Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rock stress measurements – a site geotechnical toolkit

    By P B. Hills

    Increasingly over the past couple of decades, the importance of understanding the in situ stress regime in underground hard rock mines has become accepted by all. Providers have responded to this requ

    Nov 29, 2022

  • AUSIMM
    Rock Stresses at Ok Tedi, Papua New Guinea

    By L Mollison, K W. Mills, N R. P Baczynski, M F. Lee, I A. de Bruyn

    This is the first of two papers concerned with rock stress inputs to various mine design issues at the large Ok Tedi open pit mine in Papua New Guinea. The companion paper (also published at this conf

    Nov 5, 2014

  • AUSIMM
    Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter Monitoring

    By H W. Wu, T Harvey

    An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th

    Jan 1, 2008

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • AUSIMM
    Comparing Energy Efficiency in Grinding Mills

    By E Niva

    The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits.   From

    Jan 1, 2008

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    Calibrating Comminution Models Using Operating Data to Forecast and Optimise Plant Performance

    By A L. Zawadski, B G. Putland

    "This paper discusses a method to build a calibrated comminution circuit model, using historic operating data and blend information that is useful for forecasting and optimising plant performance, as

    Oct 10, 2016

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Blasting Vibration Assessment and Innovative Blasting Methods in High-density Urban Environments

    By J W. Muir, N Bedford

    Hong Kong is one of the most rapidly developing cities in the world. With constant population growth and limited opportunities for space, the development of a fast and effective underground public tra

    Sep 17, 2014

  • AUSIMM
    Where is the Source of the World-famous Nanling W–Sn Polymetallic Mineralisation?

    By H Li

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The central Nanling region in South China experienced multistage granite intrusive events a

    Mar 18, 2015

  • AUSIMM
    Numerical Modelling of Monorail Support Requirements in Decline Development

    This paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins

    Dec 6, 2010

  • AUSIMM
    Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine Site

    By N Dube, K L. Sandvik, C Mutevhe

    Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn

    Jan 1, 2006

  • AUSIMM
    Understanding Trends in Performance of Open Cut Mining Equipment

    By G Lumley

    PlannersÆ optimism (or maybe commercial necessity) means that most mine plans use equipment rates that are rarely achieved (Lumley and Beckman, 2009). This lack of understanding of what equipment actu

    May 24, 2012

  • AUSIMM
    Eliminating Waste Streams on Synthetic Rutile Plants: Treatment of Electrostatic Precipitator Fume by Plant Acid Effluent

    By M M. Collisson

    The Synthetic Rutile (SR) plant operations, North Capel, produce electrostatic precipitator (ESP) fume and kiln scrubber residue. Typically ESP contains about 18 per cent Ti, 13 per cent Fe, 0.5 per c

    Jan 1, 2001

  • AUSIMM
    Developing Resilient Water Monitoring Programs in Changing Climate Conditions

    By A D. Price, W J. Germs, O Patterson, T R. Weaver

    "Understanding controls on groundwater and surface water flow and quality at mine sites throughout all mine stages is critical to effectively manage environmental impacts over the entire mine life. Mo

    Nov 26, 2013

  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Fine grinding circuit process improvement at the Karara mine concentrator

    By H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy

    The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag

    Sep 11, 2017

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    The Future for Ilmenite Beneficiation Technologies

    By R K. A Taylor

    The growth in production of beneficiated ilmenite products has been one of the most significant trends in the titanium feedstock industry over the past 30 years. In this period, the production of tita

    Jan 1, 2001