    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • DFI
    Innovative Alternate Underpinning Solution for Historic Structure in Boston Suburb

    By Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson

    Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th

    Sep 8, 2021

  • DFI
    Design of Grillage and Helical Pile Foundation for Limited Access Transmission Line

    By Benjamin Jennings, Jason Herron

    In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis

    Jan 1, 2017

  • DFI
    Ground Improvement for Reclaimed Landfills

    By Steven E. Darnell, William W. Haasz, Brandon T. Buschmeier, Frederic Masse

    "Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill propertie

    Jan 1, 2017

  • DFI
    In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway Embankment

    By Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N

    The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in

    Nov 1, 2022

  • DFI
    Case Histories On The Applications Of Colloidal Silica For Permeation Grouting

    By Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden

    Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject

    May 1, 2022

  • DFI
    A Tall Slender Tower Rises On Secant Piles and Drilled Shafts

    By Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet

    Jan 1, 2016

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015

  • DFI
    Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension

    By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee

    "The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u

    Jan 1, 2015

  • DFI
    Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California

    By Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa

    "The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un

    Jan 1, 2015

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Lateral Stresses On Multilevel Tieback Walls

    By Liiban A. Affi

    The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also

    Jan 1, 2010

  • DFI
    Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole Inspection

    By Sastry Putcha, Santosh Mummaneni, Avasarala Swamy

    "Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that

    Jan 1, 1900

  • DFI
    Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of Piles

    By Venugopal Bonani, Kumaran M., Thomas John

    Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a

    Sep 1, 2022

  • DFI
    State of the Art Ground Improvement Technique for a Residential Complex: Case Study

    By Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan

    "For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr

    Jan 1, 2015

  • DFI
    Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case Study

    By Balasubramani M., Ramana P. V., Bairagi K.

    This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the

    Nov 1, 2022

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • DFI
    Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement Plots

    By Lenin T., Madhav M. R., Padmavathi V.

    Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging

    Sep 1, 2022

  • DFI
    Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative Solution

    By Mario Mauro

    In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi