Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988

  • SME-ICGCM
    A Case Study Of A Deformation Mechanism Around A Two-Entry Gate-Road System Involving Probable Time-Dependent Behavior

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms around a longwall gate-road system in an underground coal mine. Of particular interest was roof defo

    Jan 1, 1995

  • SME-ICGCM
    BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and Application

    By Dan Payne

    Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid

    Jan 1, 2006

  • SME-ICGCM
    Initial Results From Implementing a Laminated Overburden Model Into ARMPS

    By Peng Zhang

    In a recent research effort, a laminated overburden loading model (as implemented in LaModel3.0 was compared with the results of ARMPS 2010, and the laminated overburden model was found to more accura

    Jan 1, 2013

  • SME-ICGCM
    A New Approach To The Design Of Multi-Entry Developments For Retreat Longwall Mining (b0ac6f64-13ae-4c08-a631-b7e01a7e984e)

    By Frederick Carr

    1. The application of retreat longwall mining to the North American coal mining conditions is be¬coming more advantageous as more experience is gained. The productivity results being achieved and pote

    Jan 1, 1982

  • SME-ICGCM
    The Implementation of Rock Mechanics Into a Multiple Level Limestone Mine

    By David A. Newman

    In the 1950s, an underground limestone mine in the Camp Nelson Formation was developed from an outcrop exposure. The Camp Nelson Limestone met the requirements for DOT stone and aggregate. The mine

    Jan 1, 2014

  • SME-ICGCM
    Evaluation Of Subsidence Parameters For Inclined Seams In UK Coalfields

    By X. L. Yao

    This paper analyses the effects of mining extraction geometry (width/depth ratio) and dip of seam on subsidence parameters based on a large Database, containing 120 longwall mining cases all within th

    Jan 1, 1990

  • SME-ICGCM
    Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining Operations

    By Yi Luo

    The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c

    Jan 1, 2003

  • SME-ICGCM
    A Decade of Mobile Roof Support Application in the United States

    By Larry Howe

    Second, or retreat mhng with Mobile Roof Supports (MRS) has now been part of coal mining in the United States for a decade Their utilization has evolved into mining applications which vary in seam hei

    Jan 1, 1998

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    The Advance And Relieve Mining Method: A Horizontal Stress Control Technique

    By Frank E. Chase

    Sacrificial entries, roof slotting, and other tactics have been used to combat high horizontal stresses during roadway development in U.S. coal mines. In Australia, the "pillar extraction on the advan

    Jan 1, 1999

  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Monitoring Of Longwall Seal Behaviour For Permeability And Stress Changes

    By Ken Mills

    Dartbrook Mine (Australia) works the Wynn seam, which has a moderate propensity for spontaneous combustion. Prior to any mining a commitment was made to place a segregation barrier pillar between long

    Jan 1, 1999

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    Design Factors In Near-Seam Interaction

    By A. Grenoble

    The mining of seams in close proximity can greatly accentuate interaction problems. At distances of less than 110 feet vertically interaction can occur for both over and under mining. Research into gr

    Jan 1, 1984

  • SME-ICGCM
    Effect of In Situ Stresses on the Stability of Coal Mine Development Workings

    By Murali Gadde

    Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat

    Jan 1, 2004

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Understanding the Causes of Roof Control Problems on a Longwall Face From Shield Monitoring Data ? A Case Study

    By Robert Trueman

    This paper details the results of an assessment aimed at understanding the shield loading mechanisms associated with strata-related issues on a longwall face. Shield load cycle analysis theories devel

    Jan 1, 2011

  • SME-ICGCM
    Load Deformation Behavior Of Simulated Longwall Gob Material

    By Deno M. Pappas

    The purpose of this U.S. Bureau of Mines study was to determine the material stiffness properties of the gob for use in numerical models of rock mass response to longwall mining. Photographs of actual

    Jan 1, 1993