Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    List Of Delegates

    AUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,

    Jan 1, 1994

  • DFI
    History Of Timber Piles And Preservation Techniques - A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982

    By Bruce Haldeman

    Timber has been used as pile support for structures for 6,000 years. Some means of preservation of wood go back almost that far. Timber piles support all types of structures ? some are buried below th

    Jan 1, 1984

  • DFI
    "Value Engineering" In United States Of America

    By Maral Papazian Bedian

    Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng

    Jan 1, 2002

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • DFI
    Ground Disturbance Due to Static Pressure Driving of Opened-Ended PHC Piles

    By Xiaocen Lu, Guowei Li, Jiantao Wu, Thang N. Nguyen, Andrew C. Amenuvor

    "This paper investigates the effect of driving a group of 52 open-ended Prestressed High Strength Concrete (PHC) piles on an existing highway embankment based on field measurements of excess pore pres

    Jan 1, 2016

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Theoretical And Experimental Investigation On Underwater Ground Anchors

    By Leonello Sciacca

    Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas

    Jan 1, 2011

  • DFI
    Bored Piles With Base Preloading By Grouting - The Polish Experience

    By Bolestaw A. Ktosihski

    Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr

    Jan 1, 2006

  • DFI
    Simulation of Brittle Failure of Cement Treated Soil Using Smoothed Particle Hydrodynamics

    By Tomohide Takeyama, Yuki Yoshida, Masaki Kitazume

    "Abstract A series of centrifuge model tests was conducted to investigate the failure pattern and stability of cement treated clay ground having an unsupported vertical slope. The model ground was sub

    Jan 1, 2014

  • DFI
    Damage To Initially Bent Piles ? Synopsis

    By B. B. Broms

    A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of

    Jan 1, 2010

  • DFI
    Reverse Circulation Drilling (Rcd) Technology For Largediameter Piles

    By Nikolas Schmitz

    For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling

    Nov 1, 2022

  • DFI
    The Design Of Deepwater Wharves Which Are In The Complex Geological Conditions Of Pearl River Estuary

    By F. W. Liang

    The geology of pearl River estuary belongs in strong weathered rock quaternary geological systen, so the conditions are complication. Since 80's we built the first deepwater wharf of Shenzhen chi

    Jan 1, 1991

  • DFI
    Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical Soil

    By Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa

    "Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating

    Jan 1, 2014

  • DFI
    Toward Understanding the Seismic Performance of Rigid Inclusions

    By J. Tanner Blackburn, James R. Gingery, Lisheng Shao

    Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.

    Jan 1, 2018

  • DFI
    Minipiles And Jet-Grouting: A Strong Foundation In Parma, Italy

    By Bruno Gemmi

    The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid

    Jan 1, 2011

  • DFI
    Jetting-Assisted Sheet Pile Driving

    By Marie-Pierre Bourdouxhe-Barnich

    Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d

    Jan 1, 2002

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    Estimation of Shaft and Base Responses from Pile Load Test

    By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran

    "Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc

    Jan 1, 2017

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002