Back-Calculations Of Centrifuge Tests On Pile Groups Subjected To High-Cyclic LoadingBy Torsten Wichtmann, Jan Macheck, Frederik Broz, Patrick Staubach, Hauke Zachert
The majority of heavy or strongly loaded structures, for instance high-rise buildings, large span bridges or gas storage tanks are founded on pile groups. However, current design codes and guidelines
May 1, 2022
-
Micropiles Take Off at Dulles AirportBy Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Pile Foundation Solutions in the Deep Quaternary Sediments of Botany BayBy Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski
"The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction
Jan 1, 1900
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachBy M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Predicting Geotechnical Drilled Shaft Capacity: Are We Close?By James G. Ulinski, Sebastian Lobo-Guerrero, Vishal B. Patel
"Recently modified design equations used in the transportation industry to calculate side friction and end bearing capacity for drilled shafts are now providing more realistic estimations of capacitie
Jan 1, 2017
-
Use of Isolated Tie-Back Plates to Stabilize a Landslide in Steep TerrainBy Scott D. Neely, Donald R. Clark
"An existing landslide located at the southeast corner of the Telluride Regional Airport has been in an active state of failure for several years. The presence of the landslide has represented an on-g
Jan 1, 2015
-
Wadi Dayqah Dam CurtainBy Frank Haehnig, Harald Krenn, Harm-Christoph Claassen
"The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the
Jan 1, 2016
-
Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction EffectsBy Moritz Schleeh, Christian Moormann
Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s
May 1, 2022
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005
-
Design Issues for Mini-Caissons in the NYC AreaBy Caciola Jr. Joseph J., Nidal M. AbiSaab
"Thanks in great part to the geology of the New York City Metropolitan area, mini-caissons are a popular choice for deep foundations. These drilled elements are readily available, easy to install with
Jan 1, 2016
-
Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity PilesBy W. G. K. Fleming
Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m
Jan 1, 1991
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
Making Foundation Design Courses More Engaging and Effective for StudentsBy Evangelia Ieronymaki
Civil engineering education relies on traditional methods of teaching, comprising mostly of deductive instruction by presenting the theory, followed by applications. This paper presents an alternative
Jan 1, 2019
-
Alternative Binder For Ground Improvement To Reduce Co2 FootprintBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
The Sandbukta-Moss-Såstad (SMS) project is a part of the Intercity development project, which is part of the largest transport project in Norway, consisting of 270 km of new double-track rail. The SMS
May 1, 2022
-
Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall BuildingBy Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016
-
Deep-Sea Quay Wall for Offshore Wind Energy Terminal on Maasvlakte 2 Rotterdam – NLBy Patrick van der Schaaf
"During 2016, foundation piling works were completed to allow for the construction of a production and storage/handling terminal in Rotterdam. It is there that steel foundations will be produced for o
Jan 1, 1900
-
A Fully Connected Jobsite is a Must for the FutureBy Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019