Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.

    By Stevenson C. H, Lynch A. J

    The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t

    Jan 1, 1974

  • AUSIMM
    Moving beyond Net Present Value project evaluation to achieve Environmental, Social and Governance goals for mine operations and closure

    By H Simpson, C Gimber

    The financial evaluation of mining projects drives a whole range of decision-making regarding project viability, project design, operating models and closure philosophy. Net Present Value is a financi

    Aug 2, 2023

  • AUSIMM
    Silica Control During Zinc Calcine Leacing at Cominco's Trail Operations

    By Jankola W. A, Delong O. J

    Historically, the silica content of zinc concentrates treated at Cominco's Trail Operations has been low. Silica in the roaster calcine seldom exceeded 1.5 per cent because of the low silica co

    Jan 1, 1993

  • AUSIMM
    Responsible Management and Transparent Reporting across the Project Life Cycle

    By M A. Noppé

    "Mining is an inherently risky business: from the technical, environmental, social and economic uncertainties associated with advancing an exploration concept to a viable project; to the risks associa

    Jun 28, 2016

  • AUSIMM
    Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill

    By Andersson PO

    Boliden Mineral AB Boliden Mineral AB operates nine mines in Northern and Central Sweden, producing zinc, lead and silver concentrates and copper and gold. Seven of these mines use cut and fill (C&F

    Jan 1, 1998

  • AUSIMM
    The Geology and Grade Control at Bannockburn Gold Mine, Leonora District, Western Australia

    By Jankowski P

    The Bannockburn gold deposit is located 67 km north-west of Leonora in a poorly exposed part of the Norseman-Wiluna belt of Western Australia. The deposit consists of narrow, complexly shaped orebodie

    Jan 1, 1993

  • AUSIMM
    Beneficiation of a Turkish Bastnaesite Ore with Associated Fluospar and Barite

    By Ghiani M, Currelli L, Fuganti A

    the results of an experimental study aimed at beneficiating a complex ore containing bastnaesite and other rare-earth minerals, with associated barite and fluospar are illustrated. Owing to its mine

    Jan 1, 1993

  • AUSIMM
    Penetration behaviour of an initial sinter melt into substrates of different ore types

    By S Hapugoda, H Han, L Lu

    Sinter quality depends heavily on the mineral phases, textures and physical structure of the sinter, which are formed upon solidification of the sinter melt. The interaction of sinter initial melt wit

    Nov 8, 2021

  • AUSIMM
    Permanent Creek Diversion Through Spoil ù Back Creek, Queensland

    By P Bethune

    Back Creek is a tributary of the Condamine River. It flows in a northerly direction across the existing Commodore coal reserves. The diversion of Back Creek was proposed to minimise sterilisation of t

    Jan 1, 2003

  • AUSIMM
    The Response of Powered Supports and Pillars to Initial Longwalling Under a Strong Main Roof

    By Pala J

    The Ellalong Colliery has been the first to mine the Greta Seam using the longwall method. Analysis of data from geotechnical monitoring has pointed to the role of the strong, massive sandstones o

    Jan 1, 1986

  • AUSIMM
    Regional Stream Sediment Geochemistry Database (REGCHEM) for Selected Regions of New Zealand (c892f7b6-5ca8-457b-966a-25ae463b073f)

    By Christie AB

    Stream sediment geochemical analyses from 140 mining company exploration surveys of the Coromandel, Northwest Nelson, Marlborough and Westland regions of New Zealand have been compiled from open file

    Jan 1, 1995

  • AUSIMM
    Breccia Formation and It's Relation to Gold Mineralization at Mount Kasi, Fiji

    The Mount Kasi gold deposit in Vanua Levu represents an epithermal, high sulphur, gold-enargite system occurring within a volcanic caldera of Middle to Upper Miocene age. High level breccia pipes

    Jan 1, 1987

  • AUSIMM
    Arsenic in complex orebodies

    By M Tayebi-Khorami

    There is an increasing trend in the extraction and development of copper resources from complex deposits. The complex deposits pose mineral processing challenges, as they often contain low grade coppe

    Nov 21, 2018

  • AUSIMM
    Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-extraction in the South Deep Section, Western Areas Gold Mine

    By S Z. Petho

    The South Deep surface shaft system is being sunk to a final depth of 2750 m below surface and on completion will be the deepest single drop shaft in the world. The shafts will intersect the target re

    Jan 1, 1998

  • AUSIMM
    Safety Precautions for the Protection of Miners Against Underground Fires

    The hazard posed by underground mine fires is illustrated in the first part of this paper by means of a review of experiences in four mining countries over the last three decades. This brief revie

    Jan 1, 1988

  • AUSIMM
    A study of heat and material balances in direct reduction plant with various conditions

    By H Kim, M J. Sun

    Global steel companies are actively combating climate change by reducing carbon emissions. Traditional steel production, using the blast furnace (BF) – basic oxygen furnace (BOF) process, heavily depe

    Aug 21, 2024

  • AUSIMM
    Health and Safety ù A Key to Tomorrow

    Two characteristics of the modern mining industry are that there is a skill shortage and that young professional people rise rapidly into highly responsible supervisory positions. With this responsibi

    Jan 1, 2005

  • AUSIMM
    Developments in Underground Coal Mining Technology and their Implications

    Developments in mining technology are outlined which point out that longwall face technology has the capacity to produce 20,000t/d on a regular basis. The optimum length of longwall faces is about

    Jan 1, 1988

  • AUSIMM
    Mechanised Shields for Trenchless Sewer Construction in Singapore

    By Musa MA

    Tunnel excavation for sewer construction long remained a labour intensive, hazardous and costly operation. Even with the of mechanical and semi-mechanical shields for tunnel excavation, many problems

    Jan 1, 1993

  • AUSIMM
    Mapping and Three-Dimensional Modelling of Structural Controls in the Chirano Gold Deposits, Ghana û Keys to Better Near-Mine Exploration Targeting

    By P Hodkiewicz, K Noormohamed

    Gold deposits in the Chirano district in south-west Ghana are hosted in a variety of structural settings along the Chirano shear zone (CSZ), in Paleoproterozoic rocks of the Sefwi-Bibiani belt. Most g

    Jan 1, 2009