Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element Deposit

    By J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop

    Mar 18, 2015

  • AUSIMM
    Innovations in underground hard rock operator efficiency – through simulation-based training technologies and processes

    By J A. de la Torre, I R. Cerna, G K. Karadjian

    The La Colorada underground mine in Zacatecas, Mexico is a mechanised cut-and-fill silver mine with a capacity of 1250 t/d. The project focused on training the mine’s experienced operators for a fleet

    Oct 16, 2017

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old Concept

    By C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie

    "Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass

    Jun 15, 2016

  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • AUSIMM
    Forging Ahead - A Collaboration Between the OZ Minerals Prominent Hill Concentrator and Magotteaux to Improve Plant Performance

    By PáDeáBosscher, A Bruwier, M Weidenbach, C Philippe, T Ly, A Van Den Bosch

    In the mining business the cost of grinding media represents up to 40 per cent of the total milling cost and therefore grinding media optimisation has a direct impact on the concentratorsÆ bottom line

    Oct 29, 2012

  • AUSIMM
    A guide to reporting Mineral Resource exclusive of Mineral Reserve

    By H Arvidson, V Chamberlain, R Marinho, B Parsons, T Rowl, M Noppé, M Mattera

    With the introduction of CRIRSCO (2019) based mineral asset disclosure, Regulation S-K part 1300, 2019 (S-K1300) by the United States (US) Securities and Exchange Commission (SEC), applicable to compa

    May 24, 2023

  • AUSIMM
    The Use of Rezoning Techniques to Model Historic Tailings Failures

    By D Reid

    Run-out analyses of tailings storage facilities are typically undertaken using methods based on rheological theory. These are reasonable techniques to model the behaviour of tailings that, through sig

    Jul 27, 2015

  • AUSIMM
    The challenges of producing high purity quartz

    By D Connelly

    Quartz deposits are common in nature but the presence of quartz suitable for yielding high purity quartz is exceedingly rare. This paper describes a test work study on producing high purity quartz (HP

    Sep 1, 2024

  • AUSIMM
    New Blasting Initiation Technologies in the Mining Industry

    Alfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based

    Jan 1, 2005

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015

  • AUSIMM
    Application of three lines model in resource and reserve estimation and reporting

    By D Hope, D K. Mukhopadhyay, J D. Harvey

    South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang

    May 24, 2023

  • AUSIMM
    Mechanism analysis and particle flow simulation of water-sand inrush in thin bedrock working face

    By S Li, Y Lei, X Wu, C Ma, W Q. Zhang

    The failure of roof of thin bedrock working face under loose aquifer in a coalmine can lead to water-sand inrush disaster. Based on the accident of water-sand inrush in 30108 working face of a mine in

    Nov 29, 2022

  • AUSIMM
    Putting the ‘GEO’ back in front of GEOmetallurgy: importance of early implementation of quantitative mineral system characterisation, classification and modelling

    By W Potma, C Brauhart, S Halley, S Urbisinov, A Scogings

    Truly integrated, quantitative, 3D GEOmetallurgical (or mineral system) characterisation, classification and 3D modelling should provide a cradle to grave unifying link across the exploration and mini

    Nov 21, 2018

  • AUSIMM
    Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPs

    By L McCallum, G Dale, B Silverwood, T Roscoe, A Costin

    The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres

    Aug 2, 2023

  • AUSIMM
    Supervisors and Teams at Work

    By T G. Neville, G Terrey, J Burns

    This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica

    Jun 22, 2016