Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Automatic Dust Sampler

    A device is described which is suitable for the automatic sampling of dust in dust laden flue gases. This device, called a Venturi Sampler, consists of two pipes each fitted with a suitably designed v

    Jan 1, 1959

  • AUSIMM
    Using existing data to improve the delineation of ore at the Olympic Dam Fe-oxide Cu-U-Au-Ag deposit

    By K Ehrig, J Griffith

    An extensive suite of elements are routinely assayed on all resource drill core samples to assist in deposit scale resource definition, local mine scale delineation of ore zones, and ore characterisat

    Sep 20, 2017

  • AUSIMM
    Lithological Controls on Mineralisation in East Otago Gold Deposits

    East Otago gold deposits are hosted in Otago Schist that is the metamorphosed equivalent of Permian-Triassic Torlesse terrane greywackes. Relatively undeformed Torlesse sequences in Canterbury have &l

    Jan 1, 2001

  • AUSIMM
    Brown Coal Resource Evaluation - A Case Study of the Loy Yang Deposit

    By Hibbert W. D, Lottrey A

    The behaviour of coal in a process is a function of both the coal properties and the processing conditions. In the case of the Loy Yang coal deposit, extensive testing has been undertaken to determi

    Jan 1, 1992

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Measuring the Resistivity of Titanium Minerals in a Corona Field

    By P N. Holtham

    As part of a long-term study of titanium minerals processing being undertaken by the Julius Kruttschnitt Mineral Research Centre (JKMRC), techniques have been developed to measure the electrical prope

    Jan 1, 2001

  • AUSIMM
    Preparation of Low Ash Coal for Carbonization and Conversion Processes

    Properties of coal which are significant in relation to preparation for carbonization and conversion are reviewed, and existing coal preparation technology which has been used for production of cleane

    Jan 1, 1980

  • AUSIMM
    A Model for the Intrusive Sequence and Cu-Zn Skarn Formation at the Antamina Deposit, Peru

    By Z Chang, S A. Mrozek

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Antamina, Peru is the largest Cu-Zn skarn deposit in the world. Skarn mineralisation is foc

    Mar 18, 2015

  • AUSIMM
    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Sep 13, 2010

  • AUSIMM
    Mixing of Mineral Slurries

    Recent literature is reviewed with emphasis on the design and scale up of mixers. Most important aspects of mixing have resulted from the study of Newtonian fluids and only a minor attempt has been ma

    Jan 1, 1961

  • AUSIMM
    Optimised Process Control in Iron Ore via Online Analysis of Light Elements

    By L Köresaar, J Moilanen

    With lower and increasingly variable Fe grades in iron ore resources, the monitoring of Si, Al, Mg and other light elements to meet quality requirements is gaining importance in the iron ore beneficia

    Jul 13, 2015

  • AUSIMM
    Laboratory and Field Tests on Point Anchored Resin Bolts at the Ridgeway Deeps Block Cave

    The design of excavations in high displacement mining environments requires consideration of both the load and displacement capacity of the ground reinforcement and support systems. This paper is a ca

    Nov 25, 2010

  • AUSIMM
    Exploration at the Sams Creek Project, Northwest Nelson, New Zealand

    The Sams Creek gold deposit near Takaka in northwest Nelson was discovered in 1974 by CRA Exploration (CRAE) geologists. CRAE recognised the potential of the area and subsequently undertook a comprehe

    Jan 1, 2004

  • AUSIMM
    The Importance Properties of Hydraulic Fill, with Particular Reference to Mechanized Cut and Fill Mining Operations

    Essential features of the role of the fill material in mechanized cut and fill mining are discussed, with particular emphasis on its dewatering and strength development after emplacement. The fill mat

    Jan 1, 1966

  • AUSIMM
    The Future of Mining on Pitjantjatjara Lands

    In 1976 the Pitjantjatjara Council was established under the Associations Incorporation Act 1985 (SA), for the initial purpose of organising and bringing together three similar Indigenous groups. Thes

    Jan 1, 2002

  • AUSIMM
    Geology of the Area South of Mt. Isa and its Application to the Structural Control of the Mt. Isa Orebodies

    By Wilson G. L, Lord J. H

    A detailed analysis of faulting indicatcs that blocks of "greenstone" have been thrust beneath the southern end of the Mt. Isa orebodies.This "greenstone" basement is considered to

    Jan 1, 1963

  • AUSIMM
    Grout Injection Around Underground Workings - Reinforcement Potential and Problems

    The injection of grouting compounds into the consolidated rock surrounding underground mine workings has long been practiced for the purpose of sealing against water flows. In more recent times howeve

    Jan 1, 1994

  • AUSIMM
    Automated Loading and Hauling Experiences at De Beers Finsch Mine

    By R Grobler, D Burger, L Alberts

    The current climate in the mining industry is allowing mining companies to further broaden their views and investigate technologies to improve the safety, efficiency and cost-effectiveness of their op

    Jan 1, 2008

  • AUSIMM
    Computer Aided Mine Planning at Stockton

    Due to highly competitive international coal markets, Stockton mine is bound to produce very high quality coals consistently if it is to maintain and expand its market share. The nature of the deposi

    Jan 1, 1989

  • AUSIMM
    The Use of Automated Mineralogy to Interpret the Batch Flotation Performance of Merensky Reef Ore

    The Use of Automated Mineralogy to Interpret the Batch Flotation Performance of Merensky Reef Ore

    Sep 13, 2010