Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stability of Rock Slopes at Mines

    By D. F. Coates

    Slope problems arise on mining properties from cuts for roads and railroads and from open pits. When it is 'realized that 1,000,000 extra tons of waste may have to be mined as a result of an average s

    Jan 1, 1961

  • CIM
    A Historical Survey of the Methods Used to Reduce the Size of Ore at the Holliger Mine

    By I. M. Gordon, J. Blackshaw

    "Run-of-mine ore is reduced to 4 per cent on 4 mesh (3/ 16 inch), using four stages of dry crushing. The mill feed is then reduced to 2 per cent on 48 mesh and 60 per cent through 200 mesh, using one

    Jan 1, 1965

  • CIM
    The Polar Continental Shelf Project

    By W E. vanSteenburgh

    The Polar Continental Shelf Project was initiated in 1959 to provide an administrative and logistic vehicle for research in the physical sciences of the land, sea and channel area of the Arctic Archip

    Jan 1, 1963

  • CIM
    TSP-Based Model for on-Site Material Handling Operations with Tower Cranes

    By Amir Zavichi

    Today, with the necessity of timely, on-budget and high quality completion of projects, proper use of construction equipment is essential to ensure project success. Construction equipment places a lar

    Aug 1, 2013

  • CIM
    Use of Concrete 1n Mining at the Jeffrey Mine

    By D. P. R. Smyth

    The limestone reef reservoir at Swan Hills consists essentially of a "buildup" of successively smaller atoll-like layers. Precipitation of calcium carbonate within the lagoonal area of each layer esse

    Jan 1, 1961

  • CIM
    Environmental management in a global economy (CIM Bulletin)

    By S. Vézina

    "Environmental issues have evolved considerably over the last two decades. The main contributing factors, to name a few, have been the changing values of modern societies, the globalization of trade a

    Jan 1, 2006

  • CIM
    Grade Control Practices at Steep Rock Iron Mines Limited

    By R. H. Duthie

    As at any other mine in Canada, grade control procedures are used at Steep Rock Iron Mines (1) in order to ensure that concentrator and pellet-plant operator s have a uniform feed so that they can man

    Jan 1, 1977

  • CIM
    Raising a Blind Shaft Between Two Submarine Coal Seams (297edc53-3f33-4275-8620-82ccd0512a9f)

    By Jos. Kalbhenn

    MR. G. G. BOWSER: Mr. Kalbhenn's paper is an excellent one and is a concise description of a very interesting piece of work. It is well known that a great deal of preliminary study was given to

    Jan 1, 1944

  • CIM
    Structural Geology of Canadian Ore Deposits: The Cordilleran Region

    By H. C. Gunning

    Introduction The invitation to contribute a discussion on some of the broader features of the mineral deposits of our Cordillera seemed acceptable enough when presented several months ago. More mat

    Jan 1, 1950

  • CIM
    Geological, Geochemical and Mineralogical Characteristics of the Asturias Fluorspar District, Northern Spain

    By Jesus Garcia Iglesias, Jorge Loredo

    "Abstract -The Asturian fluorspar district consists of vein and stratiform deposits where mineralization is controlled by a combination of lithological and tectonic factors.It is postulated that these

    Jan 1, 1994

  • CIM
    The Woodstock, N.B., Iron.-Manganese Deposits

    By K. O. J. Sidwell

    STRATMAT LIMITED, through its subsidiary, the Strategic Manganese Corporation, controls two adjoining iron-manganese properties five miles west of Woodstock, New Brunswick. One is a staked property of

    Jan 1, 1957

  • CIM
    Grain Refining Aluminium Alloys by the Same-Alloy Rod

    By D. G. Eskin

    "It is well known that it takes some time for the solid phase to completely dissolve upon melting, especially inside the defects of insoluble particles, e.g. oxides. Until then the oxides remain activ

    Jan 1, 2018

  • CIM
    Total Plant Control by a Process Computer at Quebec Cartier?s Mount Wright Property

    By G. Bourque

    One of the design criteria for the Mount Wright facilities was to incorporate the latest proven automation techniques and devices for the new crushing, grinding and concentrating plant. The heart of

    Jan 1, 1977

  • CIM
    Chromium-Free Binding System for Basic Refractories

    By R. Lodha, C. Oprea, G. Oprea, H. Zargar, T. Troczynski

    "The basic refractories used in non-ferrous industry contain chrome ore for improving the thermal shock resistance, thus reducing the penetration of molten metal and fayalite-type slags into the linin

    Jan 1, 2012

  • CIM
    The Effect of Modified Dextrins on the Depression of Talc and Their Selectivity in Sulphide Mineral Flotation

    By D. A. Beattie

    Three novel dextrin polymers of varying functional group chemistry but similar molecular weight have been used to depress talc in single and mixed mineral studies. The mixed mineral system was a model

    Jan 1, 2006

  • CIM
    Geology of the Sustut Copper Deposit in B.C. (2d42b1e7-1c94-47a9-b4c1-62e26e60d034)

    By G. Harper

    "AbstractThe Suetut. Copper deposit, 230 miles northwest of Prince George, B.C., was discovered in August of 1971. Subsequent exploration has included 56,417 feet of surface diamond drilling in 139 ho

    Jan 1, 1977

  • CIM
    Cu – Ni Concentration Gradient Alloy for Antimicrobial Efficacy Testing

    By H. A. Khorami, T. Wong, B. Velapatino, E. Asselin, T. Donnelly, E. Bryce, R. Dixon

    A copper–nickel concentration gradient alloy was designed and fabricated through a powder metallurgy (PM) process. Copper and nickel powders were mixed with different weight ratios from 0 to 100% copp

    Jan 1, 2019

  • CIM
    Developing a Consistent Approach to Mine Reclamation - Cape Breton Development Corp. (CBDC) Mine Site Closure Program

    By Belinda Campbell

    Tools for Consistency 1. GIS Web Site 2. National Project Management System 3. Site Grouping Approach (721 PIDs) 4. Mine Reclamation Standing Offer Agreements ?Contracting tool 5. Remedial Object

    May 1, 2011

  • CIM
    A Two-Stage Electric Arc-Electroslag Process for Continuous Steelmaking

    By R. H. Nafziger

    A novel process has been developed for preparing directly workable steel ingots from prereduced iron ore pellets by a two-stage process. The pellets are continuously charged into an electric arc furna

    Jan 1, 1977

  • CIM
    Recommentlotions on Mining Taxation Submitted to the Ontorio Committee on Taxation

    By W C. Shakespeare

    The Ontario Committee on Taxation is making a comprehensive study of taxation in the Province of Ontario, and in this connection has received representations concerning mining taxation from a number o

    Jan 1, 1965