Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Electronic Detonator Failed by Electromagnetic Waves Emitted on Detonation of Nearby Explosive Charges

    By Tuan Nguyen, Dirk Hummel, Ruilin Yang

    In a tunnelling site in Japan, it was found that detonators failed to initiate with their shells and primary explosive intact. Their capacitors, however, were discharged due to some damage on the appl

    Feb 6, 2023

  • ISEE
    Improved Techniques for Reactive Ground, Density and Performance Testing of Bulk Explosives

    By Italo Onederra, Gary Cavanough, Ewan Sellers

    Reactivity of ammonium nitrate based explosives is associated with the presence of iron sulfides in the ground reacting with explosive products and in some instances causing spontaneous reactions whic

    Jan 1, 2018

  • ISEE
    A New Blasthole Location Error Detection and Compensation System for Open Pit Mines

    By S. Klerkx, R Battulwar, J Valencia, J Sattarvand, E Emami, M. Soleymani Shishvan

    A new technology for energy distribution optimization, supported by NIOSH.

    Feb 1, 2020

  • ISEE
    Electronic Initiation System in Fosterville Gold Mine Development

    By C. Zuniga, S. Combrinck, C. Peters

    Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t

    Feb 6, 2023

  • ISEE
    Perimeter Control Utilising Electronic Detonators

    By John Wall

    The use of electronic detonators in civil tunnelling applications, to reduce vibration is small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen

    Jan 1, 2012

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • ISEE
    Optimized Blasting Methods for TBM Launching Shaft Construction Beneath the Panama Canal: A Case Study

    By Jose Pineda, Abraham Lindo

    The Panama Metro System’s Network expansion involves excavating a launching shaft for a tunnel boring machine (TBM) to traverse beneath the Panama Canal. The blasting needed for this shaft constructio

    Jan 21, 2025

  • ISEE
    Drilling and Blasting on the Ty Nant Project.

    By Rob Farnfield, Ben Williams

    The A5 road in the United Kingdom forms an ancient and well-used route through the hills and mountains of North Wales. In the 1990?s a programme of work was conducted to upgrade the road to modern sta

    Jan 1, 2011

  • ISEE
    Measuring Blast Induced Damage by Applying the MASW Geophysical Method

    By Charles Zdazinsky

    Many blasting applications in the mining industry demand that the hard rock being blasted remains structurally competent. For example, pre-splitting is a common technique to reduce fracturing, and ope

    Jan 1, 2011

  • ISEE
    A Holistic Approach to the Drill and Blast Process

    By Tom BoBo, Seth Gering, Jeff Loeb

    Presenting a D&B feedback loop built on a well-designed blast, proven fragmentation analysis and blast monitoring solutions, underpinned by technology that not only increases profit from every blast,

    Feb 1, 2020

  • ISEE
    Dynamic Mud Flow Effects on Emulsion Explosives in Indonesia

    By Garfiansyah Rayes

    In 2023, an Indonesian coal mine experienced significant contamination of an emulsion blend explosive by dynamic mud and water flow, triggered by flooding due to exceptionally high rainfall. This intr

    Jan 21, 2025

  • ISEE
    Blast Vibration Monitoring, Prediction and Control at Old Cliffe Hill Quarry

    By Rob Farnfield, Mark Pegden

    Old Cliffe Hill quarry produces between 4 and 5 million tonnes of crushed granite per year and is located in the county of Leicestershire in the East Midlands region of England. Blasting is carried ou

    Jan 1, 2010

  • ISEE
    Application, monitoring, and control of vibrations induced by underground rock blasting using a near-field methodology

    By A. Gontijo, A. Matos, P. Lincoln, L. Fonsecail

    This paper investigates how to manage and model the vibrations caused by rock blasting in a Brazilian underground mine. Considering the frequent detonations and the previous lack of effective vibratio

    Jan 1, 2024

  • ISEE
    Determination of Seismic Velocity from Quarry Blasts Using GPS Enabled Vibration Monitors

    By William. J. Birch, Catherine. E. Johnson, Robert Farnfield

    Rocks and other materials can be characterized by their elastic properties. However, seismic velocities represent a more practical set of physical properties for seismic methods. Seismic velocities de

    Feb 6, 2023

  • ISEE
    Time Window Vibration Control Techniques Cautionary Tales For Explosives Engineers

    By Adrian Moore, Alan Richards

    Time window techniques that limit the explosive charge mass being fired within a specified time window (commonly 8 milliseconds (ms)) have been used for many years and are widely accepted by explosive

    Jan 1, 2002

  • ISEE
    Mitigation and Management of Blast Generated Fume in Eastern Australia

    By Muamer Medusalic, Kim Henley, Lucas Bottomley

    The period from 2009 to 2012 has witnessed a large rise in the number of blast-generated fume events in Eastern Australia, where highly visible oxides of nitrogen (NOx) are produced from coal mine bla

    Jan 1, 2012

  • ISEE
    Modeling VOD and Initiation Effects on Blast Vibration PPV Using Nonlinear Charge Weight Scaling and Variable Time-window for Charge Elements

    By Mathias Jern, Ruilin Yang

    A blast vibration model has been developed that simulates effects of almost all blast design parameters on the blast vibration peak particle velocity (PPV) from a production blast with multiple blasth

    Jan 1, 2019

  • ISEE
    Signature Hole Method for Ground Vibration and Airblast in Mine Blasting; Convolution or Superposition?

    By B T. Lusk, John J. Silva Castro

    The signature hole method uses a convolution operation to predict the waveform of a production blast based on the record of a waveform produced by a single blast hole. Convolution is a mathematical op

    Jan 1, 2014

  • ISEE
    Wave Analysis and Determination of Interference Times to Minimize the Impact of Vibrations

    By Carlos Pañura, Michael Geldres, Alejandro Rojas

    The vibration waves are produced by the detonation of the explosive charges of each blasthole, analyzing the vibration waves produced by each blasthole, allow us to determine the optimal time between

    Feb 1, 2020

  • ISEE
    Digitization for Optimization: Easier and Cheaper

    By Benjamin Cebrián, María Gil, David Flores

    In many occasions during the Mining operation life, blasting engineers find different and controversial results of fragmentation, dilution or wall control for the same geotechnical domain and blast de