Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated Floor
By Weidong Pan, Yinchao Yang, Baodong Zuo
Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining
Jan 1, 2017
-
Ground Control In South African Coal Mines - A U.S. Perspective
By Christopher Mark
After the United States and Australia, South Africa has the largest. modern underground coal mining industry in the world. Historically, South Africa has been the cradle of many innovations in ground
Jan 1, 1999
-
Comparison of Acoustic Emission and Stress Measurement Results to Evaluate the Application of the Kaiser Effect for Stress Determination in Underground Mines
By Lorraine Kent
Comparison of in-situ stress overcore measurement results with those determined from laboratory evaluation of Acoustic Emission (AE) testing on oriented sub-core samples has been carried out for a var
Jan 1, 2002
-
A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines
A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic
Jan 1, 1988
-
Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization
By David P. Conover, Jake Bain, Christopher M. Ross
"Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining
Jan 1, 2017
-
Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining
By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes
"Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results
Jan 1, 2010
-
Pre-Driven Experimental Longwall Recovery Room Under Weak Roof Conditions - Design, Implementation, and Evaluation
By Stephen Tadolini
Reduction in the time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. While this concept is no
Jan 1, 2002
-
Field Testing of a Real Time Roof Mapping Drilling Display System in a Limestone Mine
By Craig Collins
The objective was to develop a Real Time Drilling Display System for Rotary Roof Bolting using Analyzing Software to display mapped holes as they are being drilled in real time. The Analyzing Softw
Jan 1, 2004
-
Stooping Low Safety Factor Pillars At Goedehoop Colliery
By Gift Makusha
The Witbank Coalfield in South Africa contains up to five economically viable coal seams. These seams have been mined continuously for over 100 years and the reserve in now becoming depleted. The norm
Jan 1, 2003
-
Systematic Principles of Surrounding Rock Control in Longwall Mining within Thick Coal Seams
By Zhaohui Wang, Jiachen Wang
"Effective surrounding rock control is a prerequisite for realizing safe mining in underground longwall faces. In the past three decades, longwall top-coal caving mining (LTCC) and single pass large h
Jan 1, 2018
-
Jointing Effects On Pillar Strength
By Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Design Aspects In Multiple-Seam Mining: Case Studies
By Gregory J. Chekan
Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are i
Jan 1, 1990
-
Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams
By Peter Zhang
"Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa
Jan 1, 2017
-
The Initial Performance of Commonly Used Primary Support on U.S. Coal Mines
By Murali Gadde
U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio
Jan 1, 2011
-
Methods Of Controlling Thick And Strong Roof In Longwall Mining
By Deren Zhu
The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat
Jan 1, 1990
-
Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining Methods
By Bruce K. Hebblewhit
Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein
Jan 1, 2001
-
Risk Assessment: Multiseam - Single Seam Mining
By L. Munsamy
The bulk of primary mining at the Anglo Coal's Bank Colliery was carried out by drill and blast method, in a bord and pillar layout exploiting the No. 2 Seam. Secondary extraction, top/bottom coa
Jan 1, 2004
-
The Mechanical Property Of Coal Containing Gas (d5aeba01-a0db-4f86-a21e-adbcc6290eab)
By Yao Yuping
The strength and deformation of more than two hundred coal samples have been tested in the condition of triaxial compression. The regression equation showing the relationship between coal strength and
Jan 1, 1992
-
Application of Tensioned Cable Bolts for Supplemental Support
By Ben Mirabile, Alan Campoli, Rodney Poland
"The majority of U.S. underground coal mines use some form of cable bolt as supplemental support to a primary roof bolting system. Many coal operators employ the high load capacity of non-tensioned ca
Jan 1, 2010
-
Evaluating Techniques for Monitoring Rock Falls and Slope Stability (03558dcc-00ee-4336-8044-b80294644df0)
By Edward McHugh
While less than 1% of reported accidents are associated with slope stability problems. slope failures were responsible for about 15% of all U.S. surface mine fatalities between 1995 and 2001. Small ro
Jan 1, 2002