Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Creating Micro Fractures in Rock Fragments for Blasting Efficiency Improvement

    By S. Green, R. Yang

    Blasting is a commonly used method for rock fragmentation in mining operations for mineral extraction. It involves breaking the rock mass into small pieces, and ideally creating micro fractures within

    Jan 1, 2024

  • ISEE
    All In The Timing

    By Sean Paterson

    The purpose of this paper is to demonstrate a method of delaying and loading a shot. Since entering the construction industry, I have learned that cover is needed on a lot of blasts. When in close hav

    Jan 1, 2001

  • ISEE
    Developing Safety in United Kingdom Drilling Operations

    By Rob Farnfield, Ben Williams, Bob Woolley

    This paper outlines how drilling safety standards are being driven forward in the United Kingdom’s surface mining and quarrying industry with developments in equipment, procedures and competence.

    Jan 1, 2010

  • ISEE
    Improvement on the Fragmentation Results for Effect of the Reflective Planning Generated by the Pre-Split.

    By Jorge Cárdenas Miranda, Hector Espinoza

    Currently in open pit mining in Peru with double bench, it is a challenge to optimize fragmentation in the drill rows near to the slopes to ensure the performance in the loading and haulage operation

    Feb 6, 2023

  • ISEE
    The Influence of Time Error of Electric Detonators on the Amplitude of Vibration Generated by Blasting

    By Kis M

    The purpose of seismic control of blasting is to indicate the vibration magnitude or to eliminate the occurrence of vibration damage caused by blasting. At the Mining Research Institute in Hungary, a

    Jan 1, 1979

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members / Effects of Line or Channel Drilling on Vibration

    Hello, everyone. Way back in 1965, Devine and others at the US Bureau of Mines showed that a presplit fracture plane did not affect vibration levels transmitted across the plane (RI 6695).

    Jan 1, 2010

  • ISEE
    Journal: Blast Vibration and Seismograph Section / Post Blast Assessment Using Blasting Seismograph Data

    By Kenneth Eltschlager

    Post-blast assessment techniques using off-site data which includes location, seismograph and photographic data were discussed during the Blaster’s Weekend at this year’s ISEE Conference. Blast and pr

    Jan 1, 2007

  • ISEE
    Journal: Dynamite Daze

    By S. S. Bud Jenkins

    I went to an underground limestone mine recently to demonstrate the use of borehole liners. The liners were for horizontal holes in a normal “V” cut tunnel round. I hadn’t been in this mine for about

    Jan 1, 2010

  • ISEE
    Blasting and Its Control at Hydro Quebec

    By Wilfrid Comeau

    Since 1967 Hydro Quebec has undertaken the control of blasting and its effects at its power development sites. Blasts have been monitored using a commercially available three component seismograph. In

    Jan 1, 1977

  • ISEE
    Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit Pump

    By Stuart Brashear, Steven Bell, Donald Smith

    This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede

    Jan 21, 2025

  • ISEE
    Flyrock Prediction and Control in Surface Mine Blasting

    By J Lyall Workman, Peter N. Calder

    Flyrock can be a serious hazard associated with blasting. Many surface blasting accidents involving injury result from excessive flyrock beyond the protected blast zone. Numerous cases of equipment da

    Jan 1, 1994

  • ISEE
    Journal: Book Review / Micrometer Crack Response to Vibration and Weather

    By ISEE

    Micrometer Crack Response to Vibration and Weather, by Prof. Charles H. Dowding of Northwestern University, adds to Prof. Dowding’s already important contributions to the industry with his “Constructi

    Jan 1, 2010

  • ISEE
    Application of the NIOSH-Modified Holmberg-Persson Approach to Perimeter Blast Design

    By Chick Kerkering, Stephen Iverson

    Perimeter control blasting is common in civil construction projects but not as common in mining. A poorly designed and executed underground mine development blast design can result in unwanted wall ro

    Jan 1, 2008

  • ISEE
    The Real Relationship Between Cracks and Vibrations: Are Cracks in Buildings Really Created by Vibrations?

    By Thierry Bernard

    It was in the 1980s that USBM published one of the first regulations to protect constructions from the effects of vibrations caused by mine blasts. Several countries have made their own regulations or

    Jan 1, 2018

  • ISEE
    Journal: Effect of Depth Below Mudline of Charge Placement During Explosive Removal of Offshore Structures

    By Craig Adams, William Poe

    Introduction The United States Department of the Interior, Minerals Management Service (MMS) is mandated under the Outer Continental Shelf Lands Act (OCSL A) and the Energy Policy Act of 2005 to overs

    Jan 1, 2011

  • ISEE
    Why the 8MS Rule Doesn’t Work

    By D. Bartley, R. McClure, W. Reisz

    Ever since the 8ms criterion was developed in the early 60’s there has been an ongoing debate among many blasters as to its actual value in controlling ground vibration. The perpetuation of the myth s

    Jan 1, 2006

  • ISEE
    Managing Commercial Explosives Operations Using Quantitative Risk Assessment

    By Lon Santis

    This paper describes several applications of quantitative risk assessment in the management of commercial explosives operations. The Institute of Makers of Explosives’ (IME) quantitative risk assessme

    Jan 1, 2008

  • ISEE
    Computer Aided Blast Design for Tunnels

    By J L. Jethwa, A G. Gaithankar

    The paper deals with a software method developed to design the optimum blast parameters for tunnels and mine roadways for a given set of geo-mining condition without any major discontinuity. The appli

    Jan 1, 1993

  • ISEE
    A Study on High Accuracy Delay Detonator

    By H Fukui, K Ichikawa, K Aikou, E Suzuki

    An electronic delay detonator (EDD) consisting of a digital-base electronic delay module and a conventional instantaneous detonator module, designed for series connections with a special adjustable-ou

    Jan 1, 1989

  • ISEE
    Inverse Hybrid Method for Determining Pressure Loading on Plates Due To Buried Mines

    By Damien Bretall, William Fourney

    Due to the changing face of warfare there is an ever growing need to protect the underside of combat vehicles from mine blasts. This paper presents a new method to better characterize the pressure pro

    Jan 1, 2009