Search Documents

  • NIOSH
    IC 7800 Mining, Processing, And Costs - Idaho Almaden Mercury Mine, Washington County, Idaho ? Summary

    By Margaret R. Lickes

    Mercury was produced originally at the Idaho Almaden mine from 1939 to 1942. When the ;.nine was shut down, more than 100,000 tons of ore, containing from 2.5 to 3 pounds of mercury per ton, was known

    Jan 1, 1957

  • SME-ICGCM
    Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth Surface

    By F. N. Voskoboyev

    The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min

    Jan 1, 1996

  • CIM
    Mining PMGS To BOOSTRAP Commercial Space

    By Christine Hansen

    ?Kiss my Asteroid? Unofficial Title Human life is tied to minerals It?s worth noting that: The living human body consumes minerals. The minerals we take in multivitamins show the close linka

    May 1, 2013

  • CIM
    Developments tn Dust Collection Equipment

    By J. H. McKibbon

    THE metallurgical industry has purchased more than sixty per cent of the industrial gas cleaning equipment installed in Canada. This includes cyclonic collectors, scrubbers, cloth filters and Cottrell

    Jan 1, 1962

  • AIME
    The 133rd Meeting of the Institute - An Unusually Broad Range Of Papers To Be Presented Many Social Features Provided

    By AIME AIME

    T HE 133rd meeting of the A. I. M. E., opening in New York on Feb. 15, promises to be as successful technically and socially as any in the past. The papers submitted for the various technical sessions

    Jan 1, 1926

  • AIME
    Airplanes Solve Alaskan Mining Problems

    By CLARENCE WM. POY

    THE most common difficulty faced by an engineer or mine operator when opening a new property in a new field is the lack of roads and of cheap transportation. This one item often swings the balance of

    Jan 1, 1935

  • CIM
    "To Mill or not to Mill ? That's the Question" LIF for Rock Identification and Quality Control of Raw Materials ahead of Processing

    By Heribert F. Broicher

    By the very nature of mineral deposits the quality of the raw material generally fluctuates and should be known for optimum processing. Early classification, for example, of limestone into road-metal

    May 1, 2002

  • DFI
    Drilled Piers With Base Preloading By Grouting - 1. Introduction

    By Boleslaw A. Klosinski

    Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile

    Jan 1, 1995

  • CIM
    Stamp-Milling and Amalgamation Practice at Goldenville, N.S.

    By E. H. Henderson

    Introduction Stamp-Milling and amalgamation is, perhaps, one of the oldest processes of recovering gold from its ores. Many papers, theses, and textbooks have been written on the subject of stamp-mil

    Jan 1, 1935

  • NIOSH
    IC 6604 Methods And Costs Of Concentrating Scheelite Ore At The Silver Dike Mill, Mineral County, Nev. - Introduction

    By William O. Vanderburg

    This paper describing the methods and costs of milling scheelite ore at the Silver Dike concentrator of the Nevada-Massachusetts Co., Inc., is one of a series being prepared by the Bureau of Mines.

    Jan 1, 1932

  • NIOSH
    RI 5001 Morefield Pegmatite Mine, Amelia County, Va. ? Introduction And Summary

    By R. W. Geehan

    The Bureau of Mines has been investigating deposits of critical and essential minerals in the United States since 1939. Bureau engineers made a preliminary examination of the Morefield mine early in 1

    Jan 1, 1953

  • AIME
    French Mineral Position

    By Charles Will Wright

    FRANCE will be given a large portion of the Marshall Plan funds for relief, reconstruction, and industrial development in France and in her colonial possessions. At present that country is not in posi

    Jan 1, 1948

  • SME
    Take Time For Pit Phase Design

    By A. Eccles

    Phase designs are the foundation upon which all open pit mine sequence optimizations and budgets should be built. Unfortunately, at times, mine engineers skip the step of developing realistic pit phas

    Feb 27, 2013

  • CIM
    Mill Installation and Power Development at Big Missouri Mine

    By G. H. McKay

    AT the Eagle mine, near Gilman, Colorado, where the Empire Zinc Company have installed an underground mill, transportation problems were comparatively simple. A railway siding on the Denver and Rio Gr

    Jan 1, 1938

  • AUSIMM
    Leaching of a Refractory Gold Ore Sample from the Central Zone, Clarence Stream Property, New Brunswick, Canada

    By J Pric, M Fulton, C Xia

    A cyanidation study was conducted on a mild refractory gold ore sample from the Central zone of Clarence Stream Property, owned by Freewest Resources Canada, to develop a leaching strategy to extract

    Jan 1, 2007

  • NIOSH
    Historical Documentation Of Major Coal-Mine Disasters In The United States Not Classified As Explosions Of Gas Or Dust: 1846-1962 ? Summary

    By Charles M. Keenan

    THIS PUELICATION lists and provides brief accounts of the major disasters not classified as explosions of gas or dust that have occurred in the cod mines of the United States from the earliest times t

    Jan 1, 1963

  • CIM
    Modern Mining Methods at Copper Mountain

    By R. S. Douglas

    Introduction During the past few years, a number of changes in the mine operations at Copper Mountain have taken place. The modernization and mechanization were necessitated and given impetus by wa

    Jan 1, 1947

  • AIME
    Mining and Metallurgy - 1948 - Mineral Dressing

    By J. F. Myers

    A bit of old philosophy: The optimist, the pessimist, The difference is droll; The optimist, the doughnut sees, The pessimist, the hole. This is a neat summation of the viewpoint of those engaged i

    Jan 1, 1948

  • NIOSH
    IC 7432 Permissible Mine Equipment Approved to January I, 1947, with Appended List of Available Flame-Lamp Fuels

    By A. B. Hooker

    A list of permissible mine equipment approved by the Bureau of Mines prior to January 1, 1940, was published as Information Circular 7207.3 Three supplements published as I. C. 7240,4 I. c. 7283,2/ an

    Dec 1, 1947

  • CIM
    The Sullivan Mine and Concentrator: A Review Of Three Years' Progress

    By M. M. O?Brien

    THE SULLIVAN MINE The Sullivan mine of the Consolidated Mining and ? Smelting Company of Canada, Limited, is situated at Kimberley, B.C., nineteen miles from Cranbrook, a divisional point on the Crows

    Jan 1, 1926