Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Numerical Model Calibration for Simulating Coal Ribs (da729951-bd49-415c-b364-03a4e38bfd9c)
By Michael Murphy, Khaled M. Mohamed, Berk Tulu
"Failures of coal ribs are major hazards in underground coal mines. For the period of 2010 to 2014, rib falls were the leading cause of groundfall fatalities and accounted for 35% of all groundfall-re
Jan 1, 2016
-
Development of CAN Manipulator
By Brian E. Perrine
Underground mining requires a variety of specialized equipment. With ever-changing mining conditions and methods, some mines have had to resort to purchasing existing industrial equipment and adapting
Jan 1, 2013
-
Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover
By Ashok Kumar, Rajendra Singh, Petr Waclawik
High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill
Jan 1, 2018
-
Measurements of Horizontal Shear Movements Ahead of Longwall Mining and Implications for Overburden Behaviour
By Jesse Puller, Ken W. Mills, Owen Salisbury
"An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic w
Jan 1, 2015
-
Site Characterization For Ultra-Close Multi-Seam Mining
By Yingxin Zhou
Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl
Jan 1, 1990
-
Application of Laser Scanning for Rock Mass Characterization and Discrete Fracture Network Generation in an Underground Limestone Mine
By Juan J. Monsalve, Nino Ripepi, Richard Bishop, Jon Baggett
"Terrestrial laser scanning (TLS) is a useful technology for rock mass characterization. A laser scanner produces a massive point cloud of a scanned area, such as an exposed rock surface in an undergr
Jan 1, 2018
-
Strata Control Investigations During Fully Mechanized Coal Pillar Extraction in Indian Coalfield
By Rajendra Singh
Considering the importance of a fully mechanized depillaring operation, the Indian coal mining industry has introduced a number of such depillaring operations at depths of cover ranging from 60 m to 3
Jan 1, 2014
-
Analysis of Ground Control Codes in the International Codes of the International Labour Organisation
By Kazem Oraee-Mirzamani, Nikzad Oraee-Mirzamani, Arash Goodarzi
"Unexpected movement of ground can potentially endanger lives, damage equipment or destroy property. Occupational accidents frequently occur with fatal consequences in developing countries with signif
Jan 1, 2010
-
Three?Dimensional Ground Stability Study Around a Mine Tunnel in a Highly Discontinuous Rock Mass under Significant in Situ Stress
By Pinnaduwa H. S. W. Kulatilake
To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior of the rockmass surrounding the underground mine excavation. The aim of
Jan 1, 2013
-
Ground Pressure Control With Use Of Freezing Rocks On The Ore Deposits Of Yakutia
By G. P. Neobutov
The near surface inclined gold ore deposit is mined out at freezing temperature. The replacement of ore pillars by artificial freezing rocks during the rock pressures control in this conditions presen
Jan 1, 1996
-
3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine
By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake
"Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and
Jan 1, 2016
-
Constraint Is The Prime Variable In Pillar Strength
By Clarence O. Babcock
Since Vicat in 1833, the width to height ratio of a mine pillar has been taken as the fundamental variable in pillar design. From work in the laboratory by many investigators testing rock, Coal and co
Jan 1, 1984
-
Evaluation of Drill Hole Geometry on Bolted Roof Beam Performance
By David R. Burkhard
"Comparative roof beam performance, as measured by delamination within the bolted horizon, was used to evaluate two types of roof bolt drill hole geometries in a development setting. Short encapsulati
Jan 1, 2016
-
Cross?Correlation Detection of Seismic Events Related to the Crandall Canyon Mine Collapse
By Tex M. Kubacki
On August 6, 2007, the Crandall Canyon Mine experienced a collapse which trapped six mine-workers. An MW 4.1 seismic event was recorded in conjunction with this collapse. An additional 54 seismic even
Jan 1, 2013
-
Coal Rib Response during Bench Mining: A Case Study
By Morgan M. Sears, Mark Van Dyke, Gamal Rashed, John Rusnak, Khaled Mohamed
"In 2016, room-and-pillar mining provided nearly 40% of underground coal production in the United States. Over the past decade, rib falls have resulted in 12 fatalities, representing 28% of the ground
Jan 1, 2017
-
Remote Sensing For Roof Control And Mine Planning: An Overview
By R. F. Valene
This paper is not available for inclusion in the Proceedings at the time of printing. but it will be included as an insert
Jan 1, 1984
-
Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof Strata
By Ashok Kumar, Rajendra Singh, Arun Kr. Singh
"A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un
Jan 1, 2018
-
Update: Analysis and Case Study of Impact?Resistant Steel Sets for Underground Roof Fall Rehabilitation
By Dakota Faulkner
Unexpected roof falls often occur in the entries or intersections of active mining sections in underground mines. For large roof falls (greater than 20 ft in height), it becomes dangerous and impract
Jan 1, 2014
-
Experience With The Boundary Element Method Of Numerical Modeling As A Tool To Resolve Complex Ground Control Problems
By George J. Karabin
The Roof Control Division of the Pittsburgh Safety and Health Technology Center, MS HA, is routinely involved in the evaluation of ground conditions in underground coal mines. Assessing the stability
Jan 1, 1994
-
Investigating the Contributing Factors to Rib Fatalities Through Historical Analysis
By Tristan H. Jones
Rib-related accidents in underground coal mines continue to cause injuries and take lives at a rate of 1.3 fatalities per year for the last 17 years. Prevention of these accidents cannot simply be a m
Jan 1, 2014