Search Documents

  • SME-ICGCM
    Footwall Stability and Final Pit Design in the PT. Adaro Coal Mine, Indonesia

    By Takashi Sasaoka

    The PT. Adaro Coal Mine targeted in this research is located in South Kalimantan, Indonesia. The coal production of this mine is increasing year, with about 35 M tons of coal produced in 2006. Th

    Jan 1, 2008

  • AUSIMM
    Effective Mining Project Management Systems

    By C Adams

    Reports of delays and cost blowouts in major study and construction projects are becoming increasingly prevalent in the resources industry. This is mainly being attributed to an escalating cost enviro

    Jan 1, 2006

  • SME
    Government Service During World War II

    In spite of our deep conviction that it would be wrong for the United States to enter World War II, when, after Pearl Harbor, we were actually in it, I felt that I must do all I could to help. The cou

    Jan 1, 1976

  • SME
    APCOM 23 – Computer Simulation, Automation, Optimization and Debate For the Minerals Industry

    By Kerry Spickelmier

    Editor's note: information for this feature was taken from the published APCOM proceedings. Computer trends, with special focus on the reasons for computer use, grabbed the lion's share o

    Jan 1, 1992

  • DFI
    Evaluation For Stone-Column Composite Foundation In Rayleigh Wave Method

    By Zhang Baoshan

    In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed

    Jan 1, 1991

  • SME
    On-Line Diagnostic Maintenance Systems For Continuous Mining Machines (f04357ef-28a2-44a2-b5e5-3cf01cd8c0cc)

    By J. C. Cawley

    Improvements in today's maintenance practices are mandatory as more complex and productive machines evolve in the mining industry. By keeping machine reliability high, through improved maintenanc

    Jan 1, 1991

  • CIM
    Diamond Project Development ? An Holistic Approach

    By Jarek Jakubec

    The new euphoria in diamond exploration brings with it a need to understand the challenges that new projects can face in different stages of the development and risks that the commercial outcomes from

    May 1, 2006

  • NIOSH
    IC 9200 Integrated Compartment-Machine Design For Low-Coal Shuttle Cars

    By John R. Bartels

    This Bureau of Mines report describes the development of a preliminary design for a novel, protected, cab-shuttle car for use in working seam heights down to 40 in. Because of the severe restrictions

    Jan 1, 1988

  • CIM
    Spinodal Copper Alloy C72900 - A New High Strength Anti-Friction Alloy System

    By F. C. Grensing, W. R. Crib

    Copper-15 Nickel-8 Tin alloy is a relatively modern material, having been discovered in the 1970’s. It has complexities with casting, hot working and interdependent solid state phase transformations.

    Jan 1, 2010

  • NIOSH
    IC 6851 Mining Methods And Costs At The Eureka Standard Mine ? Introduction

    By E. D. Gardner

    The mine of the Eureka Standard Consolidated dining Co. is at Dividend, Utah, in the Tintic mining district. It is operated under the same management and controlled by the Antic Standard Mining Co.; t

    Jan 1, 1935

  • AUSIMM
    Significance of the Iron Oxide Outcrop at Mount Oxide, Queensland

    Significance of the body of iron oxide, which in part overlies as its hanging-wall the rich chalcocite ore-body at Mount Oxide, Queensland, has been variously interpreted by engineers and geologists w

    Jan 1, 1939

  • CIM
    Economical Manufacture of Quality Lime (caec3a53-9812-4761-a5b0-5c17ff14588a)

    By Victor Azbe

    Azbe System of Controlled Calcination To obtain good and cheap lime there are certain fundamental requirements that need to be satisfied. These are : (1) Proper combustion of fuel and steady suppl

    Jan 1, 1946

  • CIM
    Minage des zones étroites à la Mine Bousquet

    By Paul Gauthier

    Aujourd?hui, avec un faible prix de l?or sur le marché, les opérateurs miniers doivent revoir leur façon de faire. La méthode de minage «Eureka» permet de réduire les coûts de production et d?accélére

    Oct 1, 2001

  • AIME
    Some General Problems of the Mineral Industry

    By Thomas T. Read

    THE official title of our topic for today is "Resources of Metals and Other Strategic Minerals," but in accepting the invitation to open this discussion I claimed the privilege of being allowed to tal

    Jan 1, 1929

  • SME
    Open Pit Mine Production Scheduling with Stockpiling Using Constraint Programming

    By Biswajit Samanta, Rahul Kumar, Pranjal Pathak

    The Open Pit Mine Production Scheduling Problem (OPMPSP) is a complex optimization problem that seeks to determine the best sequence for extracting mineralized material from the ground in order to max

    Jun 25, 2023

  • SAIMM
    Monte Carlo Simulation Of Pt-Al Thin Film Diffusion - Synopsis

    By R. A. Harris

    In this study Pt-Al thin films were prepared via electron beam physical vapour deposition (EB-PVD) with an atomic concentration ratio of Pt25:Al75. These films were heat treated at temperatures rangin

    Jan 1, 2011

  • NIOSH
    RI 2977 Rock barriers for coal mines

    By G. S. Rice, H. P. Greenwald, H. C. Howarth

    """Rock-dust barriers""5 as they are termed in this country, are for the purpose of confining a coal-dust mine explosion to the limited area in which it originates. These barriers were first tested in

    Jan 1, 1930

  • AUSIMM
    Evaluation of Three-Dimensional Laser Scanning and Photogrammetry Systems for Terrestrial Surveying and Deformation Monitoring of Rock Faces and Highwalls in Mining Operations

    This study explores two evolving 3D surveying technologies, photogrammetry and laser scanning, and applies them to deformation monitoring of rock faces and mine highwalls. A quantitative analysis focu

    Jan 1, 2009

  • SME
    Cyprus Pima Mining Company's Computer Based Control System - Introduction

    By Jack E. Bailey

    From a start in 1957, milling 3,000 TPD of copper ore, the Cyprus Pima Mining Company, which is located 20 miles south of Tucson, has expanded its operations four times, and is currently treating over

    Jan 1, 1975

  • AUSIMM
    The Rapid Determination of Silicon in Low-Alloy Irons

    By Belcher C. B

    A procedure was required for the rapid determination of silicon in low-alloy irons and a suitable method used the formation and reduction of silicomolybdic acid at 50°C. The procedure gives resul

    Jan 1, 1965