    Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37

    By Gordon Chen

    The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the

    Jan 1, 2009

  • DFI
    Self Drilling Soil Nail Systems To Retain Caving Soils

    By Ali Porbaha

    The use of soil nailing technology as a cost effective alternative for excavation support and slope stabilization has substantially increased in the United States during the last decade. For example,

    Jan 1, 2006

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • DFI
    The Equilibrium Point Method Of Analysis For The Statnamic Loading Test With Supporting Case Histories

    By R. G. Horvath

    The Statnamic loading test is a new and innovative method for testing deep foundations. The test is relatively inexpensive, quick, easily mobilized, provides for direct measurement of applied load and

    Jan 1, 1993

  • DFI
    3 Recent Developments In Pile Design - Developments In Pile Design

    By W. F. Van Impe

    The design of piles and of pile groups has remarkably progressed over the past two decades. The in­creasing complexity of the building concept implements a more rational approach of the deep foundatio

    Jan 1, 1994

  • DFI
    Comparison Of Dynamic And Static Methods Of Evaluating Static Pile Capacity - Synopsis

    By Harpal Parmar

    This paper evaluates dynamic methods of pile capacity prediction by comparing their results to static load test results. Dynamic and static pile load test data were assembled from four southeastern st

    Jan 1, 1996

  • DFI
    Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? Synopsis

    By H. Meseck

    Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr

    Jan 1, 2010

  • DFI
    Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?

    By Bernard Hertlein

    ¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser

    Jan 1, 2001

  • DFI
    Slurry Wall Design for Construction Using Soil Structure Interaction

    By Nino Catalano, Meeok Kim, Gordon Chen

    "The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr

    Jan 1, 2017

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992

  • DFI
    An Innovative Approach To Load Testing Of High Capacity Piles

    By P. Bermingham

    A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma

    Jan 1, 1989

  • DFI
    Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded Shafts

    By Cheng Lin

    The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a

    Jan 1, 2009

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Modelling For Consolidation Around The Pile Tip

    By Emöke Imre

    A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical

    Jan 1, 2002

  • DFI
    Operator Independent Installation Of Lime Cement (L/C) Columns

    By Tobias Hansson

    The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva

    Jan 1, 2000

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2005

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2008

  • DFI
    Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? Synopsis

    By D. Goossens

    Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the

    Jan 1, 1996

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • DFI
    Wharf Reconstruction At Gasps Sandy Beach - Historic

    Port Gaspé is located on the back side of Gaspé bay and is protected by a natural sand barrier with a length of 2,5 km, from which it got its name, Gaspé Sandy Beach (1). Since 1904 the Gaspé regi

    Jan 1, 1987