Search Documents

  • SME
    Project Payette Proposed Solution Mining Program For The Creation Of A 315 Foot Diameter Unsupported Sphere At, A Depth Of 2,700 Feet

    By Jr. Kermit Allen

    A study was conducted for the AEC to determine the feasibility of constructing an unsupported 315 foot diameter spherical cavity at a depth of 2,700 feet in a salt dome. A cavity of this size and shap

    Jan 1, 1968

  • NIOSH
    RI 3824 Determination of Metallic Iron & Oxygen- Sponge Iron

    By J. P. Morris

    "INTRODUCTION In the investigation being conducted by the Bureau of Mines concerning the production and utilization of sponge iron, it soon became evident that more information was needed regarding me

    Sep 1, 1945

  • NIOSH
    OFR-47-87 Control Of Diesel Exhaust Missions In Underground Mines

    By A. Stawsky

    Effective use of diesel vehicles in underground mining requires attention to improved control of diesel exhaust pollutants such as particulate (soot), oxides of nitrogen and sulfur and carbon monoxide

    Jan 1, 1987

  • NIOSH
    RI 4740 Petroleum Engineering Study Of The Weber Pool, Washington County, Okla.

    By Kenneth H. Johnston

    The Weber pool in Washington County, Okla. (fig. 1), covers an area extending from 2 miles east and slightly north of Bartlesville, Okla., to a point approximately 2-1P tiles northeast of Dewey, Okla.

    Jan 1, 1950

  • NIOSH
    IC 7181 Status Of Safety In Mining ? Introduction

    By D. Harrington

    The mining industry of the United States has-long been severely criticized because of its high rate of accident occurrence, net only as compared with other major industries-in the United States but al

    Jan 1, 1941

  • NIOSH
    IC 8666 Proceedings Of The Symposium On The Use Of Diesel-Powered Equipment In Underground Mining, Pittsburgh, Pa., January 30-31, 1973 ? Introduction

    A symposium was held on January 30 and 31, 1973, at Pittsburgh, Pa., to review the state-of-the-art in designing and utilizing diesel-powered equipment in underground mining. The Health and Safety Act

    Jan 1, 1975

  • CIM
    Chapter 12. Determination and Payment

    By Karl J. C. Harries

    "12.1. NO DEPRECIATION/GAAPAll calculations and computations relating to the Royalty shall be carried out in accordance with generally accepted accounting principles consistently applied to the extent

    Jan 1, 2003

  • CIM
    Lead Bead Method of Spectrographic Analysis of Platinum Metals, Gold, Silver, and Bismuth 1n Sulphide and Uranium Ores

    By J. E. Hawley, Y. Rimsaite, T. V. Lord

    "IntroductionIN THE COURSE of. a spectrographic investigation of the platinum metal .content of various minerals in sulphide ores, the use of • fire-assay beads dissolved in gold-amalgam ( 1) was foun

    Jan 1, 1953

  • AIME
    Austenite And Austenitic Steels

    By John Mathews

    IT is a great honor to be asked by. the Board of Directors of this Institute to deliver the Henry Marion Howe lecture. The invitation carries with it a great responsibility, which I accept with consid

    Jan 4, 1925

  • NIOSH
    Accidents From Hoisting And Haulage At Metal And Nonmetallic Mines - Metal- And Nonmetallic-Mine Accident-Prevention Course - Section 3 - Purpose And Scope

    The first metal-mine accident-prevention course was prepared and published in 1942-45 as a series of seven miners' circulars (Nos. 51-57). The scope of the course has been broadened, revised, and

    Jan 1, 1955

  • NIOSH
    OFR-13-76 Development Of A Fluorescent Cap Lamp System ? 1.0 Introduction

    Prier to the date of this contract, Ocean Energy had developed and demonstrated a high efficiency fluorescent caplamp which operated from a standard 4 volt miner's caplamp battery. This unit prod

    Jan 1, 1975

  • CIM
    Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)

    By Walter Herd

    For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i

    Jan 1, 1929

  • IIMP
    Recomendaciones Técnicas en el Uso de Software en Aplicaciones Geológicas

    By Jhon Melo

    Los “softwares de aplicación” como herramientas en la exploración geológica, generan importante información geográfica sobre el área a estudiar, así como la cartografía y la toma de muestras en labora

    May 25, 1998

  • AIME
    Ventilating-System at the Comstock Mines. Nevada

    By George J. Young

    DR . JOHN A . CHURCH, in his treatise on the Comstock Locle 1 gave a full and clear account of the conditions of the mine during the period of greatest activity. The difficulties in the way of deep mi

    Nov 1, 1909

  • AUSIMM
    Numerical Simulation of the Drainage in a Mining Stope Filled with Hydraulic Bakcfill

    By Servant S

    In the mine of this study, cemented hydraulic backfill is placed under the form of a slurry at a percentage of solid by weight varying from 50 to 65 per cent. This slurry settles and cures in the st

    Jan 1, 1998

  • NIOSH
    OFR-97-82 Cost And Sensitivities Analysis For Uranium In Situ Leach Mining

    By George W. Toth

    Uranium in situ leach mining has recently emerged as a viable alternative to conventional miring techniques. The cost implications of in situ mining are therefore of increasing interest to mining para

    Jan 1, 1981

  • SME
    Mini Symposium ? Rock Reinforcement - Design Of Rock Reinforcement Systems - Rationale For The Design Of Rock Reinforcement Systems

    By V. Rajaram

    Rock reinforcement systems are used in open pit and underground mines to stabilize the rock mass in-situ and provide safe working conditions. Significant progress has been made to date in the design a

    Jan 1, 1983

  • NIOSH
    Sulfur Compounds In Crude Oil

    By H. T. Rall

    This report summarizes a systematic 20-year study of the organic sulfur compounds in Wasson, Texas, crude oil and, to a lesser extent, of three other crude oils, that has culminated in some 200 indivi

    Jan 1, 1972

  • NIOSH
    OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

    By K. B. Bengtson

    This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI

    Jan 1, 1979

  • NIOSH
    OFR-22(1)-77 Inherently Safe Mining Systems (Conventional) - Phase III - Volume I - Technical

    By D. O. Hamiltion

    The ISMS program provided for the development and demonstration of equipment modifications in both conventional and continuous coal mining systems. This report describes activities during the demonstr

    Jan 1, 1976