Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Operating Manuals As A Tool In Operator Training For Metallurgical Plant Start-UpsBy S. R. Brown
A number of relatively recent factors associated with the design of new metallurgical processing plants have made the effective training of operators a requirement for a successful start-up. Some of t
Jan 1, 1995
-
The Importance of Risk Management on Tunneling and Underground Construction ProjectsSeveral major impediments threaten the successful delivery of tunnel and under-ground construction projects. In addition to technical design and construction risks associated with tunnel projects, man
-
Analysis and Design of Faceroad Roof Support (ADFRS)By Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a longwall installation roadway (faceroad) design methodology that could be utilized
-
Geology Of The Montgary PegmatiteThe Montgary pegmatite is located at Bernic Lake in the southeastern Manitoba pegmatite district. 'It has a complex internal structure with several contrasting mineral assemblages. The pegmatite
Jan 1, 1959
-
NMA’s MINExpo ’96 Plans for 30,000 People and More Than 900 ExhibitorsThe National Mining Association’s (NMA)MINExpo International ’96 is shaping up to be the organization’s largest. About 30,000 mining industry business and technical professionals are expected to desc
Jan 1, 1996
-
Until the End and Beyond: The Sustainable Development Strategy of the German Hard Coal Mining IndustryBy J. Kretschmann
"By the end of the 1950s, the German hard coal mining industry produced 150 million tons of hard coal per year in 170 collieries with 600,000 employees. At that time, 70% of the primary energy demand
Jan 1, 2017
-
Development Of A Longwall Management System (LMS) (262e4baa-95db-4e60-8ccc-e53589aa0a1f)By W. M. Hart
The current Automatic Data Acquisition system developed by some support manufacturers makes it possible to continuously monitor and record changes in leg pressure and advancing ram stroke in every shi
Jan 1, 1995
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin
The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D
Jun 13, 2021
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
A Protocol for Reclaiming in-Pit Tailings Ponds to Exceed Federal and State RegulationsBy J. Seifert, L. Hunter, P. W. Conrad, S. Rosenthal
"The goal of the protocol for reclaiming in-pit tailings ponds to exceed federal and state regulations was to develop a series of steps that can be followed to design, operate, and reclaim a tailings
Jan 1, 2018
-
A Study-BHP Robinson And BHP TintayaBy II Browne
After a decade of high copper prices, major mining companies are renewing their interest in purchasing operating properties and/or development of ore bodies. An existing operation carries with it a hi
Jan 1, 1997
-
Microcomputer Analysis Of Continuous Mining Systems For Better Management Control And ProductivityBy S. G. Britton
Microcomputer analysis has long been a technique for engineering professionals to improve the theoretical and practical design of continuous mining systems. Such work has been typically composed of mo
Jan 1, 1991
-
Updated Study of a Low Overburden Longwall Recovery with Pre-Developed Recovery EntryBy J. C. Stankus, R. Ochsner, B. Hanson
"Bull Mountains No. 1 mine of Signal Peak Energy made another success in its 4 Right pre-developed recovery entry on March 23 and 24, 2015, after the first successful cut-through and shield retrieval
Jan 1, 2016
-
Geotechnical Study For In-pit Coal Refuse Tailing Cells - SME Annual Meeting 2022By M. B. Haggerty, R. J. Sheets, F. Abbasy
To address coal refuse tailings storage needs for a mine operation in western Canada, a feasible solution was to convert excavated open pits into tailings cells. A slope stability investigation and de
Mar 2, 2022
-
Transloading: A Case Study Of The Tucker Hill Perlite Project And Its Transloading TerminalBy Charles N. Speltz
The cost of transportation of industrial minerals frequently is higher than the cost of the product. When a mine, industrial-mineral plant, or customer is served by a single railroad, because of the l
Jan 1, 1999
-
Processing And Handling Of Liquid SulphurBy Edward J. McNamara
Sulphur as an element has been used for centuries. The technique of storing, handling and transporting it in its various forms has changed through the years. Freeport Sulphur Company, a division of Fr
Jan 1, 1978
-
Secrets of the Bond Ball Mill Grindability Test - SME Annual Meeting 2024By Vladimir Nikolić, Alex Doll
The Bond ball mill grindability test is one of the most common metrics used in the mining industry for ore hardness measurements. The test is an important part of the Bond work index methodology for d
Feb 1, 2024
-
Mini Symposium - Crushing And Grinding Large Diameter Mill Drives - Gears For Large Diameter Mills DrivesBy Russell G. Shomperlen
Grinding mills in excess of 5 meter diameter and 3500 kilowatts per mesh are putting new demands on big gears. This paper returns to the basics of ring gear design beginning with the fundamental power
Jan 1, 1981