Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design And Start Up Of The Cortez Gold Mines Pipeline MillBy R. N. Powell
The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the
Jan 1, 1999
-
Wetting The Coal Face For Dust Control In Longwall Mining At High Ventilation Air SpeedsBy J. -G. Swanson
Dust control in longwall coal mining depends primarily on the prevention of dust at the source and secondarily on the suppression of airborne dust. One of the primary methods for the prevention of du
Jan 1, 2012
-
New Boomheading Machines (Roadheaders) Technical & Economic Integration Into Mine Development And ProductionBy Howard J. Handewith
Long used in mine development in England, Europe and Russia, roadheaders are growing in size, features, productivity and application. Beginning with the basics, this paper covers the economic and t
Jan 1, 1983
-
The Technology And Economic Incentives For Recovering Coal From Tailings ImpoundmentsBy A. S. Murphy, E. V. Manlapig, C. Green, J. W. Parkinson
Historically in Australia and the United States many coal mines deposited raw wash plant fines into large slurry impoundments. At the time the technology and market economics did not exist to make it
Jan 1, 2001
-
Producing a GIS Based Multi Attribute Decision Making for Social and Environmental Sustainability Assessment in a Copper Mine in IranBy B. Farshadi, B. Asi, M. J. Habibian
"Dare-Zereshk deposit is one of the deposits supplies ore for Taft copper Complex in Iran Yazd province. This deposit is situated underneath a village the same name. Prior to mining activities, the vi
Jan 1, 2011
-
Large Flotation Cell Tests Successful in ChileBy J. Kallioinen
The development of mechanical flotation cells has resulted in larger and better cells. This has led to flotation banks with only a few units, even in large-scale operations. This equipment development
Jan 1, 1995
-
How To Ensure Seismic RequirementsBy A. Fuerst
The recent seismic events have shown that earthquakes have an immense destructive power. Chile was hit in February 2010 with a seismic intensity of 8.8 on the Richter scale, and had loss of about 700
Jan 1, 2012
-
Technical Note - Increased value of refined high sulfur coalBy P. R. Dugan
Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute
Jan 8, 1987
-
Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South DakotaBy J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington
EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal
Jan 1, 2004
-
Vernal Mine: 19 Years Without a Lost-Time AccidentBy John B. Spencer
Earlier this year, Simplot Phosphates achieved a safety milestone at its Vernal, UT phosphate operations. In March, the entire operation reached achieved seven years without a lost time accident. An
Jan 1, 2004
-
A New Short- And Medium-Term Production Planning Tool - Minesight® Schedule Optimizer (MSSO) - Preprint 09-079The MineSight Schedule Optimizer (MSSO) is a new production scheduling tool developed by Mintec, Inc. using mixed integer linear programming (MILP) techniques. This tool was developed to solve the sho
Jan 1, 2009
-
Mines of Today Educating Minds of TomorrowBy Dan Witkowsky
Beginning on June 11, 2007, as many as 36, kindergarten-to-grade-12 (K-12) teachers will participate in a program designed to educate them all about the mining industry. The 39th Annual A Total Concep
Jan 1, 2007
-
Using Administrative Controls to Reduce Tailings – Dam RiskBy G. H. Glos
There was a time when an occasional failure of a tailings embankment was considered an acceptable risk associated with mining activities. This is not the case anymore. A major tailings failure today
Jan 1, 1999
-
Ventilation System Operating Cost Comparison Between A Conventional And An Automated Underground Metal MineBy C. K. Kocsis, S. Hardcastle
Mine ventilation, requires electricity to operate the fans and fossil fuel for heating. Typically, this accounts for approximately 40% of the overall underground energy consumption. This is considerab
Jan 1, 2002
-
New York Subway Caverns and Crossovers—A Tale of Trials and TribulationsBy Charles Stone, Madan Naik, Drupad Desai, Karel Rossler
Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1
Jan 1, 2005
-
Construction Of Explosion Resistant Seals – Preprint 97-83By C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Feb 24, 1997
-
Chemical Mining - Theoretical And Practical AspectsBy Paul W. Johnson
Chemical mining is the in situ extraction of metals from ores located within the confines of a mine (broken or fractured ore, stope fill, caved material, ores in permeable zones) or in dumps, prepared
Jan 1, 1967
-
Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240By Keith Jones, Michael Francis
Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an
Jan 1, 2005
-
Communication : The missing link in the minerals industryBy Pat C. Hautala, J. R. Hoskins
This is a new era for the minerals industry. Never before has there been more need for effective communication. So said Robert Anderson, chairman and chief executive officer of Hanna Mining Co. He was
Jan 1, 1985
-
Detection And Control Of Calcium Sulfate Precipitation In The Lead Circuit Of The Hilton Concentrator Of Mount Isa Mines Limited, AustraliaBy P. L. M. Wong, N. W. Johnson
Surface analysis by X-Ray Photoelectron Spectroscopy (XPS) of samples taken from the galena flotation section of the Hilton Concentrator of Mount Isa Mines Limited are presented. Flotation rate and pu
Jan 1, 1995