Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation

    By B Reid

    "Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This

    Nov 15, 2016

  • AUSIMM
    Mineral Processing Education in China

    Mineral Processing Education in China

    Sep 13, 2010

  • AUSIMM
    Collaboration and change management, keys to successful automation implementation

    By D Kilkenny, D Nardini, P Kline

    This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate

    Mar 15, 2021

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    Olympic Dam Operations Review

    The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y

    Jan 1, 1998

  • AUSIMM
    The HydroFloat Separator ù A New Technology for Recovering Coarse Phosphate Sands

    By T C. Westerfield, G, M J. Mankosa

    An innovative separator known as the HydroFloat cell has been developed specifically for the upgrading of coarse particles that are difficult to recover using conventional flotation cells. The novel c

    Jan 1, 2005

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Considerations for the design and support of underground portals

    By M P. Sandy, R M. Stephenson

    Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu

    Mar 15, 2021

  • AUSIMM
    Criteria for the Design of Emergency Refuge Stations for an Underground Metal Mine

    By G P. Bates

    The rationale for the design of the Emergency Egress (escape andentrapment) strategy for one underground metal mine has beenpreviously described (Brake, 1999). Two of the key conclusionsfor this mine,

    Jan 1, 1999

  • AUSIMM
    Innovation in mining – a contractor’s role

    By D Kilkenny

    Underground contractors in the mining industry must be prepared to take a position at the forefront of innovation of equipment and work methods in order to maintain a competitive advantage over in-hou

    Oct 16, 2017

  • AUSIMM
    Your Career ù Are You an Overnight Dot.Com or a Long-Term Growth Option?

    The current boom being experienced by mining, coupled with a shortage of professionals, will mean those in the industry will have many choices. It may be easy to become carried away and run with the h

    Jan 1, 2004

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming Conditions

    By Y Li, Z Fu, D J. Williams, E Topal

    Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface

    Jul 27, 2015

  • AUSIMM
    Sampling and blending in geoenvironmental campaigns – current practice and future opportunities

    By A Parbhakar-Fox, S C. Dominy

    The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact

    May 9, 2017

  • AUSIMM
    Flotation of Hematite Using Oleates as Collectors

    Laboratory scale flotation tests were done on mineral hematite and aspecular hematite ore using oleic acid and sodium oleate as collectors. The mineral hematite floated strongly in the neutral pH regi

    Jan 1, 1999

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    Plant Design for Closure

    By D P. Murphy, R F. Dewhirst

    Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production

    Jan 1, 2006