Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AIME
    Who's Who in Mineral Engineering - The 1979 Directory of the Society of Mining Engineers of AIME

    Who's Who in Mineral Engineering - The 1979 Directory of the Society of Mining Engineers of AIME

    Jan 7, 1979

  • AIME
    Do's And Don'ts Of Installation - A Designer's View

    By Allan D. Taylor

    INTRODUCTION From the designer's view, the installation starts with the first definition of the orebody, and progresses through a long and complex development. The design is affected not only

    Jan 1, 1982

  • AIME
    Minerals Beneficiation - Dry Magnetic Separation of Finely Ground Magnetite: Graphical Solution for Separator Design

    By O. E. Palasvirta

    Several drum-type, low-intensity dry magnetic separators have recently been described 1,2,3,4 all of which share at least two generic similarities. The magnet consists of a multiplicity of poles of al

    Jan 1, 1961

  • AIME
    Reservoir Engineering - General - Flow Test Analysis for a Well with Radial Discontinuity

    By A. S. Odeh

    During the last few years, several authors1-6 have advanced mathematical solutions, both exact and approximate, to the pressure behavior of a well producing from a region bounded by a circular discont

    Jan 1, 1970

  • AIME
    Technical Note - The Structure at a Cleavage Surface in Ferrite (Metals Tech., Dec. 1948, TN 8)

    By F. C. Wagner, E. P. Klier, D. E. Nulk

    The presence or absence of plastic strain at a cleavarage surface is a question of much importance, and upon its answer depends future possible theoretical work. To investigate this

    Jan 1, 1949

  • AIME
    A Sea-Level Canal At Panama-A Study Of Its Desirability And Feasibility.

    By Henry G. Granger

    NOTHING in this paper is to be understood as even suggesting a moment's suspension of the splendid work now going forward on the Isthmus of Panama, except so far as it is related to the proposed

    Jan 1, 1909

  • AIME
    Mine Ventilation in 1930

    By R. R. Sayers

    THE South African Mining and Engineering Journal recently pointed out that no satisfactory solution of the question of compensation for silicosis can be arrived at by placing further liability of an i

    Jan 1, 1931

  • AIME
    Flameless Combustion.

    By Carleton Ellis

    (Presented at a meeting of the New York Local Section of the Institute, Apr. 12, 1912.) I. INTRODUCTION. THE problem of the influence of hot surfaces upon gaseous combustion is one which, from a pur

    Sep 1, 1912

  • AIME
    Producing-Equipment, Methods and Materials - Well Interference

    By J. E. Warren, J. H. Hartsock

    An asymptotic solution to the equation that describes the flow of a slightly compressible fluid in an infinite porous medium has been used to estimate the interaction between two adjacent wells produc

  • AIME
    A Study of the Heat Treatment, Microstructure and Hardness of 60 :40 Brass

    By Frances Hurd

    WHEN 60:40 brass is heated to 825° C., given a drastic quench to obtain the beta solid solution, and reheated, various changes take place in the structure. Reheating at 200' C. causes a fine, gra

    Jan 1, 1927

  • AIME
    Minerals Beneficiation - Tailing Disposal at the Morenci Concentrator

    By P. F. Allen

    WITH capacity of 51,000 tpd, the Morenci concentrator produces approximately 49,000 tons of tailing for final deposition. Disposal involves distribution of thickened tailing to dams in such a manner t

    Jan 1, 1957

  • AIME
    Inclusions-Their Effect, Solubility and Control in Cast Steel

    By C. E. Sims

    THE following presentation is more a summation of observations made and conclusions drawn over a period of three to four years than a report of experiments made with a definite objective. Tests were m

    Jan 1, 1932

  • AIME
    Some Important Factors Controlling the Crystal Macrostructure of Copper Wire Bars

    By L. H. DeWald

    During the examination of various commercial brands of copper wire bars, which had exhibited different degrees of adaptability for being drawn into fine gages of wire by the present-day high speed mac

    Jan 1, 1931

  • AIME
    Institute of Metals Division - Beta Phase Parameters in the System Ti-V-Mo

    By Jack L. Taylor

    As expected from similar crystal structures and favorable atomic size factors, titanium, vanadium, and molybdenum are completely soluble in one another above the transformation temperature of titanium

    Jan 1, 1957

  • AIME
  • AIME
    On Chimney Druaght

    By B. W. Prof. Frazier

    I PROPOSE in this paper to treat of the chimney merely as a heat engine, as one of the devices resorted to in practice for the conversion of heat into mechanical work. For the sake of simplicity and c

    Jan 1, 1882

  • AIME
    The Petroleum Industry - Increased Domestic Business Activity, and the European War Improves the Export Outlook

    By Basil B. Zavoico

    PRODUCTION of crude it in the United States during 1939 totaled about 1.255,776,000 barrels, an average of 3,440,482 barrels per day, 3.41 per cent above the 1938 output of 1,214,355,000 barrels but 1

    Jan 1, 1940

  • AIME
    Spectrum Analysis In An Industrial Laboratory

    By W. H. Bassett

    THE ease and value of the application of spectrum analysis to industrial chemistry appears to be appreciated in few of the large works laboratories of this country. For 8 years, this analysis has been

    Jan 2, 1922

  • AIME
    Comparative Tests on Drill-Steel Breakage

    By S. S. Clarke

    ABOUT two years ago some of my friends were discussing the amount of drill-steel breakage that was permissible or not excessive, per month, per rock ton, per ton of steel or any unit of measure or out

    Jan 1, 1933

  • AIME
    Producing-Equipment, Methods and Materials - Perforating of Multiple Tubingless Completions

    By W. T. Bell, M. P. Lebourg

    The perforating of multiple tubingless completions, in which two or more strings of 27/8-in. OD casing are installed in the same borehole, presents two basic problems. First, good completion practices