Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut ProjectBy D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case StudyAn enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over
Aug 1, 2010
-
Mine Hoist Safety ù Selected AspectsThis paper summarises the current status of the mining sector in Poland in terms of vertical transport system safety. Selected results of research programs conducted at the AGH-UST relating to mine ho
Jan 1, 2005
-
Commissioning of Two 750 kW Centrifugal Fans at PT Freeport IndonesiaÆs Deep Ore Zone MineBy K Karmawan, T Casten
The PT Freeport Indonesiaæs Deep Ore Zone (DOZ) copper deposit is located in the province of Irian-Jaya, Indonesia. Currently, a block cave mine is being developed around this deposit. Production is s
Jan 1, 2000
-
Commissioning - From a Project Manager's ViewpointCommissioning is one of the many phases of a project, it has inter-dependencies with the other phases, as they have amongst themselves, and has its own terminology and distinctive features. Commis
Jan 1, 1986
-
Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals provinceBy L Nicholls, A Parbhakar-Fox
Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa
Aug 2, 2023
-
A Review of the Applications of Tunnel Boring Machines in MinesBy Q Gong, J Li, J Zhao, Y Zheng
Excavation by tunnel boring machines (TBMs) offers many advantages over conventional excavation methods, in terms of safety level, working environment, advance rate and overall cost. While TBMs have b
Sep 17, 2014
-
Maximising asset value through optimal block by block decisions on marginal materialBy F Phillips, E Deucker, J Kato
It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari
Mar 15, 2021
-
Presentation of the Institute Medal, 1977 to Howard Knox Worner, C.B.E.By J. K. A. McLEOD
Address by the President of the Institute (Mr J K A McLeod) in presenting the Institute Medal to Howard Knox Warner, C.B.E. Address by Howard Knox Warner after accepting the award.
Jan 1, 1978
-
Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the CongoBy M G. Millad, M Zammit
The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa
Aug 18, 2014
-
Structure Response of a Brick Veneer House to Open Pit Coal Mine BlastingBy A B. Richards
A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu
Jan 1, 2001
-
Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New ZealandBy W Newns
This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.
Mar 8, 2011
-
Thermodynamics of Indium Cadmium MeltsBy Iwu GO, Almond DP, Joasoo _
The gravimetric integral Knudsen effusion method was used to measure cadmium activity values in binary liquid In-Cd alloys in the range 523 to 573 K. The activity measurements together with other s
Jan 1, 1980
-
Active explosion barrier conformance to the Australian Recognised Standard 21 – a total mine solutionBy A Späth
Active explosion barriers are used to contain and suppress a methane gas and/or coal dust explosion propagation, including localised mine fires. Early research indicated that these active explosion ba
Oct 12, 2022
-
Mine Environment Monitoring - So what has Changed Since Moura No 2?By D Cliff
"It has been 17 years since the mine disaster at Moura No 2 Mine in Queensland. Recent disasters in the USA and New Zealand prompt the question what has changed since 1994. This paper att emptsto answ
Jun 1, 2012
-
Innovation at the Hellyer ConcentratorBy G D RICHMOND, Campbell J. J
Aberfoyle Limited has developed the Hellyer complex base metal sulphide deposit located in North West Tasmania. As part of exploration and feasibility study, the ore was extensively tested, includin
Jan 1, 1992
-
Australia's North West Shelf LNG ProjectI congratulate The Australasian Institute of Mining and Metallurgy on its decision to hold its Annual Conference here in Western Australia. Western Australia, with its abundant mineral and energy r
Jan 1, 1989
-
Geometallurgical Modelling of the Dumont DepositBy M Sciortino, J Korczak, J Muinonen, A St-Jean
The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir
Sep 29, 2013
-
Effective Immersive Visualisation Systems for Mining Applications and BeyondBy E Widzyk-Capehart, T Bednarz, O Daud, N Cutmore
The interest of industry, in particular future mining, is pointing towards the use of novel visualisation systems to improve the operational efficiency of user interfaces. While the technologies used
Nov 4, 2015
-
Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?By G Hancock, A Kemp, I Taylor
The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T
Jul 16, 2014