Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine
By B. P. Watson
Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i
Jan 1, 2014
-
Radio frequency propagation model and fading of wireless signal at 2.4 GHz in an underground coal mine
By A. Patri, D. S. Nimaje
Wireless sensor networks and wireless communication systems have become indispensable in underground mines. Wireless sensor networks are being used for better real-time data acquisition from ground mo
Jan 1, 2015
-
Development Of Modified Gas Indices For Early Detection Of Spontaneous Heating In Coal Pillars
By D. C. Panigrahi
Extensive field studies have been carried out to investigate the pillar fire problems in one coal mine in India. A Thermal IR gun and a Thermovision camera have been employed for thermal scanning to a
Jan 1, 2004
-
Economic Modelling And Optimisation Application In The Mining Industry
By N. Sasto, E. Bondi, G. R. Lane
Cyest Corporation has been involved in economic modelling and optimisation with various mining clients within South Africa, and internationally, for the past 5 years. In the mining industry in par
Jan 1, 2007
-
Fatigue Knowledge?A New Lever In Safety Management - Synopsis
By W. J. Theron
The purpose of the paper is to give an introduction to the concept of fatigue and its causes in the mining industry. By knowing the fundamental role it plays, together with its dynamics, can positivel
Jan 1, 2011
-
Green Topics ? Colloquium Environmental Management In The Mining, Minerals And Metals Industries 20 June 1996 - Background
Despite the media's use of the mining industry as a whipping boy over its perceived attitude towards the environment, the facts remain that the only legislated requirement in the SA Statute Books
Jan 1, 1996
-
Kinetics Of Reduction Of Different Manganese Ores
By Manoj Kumar, S. Ranganathan, S. N. Sinha
The reducibility of three different manganese ores with coke was studied. The three ores were reduced to different extents under the same experimental conditions. The investigations showed that in the
Jan 1, 2007
-
Ventilation systems in dead-end headings with coal dust and methane hazard
By J. Szlazak, A. Tor, M. Borowski, N. Szlazak, D. Obracaj
This article presents the analysis of ventilation systems used in dead-end headings, while being drilled, in coal mines. Special emphasis is put on methane and dust hazard. Mathematical model for dist
Jan 1, 2003
-
Testing Of Temporary Face Support Systems Under Rockfall Conditions
By J. L. Human, N. Fernandes
The rockfall hazard is the major contributing agency to fatal accidents in South African platinum mining operations. The majority of these accidents occur in close proximity to the working stope face.
Jan 1, 2004
-
The Estimation Of Platinum Flotation Grade From Froth Image Features By Using Artificial Neural Networks - Synopsis
By C. Marais
The use of machine vision in the monitoring and control of metallurgical plants has become a very attractive option in the last decade, especially since computing power has increased drastically in th
Jan 1, 2011
-
A computer program for estimation of support requirements for circular shafts
By H. Ozturk
In this paper, the computer program ‘SHAFT’ developed for estimation of support requirements for circular mine shafts is introduced. Theory of support design is based on the analytical solutions of ci
Jan 1, 2003
-
A Quantitative Method for Selecting Renewable Energy Projects in the Mining Industry Based on Sustainability
By M. Mostert
Mining companies sponsor a range of non-core, corporate social responsibility projects to adhere to social and labour plans and environmental management prerequisites that form part of a mining licenc
Jan 1, 2014
-
Integration of imprecise and biased data into mineral resource estimates
By E. Machaka, A. Cornah
"Mineral resources are typically informed by multiple data sources of varying reliability throughout a mining project life cycle. Abundant data which are imprecise or biased or both (‘secondary data’)
Jan 1, 2015
-
Stochastic simulation for budget prediction for large surface mines in the South African mining industry
By V. S. S. Yadavalli, J. Hager, R. Webber-Youngman
"This article investigates the complex problem of a budgeting process for a large mining operation. Strict adherence to budget infers that financial results align with goals. In reality, the budget is
Jan 1, 2015
-
A Case Study On Stoping Shift Buffering At Impala Platinum: A Critical Chain Project Management Perspective ? Synopsis
By R. C. D. Phillis
Conventional stoping in hard rock mining is largely considered an operational environment. This paper suggests that stoping falls within the realm of a project management environment typified by uncer
Jan 1, 2011
-
An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? Synopsis
By T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
Enhanced Geological Modelling of the Upper Elsburg Reefs and VCR to Optimize Mechanized Mine Planning at South Deep Gold Mine
By K. Osburn
South Deep Gold Mine, owned by Gold Fields Ltd., is situated near Westonaria in the Gauteng Province of South Africa and mines the conglomerate bands of the Upper Elsburg reefs (Mondeor Conglomerate F
Jan 1, 2014
-
Pre-sink shaft safety analysis using wireline geophysics
By N. Andersen
During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic
Jan 1, 2015
-
Contract—A tool for evaluating mining contracts
By D. McCarthy
Contract is a PC-based software program designed to satisfy the main features that have been identified to be lacking from cost estimation systems currently in place in the Australian coal industry. C
Jan 1, 2003
-
FE Modelling Of Mining-Induced Energy Release And Storage Rates
This paper describes a simple finite element (FE) modelling approach which leads to the computation of seismic energy release rate (ERR) and strain energy storage rate (ESR) which result from mining.
Jan 1, 1999