Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Porphyry Gold Mine, W.A. From Prediction to Production

    The Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based

    Jan 1, 1986

  • AUSIMM
    TodayÆs Mine Manager ù Technical Expert or Business Guru?

    The mine manager is one of the oldest jobs in the world. Over many centuries the fundamentals of how this job was approached did not change much. However since the later part of the 1980s there has be

    Jan 1, 2006

  • AUSIMM
    Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited

    In line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting

    Jan 1, 1987

  • AUSIMM
    The Structural Geology of the Herberton Tin Field

    This paper is based on studies made intermittently from 1937 to 1950. Its object is to describe the surface geology and the tin lodes, and to relate the lodes to the structure of the field.PREVIOUS RE

    Jan 1, 1951

  • AUSIMM
    New Ways to Explore Through the Regolith in Western New South Wales

    By A McRae

    Much of western New South Wales is characterised by an extensive regolith formed during more than 60 million years of exposure, weathering and erosion. This cover includes intensely weathered in situ

    Jan 1, 2004

  • AUSIMM
    The Education of the Extractive Metallurgist-A Personal View

    In the last several years we have seen the demise of the Department of Mining and Metallurgy at the University of Melbourne, the removal of extraction metallurgy from the Department of Metallurgy

    Jan 1, 1987

  • AUSIMM
    Assessment of ground support requirements in coal burst-prone mines

    By J Watson, C Zhang, I Canbulat, C Wei

    Coal burst is defined as a dynamic release of energy within the rock or coal mass in underground coalmines that causes violent rock or coal ejection in the vicinity of mine excavations. It poses one o

    Nov 29, 2022

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997

    By A G. Greenwood

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include t

    Jan 1, 1998

  • AUSIMM
    The Manufacture of Seamless Steel Tubing in Australia

    The scope of this paper has been restricted to the manufacture in Australia of seamless steel tubing, as the subject of buttweld tubing has already been dealt with by A. N. Hamilton in a paper deliver

    Jan 1, 1947

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    Prediction of Required Ventilation Levels for Longwall Mining in Australian Gassy Coal Mines

    By Battino S

    ABSTRACT' The high gas emissions associated with coal extraction at some-Australian collieries have provided a need to investigate the methods used to predict these gas levels and the vent- il

    Jan 1, 1983

  • AUSIMM
    Product Quality Control at Blackwater Coal Mine

    Utah Development Company operates a mine at Blackwater with a present annual production of 4 000 000 tonnes of coking coal. Mineable seams outcropping on the company's lease are part of the Pe

    Jan 1, 1974

  • AUSIMM
    Sustainable Mineral Resource Management Systems - Delivering Resource Growth Within Sarbanes-Oxley Requirements at Gold Fields Ghana, Abosso Goldfields Ltd, Damang Mine (AGL)

    By M Brewster

    Goldfields Abosso Goldfields Limited (AGL) is a Ghanaian registered company that owns and operates the Damang Gold Mine. Gold Fields Ghana Holdings Limited holds a 71.1 per cent interest in AGL. The D

    Jan 1, 2007

  • AUSIMM
    A Laboratory Study of the Effect of Burden and Spacing Parameters on Rock Fragmentation in Blasting

    By Vutukuri VS, Budavari S

    During recent years many investigators have suggested large spacing to burden ratios to improve the fragmentation obtained in blasting. In spite of these suggestions, most operators still use a conv

    Jan 1, 1975

  • AUSIMM
    Hydrothermal Rare Earth Element Mobilisation Processes in the Yinachang Fe-Cu-(REE) Deposit, South-west China

    By X Li, M-F Zhou

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Yinachang deposit in south-west China contains large amounts of Fe, Cu and rare earth e

    Mar 18, 2015

  • AUSIMM
    The Role of Advanced DEM Based Modelling Tools in Increasing Comminution Energy Efficiency

    By R Morrison, P Owen

    Particle breakage is an essential part of mineral processing. The aim is to reduce run of mine mineral ore to an optimal size for liberating target minerals and for subsequent recovery by separation p

    Jan 1, 2004

  • AUSIMM
    Pulp Chemistry, Surface Chemistry, and Flotation

    The bulk and surface chemistry of metal ion hydrolysis and precipitation and the redox chemistry of metal ions, sulphur, and other species is central to an under- standing of flotation. The paper c

    Jan 1, 1984

  • AUSIMM
    An Integrated Procedural Approach that Increases Value to Underground Mine Planning

    The value derived by good mine planning is often underestimated as many mines steer their attention to the more immediate and more easily recognised successes made by the day-to-day operational æbush

    Jan 1, 2009

  • AUSIMM
    The Gympie and Other Permian Strata of the Gympie Composite Terrane

    The Permian rocks at Gympie were first studied as far back as 1868 in conjunction with the discovery of gold. The relationship of the Gympie Group to other sequences in the Gympie Composite Terrane is

    Jan 1, 1990

  • AUSIMM
    Mineral Liberation in Continuous Milling Circuits

    By Schneider CL

    The calculation of the liberation spectrum in the product from continuous milling operations is a problem of considerable importance, and it is difficult to solve because the population balance equa

    Jan 1, 1993