The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? SynopsisBy J. P. Burland
The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a
Jan 1, 2010
-
Evolution Of Helical Screw Pile Design And InstallationBy Michael Perlow
Helical screw piles in use since 1838 are routinely used for energy, transportation, municipal, industrial, marine and coastal infrastructure as well as for excavation support, environmental remediati
Jan 1, 2011
-
Change In Bearing Capacity Of Bored Steel H Piles Enclosed In Soil-Cement Columns With Overburden Pressure - SynopsisBy Tomio Tsuchiya
A construction method of bored steel H piles enclosed in soil-cement columns was developed by modifying steel H piles from the driven pile method and soil-cement walls from the earth retaining wall me
Jan 1, 1996
-
Installation Of Augered Cast-In-Place PilesBy Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2009
-
Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock SlopeBy Herbert F. ?Buck? Darling
A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat
Jan 1, 2013
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Mobilised Shear Strength on the Failure Surface of 2D Belled Anchor Model Piles under Uplift in Cohesionless SoilBy Tanaya Deb, Sujit Kumar Pal
"Experimental investigations are carried out on failure pattern around 2D models of belled anchor piles in dry sand bed of density 15.60 kN/m3 under uplift. The models are having thickness ratio (Ts/T
Jan 1, 2015
-
Ground Improvement By Means Of Stabilising ColumnsBy Georg Breitsprecher
The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen
Jan 1, 2006
-
In-Situ Ground Reinforcement TechniquesBy P. J. Nicholson
The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement
Jan 1, 2010
-
Improvement Of Bearing Capacity Of Bored Piles By Grouting MethodBy Andrzej Tejchman
A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham
Jan 1, 2002
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Performance Specifications For Drilled PilesBy Dan Brown
Deep foundation contracting for transportation projects in the United States has typically followed the design-bid-build model in which contractors bid on a specific work product according to relative
Jan 1, 2006
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Time-Dependent Increase Of The Bearing Capacity Of Displacement PilesBy Florian König
It is well known that the bearing capacity and stiffness of displacement piles may increase significantly with time, a phenomenon usually referred to as set-up. In cohesive soils the set-up is commonl
Jan 1, 2006
-
Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete ProcessBy E. W. Raabe
The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available
Jan 1, 1989
-
Design Equations For Laterally Loaded Piles Embedded In SandBy T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
Earth Pressure Acting On Single Driven Piles In SandBy Adel Hanna
Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin
Jan 1, 2003
-
The Role Of Real-Time Instrumentation In Large Infrastructure ProjectsBy J. G. La Fonta
The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be
Jan 1, 2006
-
New Technique To Drive Piles By Impact Hammer Inside The Pile - SynopsisBy Djk Arentsen
A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea