Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Development of a tool for assessing the environmental sustainability of mining facilities

    By G. Gaidajis, K. Angelakoglou

    The development of a tool for assessing the environmental sustainability of mining facilities is described in this study. The tool is based on the analysis of basic components of the examined system,

    Jan 1, 2011

  • SME
    Innovative NATM?Design For A Large Shallow Cavern At Stanford

    By Thomas Marcher

    Stanford Linear Accelerator Center (SLAC) is located in Menlo Park, CA. In order to allow for enhanced experiments, the current facilities required expansion. Tunnels were excavated through very weak

  • SME
    Recent Developments in the TBM Industry—New and Innovative Technologies

    By Martin Herrenknecht, Karin Bäppler

    The last five years have seen a remarkable increase in tunnelling projects in both soft ground and hard rock applications. Part of the increase is a result of recent Research & Development efforts to

    Jan 1, 2005

  • SME
    Industrial Minerals 2004 - Bromine

    By R. Frim, S. D. Ukeles

    The present U.S. production of bromine is from inland brines located in Arkansas and Michigan. The most concentrated domestic brines (up to 5,000 ppm bromide)are situated in Arkansas. Less concentra

    Jan 1, 2005

  • SME
    RockVision3D™ Applications to Delineate Hazardous Geologic and Stress Conditions in Coal Mines—Case Histories

    By K. Y. Haramy, K. Hanna

    Early identification of adverse geologic conditions and high stress concentrations during the high-speed extraction of coal using modern mechanized longwall systems is a major challenge facing the min

    Jan 1, 1999

  • SME
    Copper Prices Help Arizona’s Mining Industry

    By William R. Yernberg

    SME’s Arizona Conference was held at the Doubletree Hotel at Reid Park in Tucson on Dec. 5and 6, 2004. The annual conference is organized by the Arizona Conference Board of Directors, which represent

    Jan 1, 2005

  • SME
    Technical Note - Mine modifications for economic survival —a case study

    By R. L. Grayson, G. Mishra

    Introduction Many old underground mines have been developed extensively into reserves requiring large numbers of workers to maintain and rehabilitate lengthy track haulages and/or belt conveyor sys

    Jan 3, 1987

  • SME
    Innovative features of the Bridger Coal Company supply air fans and system

    By G. S. Takenaka

    When Bridger Coal Company transformed their operations from surface mining to an underground longwall operation their plans included not only the addition of new mining equipment but also surface fans

    Jan 1, 2009

  • SME
    Oilwell Cementing: What Is Next?

    By A. Mahmoudkhani

    Primary cementing is the process of placing cement in the annulus between the casing and the formations exposed to the wellbore. Portland cement was first used in 1903 in the Lopoc Field in California

    Jan 1, 2012

  • SME
    Paragenesis And Metal Associations In Interior Alaska Gold Deposits: An Example From The Fairbanks District (78a5358a-5cda-49ae-b93d-ba8558df1a55)

    By K. Severin, B. Flanigan, P. Marion

    “Plutonic-related” gold deposits in Interior and SW Alaska (Tintina Gold Belt) vary significantly in size, grade, vein/deposit morphology, depth of emplacement, distance from causative pluton and meta

    Jan 1, 2000

  • SME
    Successful Application Of Remote Seals Used To Extinguish A Coal-Mine Fire

    By D. Bour, C. Nyikos, R. Curtice

    Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti

    Jan 1, 2002

  • SME
    Rock Mass Characterization for the WSSC Bi-County Water Tunnel

    By Paul Headland

    The Washington Suburban Sanitary Commission (WSSC) has recently completed design for the Bi-County Water Tunnel Project. The project will include a 10-foot diameter, 5.3-mile long hard rock tunnel loc

    Jan 1, 2008

  • SME
    Role Of Gas Pressure In Underground Coal Mine Bursts And Bump

    Face and pillar bursts, bumps and bounces are violent failures that occur in underground coal mines in response to a complicated interplay of face and pillar geometry, seam depth, coal properties and

    Feb 27, 2013

  • SME
    Industrial Minerals 2003

    Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committees

    Jan 1, 2004

  • SME
    Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope

    By F. Djahanguiri

    The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv

    Jan 1, 1995

  • SME
    Flash Smelting at Magma Metals Co.

    By Tom Gonzales

    At San Manuel, AZ, Magma Metals Co. operates an Outokumpu flash furnace, four Peirce-Smith converters and two anode casting wheels that are supported by six anode vessels. Process gasses from the flas

    Jan 1, 1992

  • SME
    Investigation of Explosion Hazard in Longwall Coal Mines by Combining CFD with a 1/40th‑Scale Physical Model (Mining, Metallurgy & Exploration)

    By A. Juganda, F. WILSON, H. PINHEIRO, N. SANDOVAL, J. F. Brune, G. E. Bogin Jr.

    To evaluate methane explosion hazards in longwall coal mines, a CFD model was developed along with a 1/40th-scale, optically accessible model of an underground longwall coal mining section. In this pr

    Aug 15, 2022

  • SME
    Openpit limit optimization through databases: an open source for data analysis and reporting services

    By R. Benito

    The publication of the Lerchs Grossmann paper in 1965 outlining a threedimensional graph algorithm for ultimate pit definition set the standard for the mining industry regarding pit optimization. Alth

    Nov 1, 2013

  • SME
    Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build Contract

    By David Hake, David Salisbury

    The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT

    Jan 1, 2005

  • SME
    High Throughput, High Solids Flotation Of 20 X 200 Mesh North Carolina Phosphate In A Short Column Cell (e8f0823f-317a-4179-8746-73c484ba7427)

    By J. F. Hutwelker

    A pilot plant was constructed and operated to investigate the column flotation of 20 x 200 mesh North Carolina phosphate ore, using high throughput, high solids operating conditions developed at the N

    Jan 1, 1993