Search Documents

  • DFI
    A Case History On The Design, Construction, And Field Quality Control Of Cement Deep Soil Mixing

    By Suthan Pooranampillai

    This paper presents a case study of the use of single axis cement deep soil mixing (CDSM) to deal with static settlement and seismic stability of the foundation soils under a reinforced soil slope (RS

  • DFI
    A Case History on the Design, Construction, and Field Quality Control of Cement Deep Soil Mixing

    By Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin

    "This paper presents a case study of the use of single axis cement deep soil mixing (CDSM) to deal with static settlement and seismic stability of the foundation soils under a reinforced soil slope (R

    Jan 1, 2017

  • DFI
    A Case History Studying On Displacement Controlling In Deep Excavation

    By Feng Yongxuan

    Anchored sheep pile is normally used in deep excavations, many of which only require stability in accordance with Terzaghi theory. In this paper, based on the experience, new lateral earth pressure me

    Jan 1, 1991

  • DFI
    A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in Goa

    By Akshay Sakhuja, M. S. Karthika, R. Vignesh

    "The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup

    Jan 1, 2015

  • SAIMM
    A Case Study Application Of Linear Programming And Simulation To Mine Planning - Synopsis

    By J. A. de Carvalho Junior

    This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod

    Jan 1, 2012

  • SAIMM
    A Case Study Application Of Linear Programming And Simulation To Mine Planning ? Synopsis

    By J. A. de Carvalho Junior

    This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod

    Jan 1, 2012

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • DFI
    A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation Piles

    By Chris Leach, Lucie Spencer

    This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste

    Nov 1, 2022

  • SME
    A Case Study Establishing Optimization Techniques and the Procedure for Successful Numerical Simulation of Ground-Structure Interaction - NAT2022

    By Ali Keneti, Xavier Ryan, Gerardo Sanchez, Shannon Goff

    In this study, FLAC3D modeling was conducted for ground-structure stability assessment for a pilot tunnel passing under a large shaft excavated in the vicinity of existing structures at Karangahape St

    Dec 1, 2022

  • NIOSH
    A Case Study Examination of Two Blast Rounds at a Nevada Gold Mine

    By Ed Mchugh

    NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i

    Jan 1, 2007

  • SME
    A Case Study Exploring Field Level Risk Assessments as a Leading Safety Indicator

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    "DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. Reference to sp

    Jan 1, 2017

  • SME
    A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2017

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co

    Jan 1, 2017

  • SME
    A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2018

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co

    Jan 1, 2018

  • SME
    A Case Study from India on TBM Driving Under Low Overburden - RETC2023

    By Debasis Barman

    TBM (TBM) mining in urban areas particularly under low overburden is a big challenge to design and excavate. During excavation of the Lucknow Metro project, in Uttar Pradesh, India the metro authoriti

    Jun 13, 2023

  • NIOSH
    A Case Study in Applied Social Marketing: Developing an Occupational Safety and Health Product

    By Douglas F. Scott

    This case study provides an example of how social marketing was applied to meet the needs of business customers. Federal regulations require that all companies develop a written program to track hazar

    Jan 1, 2009

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to Mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian Mining Industry, possibly as a consequence of the downturn in mar

    Jan 1, 2000

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • SME
    A Case Study in Successful Progressive Design Build Tunneling - RETC2023

    By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez

    Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and

    Jun 13, 2023

  • SME
    A Case Study In The Use Of Kinetic Models To Justify Expansion Of The Rougher Flotation Circuits At The Metcalf Concentrator

    By Richard C. Travis, Edward C. Dowling

    A detailed kinetic study of the flotation installation at the Metcalf Concentrator revealed a rougher flotation circuit operating under less than optimal conditions. Based on these results, a project

    Jan 1, 1993