Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Average Relative Error in Geochemical Determinations - Clarification, Calculation and a Plea for Consistency

    By C R. Stanley, D Lawie

    The measurement of error in assays collected as part of a mineral exploration program or mining operation, including errors introduced during sampling, sample preparation, or geochemical analysis, his

    Aug 21, 2012

  • AUSIMM
    Anglo Coal Australia ù Graduates and the Future

    Anglo Coal Australia (ACA) takes a proactive position with regards to attracting and retaining employees at a graduate level. Currently, ACA has graduates in its program across all disciplines: Mining

    Jan 1, 2005

  • AUSIMM
    Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines

    By P Moarefvand, M Osanloo

    The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela

    Sep 26, 2011

  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Adsorption and Desorption Technique in Predicting Outburst of Gas and Coal (Coal Mines Symposium September. 1980)

    The paper describes the studies conducted to date on the short term adsorption/desorption of gases in coal from the point of view of developing techniques to predict imminent outbursting condition

    Jan 1, 1980

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking System

    By A T. Spathis, K E. Leslie, K R. Blay

    Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore

    Aug 24, 2015

  • AUSIMM
    The Perseverance Gold Copper Deposit – A New Peak Mines Challenge

    By B Taylor

    The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent

    Aug 22, 2011

  • AUSIMM
    Automated omission-free geotechnical deformation monitoring – a new method deployable by non-specialists

    By J Franke, C Gonzalez

    One of the regular tasks of geotechnical and mining engineers is the measurement and management of deformation in underground excavations. Although several methods are used to do so, the incumbent met

    Nov 29, 2022

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Analysing reduced conveying capability of the orepass systems in Malmberget mine

    By T Wettainen, G Shekhar, M Stromsten, B Skawina

    The aim of a transportation system in an underground mine is to move the rock masses from one location to another in the most preferable manner by minimising the long and short-term operational costs.

    Mar 15, 2021

  • AUSIMM
    Metallurgical Efficiency in the Recovery of Alluvial Gold

    The character of alluvial gold deposits presents severe difficulties, and sometimes limitations, on the extent to which metallurgical efficiency can be measured. Very little monitoring of metallurgica

    Jan 1, 1984

  • AUSIMM
    Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill

    By V Lawson

    Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the

    Aug 8, 2011

  • AUSIMM
    Real-Time Image Analysis of Iron Ore Cores and Drill Chips to Complement Spectral Measures

    By T Belligoi

    Diamond cores and drill chips provide the only direct physical evidence for ore containing rocks. Early characterisation of cores and drill chips is important as it provides critical information for d

    Jul 11, 2011

  • AUSIMM
    Categorical and multiple indicator kriging – are we ignoring the geology?

    By P C. J Blackney, I M. Glacken

    Spotted Quoll is a massive sulfide nickel deposit located in the Forrestania greenstone belt in the Archaean Yilgarn block in Western Australia. Discovered in October 2007, mining has progressed from

    Mar 22, 2022

  • AUSIMM
    Can robots break the drill and blast bottleneck in underground roadway development in hard rock?

    By M Berner, N A. Sifferlinger, E Fimbinger

    Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p

    Sep 1, 2024

  • AUSIMM
    Wiring for Start-Up Success

    PIP is regularly engaged in businesses where Greenfield Capital Projects are under- delivering on the expected business case. In most of these projects, we can identify that rigorous review has been c

    Jan 1, 2006

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Shifting Waters in the Pilbara’s Iron Ore Industry

    By I Brandes de Roos

    Water has played a key role in the Pilbara’s 60-year history of iron ore operations. In contrast to many of the current-day mining environments, iron ore mining was initially hosted by geological form

    Jul 13, 2015

  • AUSIMM
    Project Evaluation and Valuation – An Investor’s Golden Rule

    By L I. Rozman

    "There have always been development projects that fall short of expectations. In the last decade, we have seen more than the usual number of mining and oil/gas development projects taking significantl

    Mar 8, 2016