Level Crossing Removal Project – Package 1
By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering Guidelines
By M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
A Case Study, Design Change from Spread Footing to Drilled Shafts
By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal
"This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi
Jan 1, 2016
-
Double Rotary CFA Piles: Performance In Cohesive Soils
By Michel Bustamante
The occasional substandard performances of continuous flight auger in particular soil conditions have prompted the drilling rig manufacturer to improve the standard CFA in order to reduce its negative
Jan 1, 2002
-
Evergreen Line Rapid Transit Project: Analysis and Design of Deep Soil Mix Panels to Mitigate Seismic Lateral Spreading
By E. Naesgaard, Brian E. Hall, A. Amini, Advanced Geosolutions, A. Azizian
"A 2 km section of the Evergreen Line Rapid Transit Project is supported on improved ground consisting of cement deep soil mix (CDSM) panels because of highly variable and challenging soil conditions,
Jan 1, 2015
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case Study
By Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu
Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi
Nov 1, 2022
-
Analysis of Water Leakage in Downstream Dam Toe of Komani Dam
By Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi
"Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita
Jan 1, 2016
-
Accuracy of Low-Strain Pile Integrity Test Results
By Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
A Brand New Barrier Wall Installed at Wolf Creek Dam
By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
Design-Build Synergy To Deliver Pile Foundations
By David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The Netherlands
By Klaus Pöllath
The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri
Jan 1, 2006
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part One
By Christian Divis
[ ]
Jan 1, 2002
-
Deep Mixing for Levee Repair at Hurricane Protection Project, P-17A, Louisiana, USA
By Peter Cali, David Yang, Rakshya Shrestha, Ralph Griffin, Sushil Kafle, Motoji Watanabe
"As a part of the ‘US Army Corps of Engineers - New Orleans to Venice, Louisiana Hurricane Protection Project’, deep mixing ground improvement was designed to reinforce the soft ground for the emergen
Jan 1, 2015
-
Influence Of Urbanization And Geology On Deep Foundation Design And Construction
By Hiren J. Shah
The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his
Jan 1, 2011
-
Predication Of Heave For Deep Excavation With Irregular Plane Shape
By Zhang Jiaju
For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method
Jan 1, 1991
-
Atoka Pipeline - Canadian River Crossing
By Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Specialized Slurry Wall Equipment - The Hydromill - Summary
By Mario Mauro
The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l
Jan 1, 1994
-
Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite Bedrock
By Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay
"Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven
Jan 1, 1900
-
Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project
By H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006