Jan 21, 2025

  • ISEE
    Mountain Mass Surrenders to Man's Initiative & Daring

    By Yogesh Narula

    Nevis Bluff Landslide - On September 17” 2000, a rockfall measuring lO,OOOm3 at Nevis Bluff, New Zealand, triggered a loday emergency. It ended when a hazardous column of rock that towered over State

    Jan 1, 2002

  • ISEE
    Journal: 16th Annual Photo and Art Contest / Best of Show Power Line Pass Kemano, British Columbia, Canada

    By Corry Goumans

    Description of Project: Drilling, Blasting and Installation of Catenary Cables. Project Owner: Rio Tinto Alcan

    Jan 1, 2010

  • ISEE
    Segregation Blasting Using Electronic Initiation at the Coeur Rochester Mine, Nevada

    By Donald Wagstaff, D. Scott Scovire

    The Coeur Rochester Mine is the largest primary silver surface mine in North America. Throughout its 17-year life, gold and silver grades leaving the tertiary crusher have typically been, on average,

    Jan 1, 2004

  • ISEE
    Method of Blasting Using Air Tubes Charged in a Blasthole

    By Dae-Woo Kang, Sang-Wook Kim, Shin Lee

    The Air-tubes blasting method is provided in which a series of aligned boreholes are charged with explosive s and air tubes in a predetermined blasting pattern. The air tube is composed of cylindrical

    Jan 1, 2005

  • ISEE
    Vibration Control In Open Cut Mine Through Pre-Loading Applying Wireless Detonators

    By C. Feliciano, M. Cavalcante

    A large iron ore open pit mine in Brazil operates with reduced blast sizes, due to the imminence of red alerts in the rainy season and the proximity of plant and dam structures that demand control of

    Jan 1, 2024

  • ISEE
    Shock Tube Detonator Shelf Life in Relation to Timing Accuracy

    By Joshua Hoffman, Philip Mulligan, Braden Lusk, Tristan Worsey

    Blasters rely upon detonators to achieve the designed timing sequence to move material where it needs to go, minimize vibration, or optimize fragmentation. At times detonator inventory on seldom used

    Jan 1, 2013

  • ISEE
    Blasting Optimization using 3D Photogrammetry in a South Brazilian Quarry

    By L. O. Souza, J. F. Gewher, M. P. Scussiatto, C. S. Mendonca, R. A. McClure, B. T. Kuckartz, J. Kloeckner

    Blasting is the most effective and economical tool available to fragment and move rock for most applications. If properly executed, it can improve down-stream operations such as loading, hauling and c

    Jan 1, 2013

  • ISEE
    Initiation System Accuracy Helps Amax Coal Company's Ayrshire Mine in Southern Indiana

    By Roger L. Keller, John Dean Smith

    The Amax Coal Company's Ayrshire Mine in Southern Indiana is faced with one of the toughest blasting applications concerning vibration in the nation. As a means of maintaining regulatory compliance th

    Jan 1, 1987

  • ISEE
    Journal: Lightning - Understanding the Danger, Managing the Risk.

    By Greg Quinn

    After a long week of work in Colorado Springs this past July, I was looking forward to flying home to start a long anticipated family vacation. As I grabbed my seat on the plane, a man sitting next to

    Jan 1, 2012

  • ISEE
    Energy, Strength and Performance, and Their Implications in Rating Commercial Explosives

    By B Mohanty

    Several parameters such as, Energy, Strength, Brisance, Impulse, and Bubble Energy, are in common use in the explosives industry today to rate commercial explosives in terms of blasting performance. H

    Jan 1, 1981

  • ISEE
    TABLE OF CONTENTS 2023 General Proceedings

    By NA NA

    None

    Feb 6, 2023

  • ISEE
    Journal: 100 Years / E.I. DU PONT DE NEMOURS POWDER COMPANY PRICE LIST NO. 4 APRIL 1, 1911

    By Robert Hopler

    RBH Note: At the time of this price list the handwriting was already on the wall regarding the ultimate breakup of the company under the Sherman Anti-Trust Act. The brand names Atlas and Hercules, not

    Jan 1, 2012

  • ISEE
    Low Powder Factor Blasting to Take Advantage of Natural Rock Fissures is Uneconomical

    By R. F. Favreau, Patrice Favreau

    In many quarries and construction sites visited by the authors over the last 50 years, the latter have observed muck piles from blasting with explosives, which included numerous large blocks, in some

    Jan 1, 2018

  • ISEE
    Saudi Arabia Transition to Mining – Blast Optimization at Maaden Gold Mines

    By Angel Rafael Fernandez, Yahya Khader Al-Harbi, Benjamin Cebrian Romo, Antonio Morato Medina

    The kingdom of Saudi Arabia has set the goal to diversify their economy from oil into different fields including mining. As the vast Arabian Peninsula is explored, orebodies of Aluminium, Copper, Gold

    Feb 6, 2023

  • ISEE
    New Horizons of the Engineering of Blasting in Service of Productivity: Selective Sequencing

    By Matias Suarez, Diego Zenteno

    This paper is aimed to display the new advancements of blasting engineering done in different mining sites throughout the country, associated to electronic sequencing, energy of the explosive and its

    Feb 1, 2020

  • ISEE
    New Horizons of the Engineering of Blasting in Service of Productivity: Selective Sequencing

    By Matias Suarez, Diego Zenteno

    It is known that the introduction of electronic timing in the sequencing of blasting has changed the vision and way in which mining is developed. It is possible to deal with more complex and sophistic

  • ISEE
    Journal: The History of Safety Fuse Production Burn, Baby, Burn

    By John Brennan

    Necessity, they say, is the mother of invention. Certainly that sentiment held true during the early stages of explosive engineering. While seaside forts were concerned over static ignition of their b

    Jan 1, 2011