Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Innovative Methods for Underground Parking in Central Cities
By Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu
"Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni
Jan 1, 2017
-
A Brand New Barrier Wall Installed at Wolf Creek Dam
By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
Recent Experience With The Omega Pile And New Applications - Synopsis
By Maurice Bottiau
The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the
Jan 1, 1996
-
Cut-Off Walls For Diamond Mining In The Arctic
By Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Pile Design, Testing, And Installation For A Gated Dam ? Synopsis
By B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Design Of The Drilled Shaft Foundations For The Cooper River Bridge
By Liang Shen
The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South
Jan 1, 2013
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist
By James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Overview of Design and Practice of SDS Piles in China
By Gang Guo, Zhong Liu, Yi Zhang, Jingchun Lu
"Abstract Application of soil displacement screw pile (known as SDS pile) has been experiencing accelerated growth in Chinese deep foundation industry because of its technical advantages, environmenta
Jan 1, 2014
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations
By Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Non-Linear Analysis Of Laterally Loaded Piles: Calibration Of A New Method
By Vasileios A. Drosos
The response of pile foundations to lateral loads is an important factor for the successful performance of several critical structures. A new numerical code for the analysis of single piles under late
Jan 1, 2006
-
Overview Of Design Methods Of Axially Loaded Piles In Europe
By Flor De Cock
The paper reflects part of the work from the European Regional Technical Committee on Piles (ERTC3) during its mandate between 1994 and 1999, and, in particular, describes the findings from an Intern
Jan 1, 2002
-
Anchoring Tall Buildings In Lower Manhattan
By Andrew Pontecorvo
The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,
Jan 1, 2011
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load Tests
By Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Recommended Steps And Procedures For Planning And Performing A Geotechnical Investigation For A Seismic Retrofit ? Introduction
By Mark DeSalvatore
Currently, at Caltrans, the Office of Structure Design is carrying out an extensive seismic retrofit program involving transportation structures throughout California. The goal of the retrofit program
Jan 1, 1993
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary
By Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Man - Organisation - Technology - Proposals For Optimising Preventive Work
By Walter Ensinger
Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l
Jan 1, 2006
-
-
Deep Foundations In Hong Kong - Synopsis
By Martin Pratt
This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr
Jan 1, 2000
-
Piling Problems - Introduction
By D. Millgard
Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.
Jan 1, 1991
-
Alternative Design and Construction Method for Clinton CSO Underground Storage Facility
By Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015