Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Explosive dust management system for underground coalmines, digitally integrating stone dust application, sampling plans, and results to help mitigate explosion risk

    By B Waldon, M Valastro

    A coal dust explosion is one of the most significant risks in the harsh and complex environment of an Underground Coal Mine (UCM). Reviewing literature, regulations and existing systems surrounding ex

    Apr 16, 2024

  • AUSIMM
    Smelting of nickel and vanadium wastes to produce green steel

    By D Lalor, N Goodman

    The increasing demand for batteries is resulting in the development of large-scale projects for the production of key battery metals such as nickel and vanadium. Several of these projects plan to extr

    Sep 18, 2023

  • AUSIMM
    Risk assessment tool for mines using diesel-powered mobile equipment

    By A Reid, A W. Musk, O Jones

    In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa

    Oct 16, 2017

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    Segregating tailings – effects on density and water retention

    By K Seddon

    Segregation of tailings on deposition can occur as a result of a) sub-aqueous deposition, and b) sub-aerial deposition at lower solids concentrations (i.e. when the solids concentration is less than t

    Jul 23, 2018

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • AUSIMM
    A System of Diluting Methane to Safe Levels

    By R Hughes

    "Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.

    Jun 1, 2012

  • AUSIMM
    Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding Circuits

    By G Lane, M Bueno

    In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing

    Oct 29, 2012

  • AUSIMM
    A Large-Scale Unconfined Compressive Strength Test for Determination of Rock Mass Parameters in Tunnel Design

    By A Smith

    Rock masses usually exhibit scale dependent mechanical properties primarily due to presence of discontinuities and their inhomogeneous nature. One of the essential preconditions for selection of appro

    Mar 8, 2011

  • AUSIMM
    Mine Data Analytics – New Skills Required for Tomorrow’s Mines

    By P Knights

    This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins

    Nov 22, 2011

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Real-Time Image Analysis of Iron Ore Cores and Drill Chips to Complement Spectral Measures

    By T Belligoi

    Diamond cores and drill chips provide the only direct physical evidence for ore containing rocks. Early characterisation of cores and drill chips is important as it provides critical information for d

    Jul 11, 2011

  • AUSIMM
    Mineral Resource Classification - It's Time to Shoot the 'Spotted Dog'!

    By P T. Stoker, A Allman, D P. Carville

    Classification of mineral resource estimates is one of the most important responsibilities of the Competent Person. In recent years, classification decisions have been driven more by the detailed bloc

    Jan 1, 2006

  • AUSIMM
    Understanding ore heterogeneity and effective bulk ore sorting using PGNAA/PFTNA

    By S Ferguson, G Noble

    The mining industry is facing economic pressures to treat more challenging and lower grade ore types, as well as pressure relating to environmental impact and social license to operate. Preconcentrati

    Nov 10, 2020

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    Lump Ore Properties and Their Impact on Value-in-use in Ironmaking

    By T Honeyands, L Jelenich

    We are currently witnessing large fluctuations in the relative price of ironmaking raw materials brought on by changes in the dynamics of supply and demand, market conditions, environmental regulation

    Jul 13, 2015

  • AUSIMM
    Real-time Through-belt Moisture Analysis for Iron Ore

    By A Harris, L Balzan

    Accurate measurements of the moisture content of iron ore have increasing importance in modern mining operations. Knowledge of the moisture content allows process control actions to be carried out to

    Jul 13, 2015

  • AUSIMM
    Modelling of Near-Source Dust Dispersal From Surface Mine Blasting in Weak Wind and Tropical Conditions

    By S Bhandari

    This paper is a step in the direction of developing a computer model of the near source dispersal of suspended particulate matter (SPM) in planetary boundary layer (PBL). Since Surface Mine blasting i

    Jan 1, 2001

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Keeping up with the Joneses – the value of industry surveys and benchmarking

    By T D. H McGrath, W P. Staunton

    Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to

    Aug 29, 2018