    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • DFI
    Quality Control For Installation Of Augered Cast-In-Place Piles

    By Francis J. Arland

    The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh

    Jan 1, 1997

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • DFI
    Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test Results

    By John C. Niedzielski

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)

  • DFI
    Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam

    By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett

    "A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu

    Jan 1, 2017

  • DFI
    Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY

    By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht

    The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou

    Jan 1, 2018

  • DFI
    Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their Analyses

    By Eiji Kojima

    In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn

    Jan 1, 2006

  • DFI
    Recent Developments In The Law Of Deep Foundations

    By Brian P. Waagner

    Construction law in general and the law of deep foundations in particular continues to develop rapidly, particularly in the areas of risk allocation. Public and private owners are increasingly using c

    Jan 1, 2002

  • DFI
    Design Of Deep Foundations Over Shallow Mine Workings

    By Tianfei Liao

    Extensive site investigations revealed that abandoned shallow mine workings exist under a site planned for construction of a major new facility. Since the mine voids were susceptible to collapse, they

    Jan 1, 2009

  • DFI
    Pittsburgh Steelers Stadium - Deep Foundations Case Study

    By Larry Rayburn

    In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified

    Jan 1, 2001

  • DFI
    A Pile-Supported Mat Foundation For A 27-Story Building In Milwaukee, Wisconsin (USA)

    By Alan B. Wagner

    The River Tower is a proposed 27-story condominium building in the heart of downtown Milwaukee, Wisconsin (USA). The tower will be over 100 m tall, and will have a ground area measuring 15 m by 40 m.

    Jan 1, 2002

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • DFI
    Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota Valley

    By Roger A. Archabal, Omar A. Conte, Gustavo Langoni

    This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr

    Jan 1, 2018

  • DFI
    Piling Design and Construction Codes and Standards for Buildings A United States Perspective

    By Rudolph P. Frizzi

    "Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu

    Jan 1, 2014

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • DFI
    Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway Station

    By Antonio Marinucci, Robin Mao

    The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • DFI
    Pore Water Pressure Response and Effect on Installation Torque of Large Diameter Helical Piles in Soft Soils

    By Howard A. Perko, M. Mae Benvenga, Heather H. Trantham

    Displacement of soil and groundwater during helical pile installation can produce excess pore water pressures (PWP) in fine-grained soils. Pore water pressure reduces effective stress in the soil imme

    Jan 1, 2018