Environmental Effects of Blast Induced ImmissionsBy Rolf R. Schillinger
Subject of the paper are blasting vibrations as sources of environmental molestations including acceptance level,complaint level and damage level as well. Besides, the subject shows a comparison of in
Jan 1, 1996
-
Ring Blasting Mine to Mill OptimizationBy Joel Chipana, Roberto Laredo, Benjamin Cebrian
Ring blasting is a common production method in underground metal mines. As a drill and blast process, it presents particular features that do not correspond with bench blasting in open pit or undergro
Jan 1, 2017
-
Control of the Flyrock and Vibrations for the Protection of Electrical InstallationsBy Jorge Cárdenas, Piero Mejía, Diego Gamarra
The present case study details the solution to a complex situation in a mining operation, involving the challenge of expanding the tailings storage facility in high-criticality areas adjacent to elect
Jan 21, 2025
-
Blast Vibration Analysis from Signature HolesBy Nikolaos Petropoulos, Ulf Nyberg, Daniel Johansson
A series of signature boreholes were blasted to observe any difference between confined and free face blasts. Four geophones were used to capture the compressive wave. The conventional approach, i.e.
Feb 1, 2020
-
A Study of Investigating the Relationship between Geological Strength Index and Ground Vibration Frequency Induced by BlastingBy Ali Kahriman, D. Adiguzel, R. Ulger, U. Akkaya
The environmental problems arising from ground vibration has been faced and discussed frequently in various industries such as quarry, mining, civil works, shaft, tunneling, pipe line and dam construc
Jan 1, 2011
-
Testing Electronic Detonators to Increase SAG Mill Throughput at the Red Dog MineBy Norman Paley
A blasting project was undertaken at the Teck Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by using electronic detonators. The Jul
Jan 1, 2010
-
Comparison of Compliance Measures for Blasting near an Industrial Structure Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part IIIBy C. Aimone-Martin, C. Dowding, M. Jern, J. Gjødvad
This article compares percentages of compliance for six national standards to demonstrate how these standards vary on-site in a real project. This, to the best of the authors' knowledge, has not been
Jan 1, 2024
-
Radical Improvements to Blast Hole Drilling Cost and Productivity thru Integrated Teams (021b2c60-f412-46df-9bbc-00d582f72391)By R W. Thomas
This paper explores the possibilities of generating radical improvements in the drilling costs and productivity of blastholes through the efforts of integrated teams as opposed to traditional customer
Jan 1, 1996
-
Public Relations for Drilling and Blasting ProjectsBy Mark Fritzen
Drilling and blasting near residential or business inhabited areas may expose people to blast induced vibration. Many of these people have never been exposed to blast vibration and airblast which can
Jan 1, 2000
-
Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy
Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush
Jan 21, 2025
-
Productivity Increases Through Pattern Expansion With Ultra-HighBy Miguel Humpire Huamani, Gustavo Huerta Valer, Jorge C. Cárdenas Miranda
As part of the continuous improvement and increase productivity to achieve the mining and extraction plan of a low-grade open pit copper operation, alternatives are required to expand the blast patter
Feb 6, 2023
-
Powder Factor Analysis of Quarry Blasts Through the Fragmentation-Energy Fan ConceptBy Ian Bell
This paper investigates fragmentation in an aggregate quarry using the fragmentation-energy fan concept. Six blasts were monitored, located one behind the other in the same quarry area. The rock struc
Jan 1, 2019
-
Estimation of Critical Distances to Avoid Failures in Detonators by Dynamic Pressure.By Lizbeth A. Escobar, Phol M. Llanos, Maritza Y. Avila
The present research develops the estimation of critical parameters such as the distances and times between holes to avoid failure due to dynamic pressure in electronic detonators based on the near-fi
Feb 1, 2020
-
The Use of Electronic Detonators to Control Air BlastBy Andy Hudson, Stuart Brashear, David Lilly
Because of greatly increased timing accuracy, electronic detonator systems are a well-known and widely accepted major tool to control and reduce ground vibration. At a Southeastern quarry the authors
Jan 1, 2009
-
Conversion from Two-Pass Overburden Removal to Cast Blasting at Simplot PhosphatesBy Dale Preece, Steven Case, Cassidy McAllister
Simplot Phosphates produces high quality phosphate fertilizer through open pit mining. The operation near Vernal, UT began as a three-pass mining process carried out with drill and blast followed by t
Jan 1, 2012
-
Mine Blasting Safety: Decades of ProgressBy Harry Verakis, Thomas Lobb
Blasting accident data over a 30-year period (1980-2010) are summarized and presented for all types of surface and underground mining operations in the USA. The historical record of injuries from blas
Jan 1, 2012
-
Vibration Workshop Abstract Canadian Vibration and Airblast RegulationsBy Paul McAnuff, Alastair Grogan
In Canada, the only vibration regulations which apply across the entire country are intended to protect fish spawning areas. The Provinces and Territories regulate mines and quarries, and are responsi
Jan 1, 2005
-
Analysis of Air Blast Overpressures within a Negative Pressure BoundaryBy Frederick B. Kuhnow
Harmonic energetic delamination of T2 building is being considered for demolition at a formerly known atomic lab. The T2 building is within a containment structure that is under a negative pressure of
Jan 1, 2017
-
Journal: Blast Vibration and Seismograph Section / A History of the Development of Instruments for Measuring Vibrations of the Earth / Part 4By Robert Hopler
Although electrical instruments were being widely introduced into the study of seismic tremors, attempts to understand and quantify shocks from blasting continued to use rather primitive methods well
Jan 1, 2007
-
Difficulties and Suggestions when Drilling and Blasting in a Karst EnvironmentBy James T. Ludwiczak
Drilling and blasting in a Karst (sinkholes and mud seams) environment has long been a problem for blasters, miners, quarry operators, contractors, and developers. While one cannot change the geologic