Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Environmental Regulation and Compliance - A Summary

    By S. W. Stogran

    "A brief summary of the environmental testing and analyses required to ensure and maintain compliance of mining properties will be discussed. Programs for new and existing properties and for propertie

    Jan 1, 1992

  • CIM
    Vanadium-bearing magnetite and ilmenite mineralization and beneficiation from the Sinarsuk V- Ti project, West Greenland

    By T. Grammatikopoulos, A. McKen, O. Christiansen

    Vanadium mineralization occurs in oxide-rich horizons within layered metagabbro zones of the Sinarsuk deposit, West Greenland. The main oxide minerals are vanadiferous magnetite and ilmenite, comprisi

    Jan 1, 2002

  • CIM
    Stabilité Géotechnique Des Ouvrages De Retenue Pour Les Résidus Miniers: Problèmes Persistants Et Méthodes De Contrôle

    By Michel Aubertin

    Les digues de retenue de résidus miniers devraient être conçues de façon à supporter les charges les plus défavorables qui puissent être anticipées. Les nombreux incidents survenus au cours des derniè

    Nov 1, 2002

  • CIM
    Caractérisation des environnements miniers menant à la corrosion des systèmes de soutènement

    By Jean-François Dorion

    La corrosivité des environnements miniers souterrains est un phénomène peu étudié au Canada. En plus de détériorer les systèmes de soutènement, la corrosion s?attaque aussi à divers installations et é

    Feb 1, 2008

  • CIM
    Design & Development of the Barmac Rotopactor

    By Bryan A. Bartley

    "Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla

    Jan 1, 1985

  • CIM
    The Sizing and Operation of Crushing and Screening Plants

    By R. E. Jones

    "Crusher sizing and application in mining operations is the selection of a crusher or a series of crushers to reduce run of mine ore to a size suitable for either autogenous or conventional grinding.

    Jan 1, 1974

  • CIM
    Red Dog Lead Regrind Circuit Optimization

    By Brigitte Lacouture, Yeen Shien Hwang, David Lin

    "A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote

    Jan 1, 2005

  • CIM
    Separation of Metals in Aqueous Solutions by Ion Exchange

    By A. Himsley

    "There is an ever-increasing demand these days for efficient methods of removing metals from solutions especially for selectively recovering a particular metal from a mixture of metals in solution.Up

    Jan 1, 1975

  • CIM
    pH Control of Mattagami Lake and Orchan Mines Effluents

    By K. G. Stowe

    "1. Introduction Mattagami Lake Mines and Orchan Mines operate zinc copper mines adjacent to one another near Matagami, Quebec, situated approximately 300 kilometres north-east of Rouyn-Noranda. (Note

    Jan 1, 1979

  • CIM
    Evaluation of Grinding Media Shape, Mill Speed, Feed Density and Temperature in a Pilot Plant Ball Mill

    By Paul Staples, Fred Woodcock, Robert Grant, Mike Cooper

    "Noranda's Brunswick Mining Division, near Bathurst, New Brunswick, processes 10,500 TPD of complex Cu-Pb-Zn bearing ore. Brunswick uses conventional rod and ball milling techniques to achieve a flota

    Jan 1, 1997

  • CIM
    Characteristics of Modern Copper Flotation Circuits

    As part of the Australian Mineral Industries Research Association (AMIRA) P9 project, methods of characterising both the ore and the machines in flotation circuits have matured considerably over the p

    Jan 1, 2007

  • CIM
    Effects of Operating Parameters on Grinding Steel Consumption

    "INTRODUCTIONThe Kidd Creek Concentrator is located 28 kilometers east of the city of Timmins, Ontario. Two types of ore are treated; 'A' type, a copper-zinc-low silver ore producing copper and zinc c

    Jan 1, 1988

  • CIM
    Centrifugal Concentration and Separation of Precious Ores

    By B. V. Knelson

    "GENTLEMEN:This paper will deal with centrifugal separation - theory and practical, and since the Knelson Concentrator is the only centrifugal concentrator with a properly fluidized bed, this paper wi

    Jan 1, 1985

  • CIM
    Weak Rock Mass Span Design ? Best Practices

    By A. Ouchi

    This paper presents ground control best practices in weak rock environments including the "Unsupported" Weak Rock Updated Span Design Curve and awareness pertaining to the potentially detrimental effe

    May 1, 2009

  • CIM
    Progress in Understanding of Pipeline SCC: Initiation and Propagation

    By W. Zheng

    Pipelines can develop stress corrosion cracks in either intergranular or transgranular form. Since the mid-1980s, numerous colonies of transgranular cracks have been found across Canada and many other

    Jan 1, 2005

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    25 Years of Base Metal Processing

    By H. P. Jacobi

    "The last 25 years have seen tremendous economic pressure placed upon the base metal processor. Industry has responded with technological innovations that have contributed to significant reductions in

    Jan 1, 1987