Search Documents

  • ISEE
    Concepts and Case Study for Regular Rhythmic Timing and Sequence

    By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks

    "Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw

    Jan 1, 2016

  • ABM
    ESTUDO DA SUBSTITUIÇÃO TOTAL DA MAGNÉSIA POR RESÍDUOS REFRATÁRIOS MgO-C EM REFRATÁRIOS CONFORMADOS DA MESMA CLASSE

    By Diógenes Albert Gomes

    Neste trabalho são apresentados os impactos físicos e mecânicos da reciclagem de insumos refratários compostos por óxidos de magnésio ligado ao carbono, visando à reutilização destes como matéria prim

    Aug 16, 2017

  • NIOSH
    IC 8860 Operation Of The International Tin Agreement

    By Thomas J. Witzig

    This Bureau of Mines report is a background study of the International Tin Agreement. Attempts at stabilizing the tin market prior to the agreement are detailed, as well as the conditions and negotiat

    Jan 1, 1981

  • DFI
    Bending Strength Of Threaded Micropile Connections

    By Steven R. Musselman

    The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross

    Jan 1, 2007

  • AUSIMM
    Some Notes on "The Davis Calyx Drill".

    All previous attempts to cut rock in boring by means of revolving steel cutters have failed, chiefly in consequence of the mis-shapen teeth grinding the rock and themselves simultaneously, until, afte

  • AIME
    Succession of Minerals and Temperatures of Formation in Ore Deposits of Magmatic Affiliations

    By Waldemar Lindgren

    THE following pages present data accepted by many geochemists and geologists regarding the succession of minerals and the temperatures of formation in ore deposits affiliated with igneous rocks. They

    Jan 1, 1936

  • SME
    The Use Of Instrumented Split-Set Rock Bolts To Monitor Strain In The Walls Of A Deep Underground Mine Stope

    By F. Maciosek, D. Denton, J. Johnson

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health and personnel from Coeur Silver Valley, Wallace, ID, conducted tests using rock strain st

    Jan 1, 2004

  • NIOSH
    RI 3170 Washability Studies- Warrior View Mine, Tuscaloosa, AL

    By H. L. Anthony, A. C. Richardson, G. D. Coe

    "INTRODUCTION The Warrior View mine of the Seaboard Coal Corporation is located in Tuscaloosa County on the Warrior River about 14 miles northeast of Tuscaloosa, Ala. The Brookwood bed at this point y

    May 1, 1932

  • TMS
    Simulation of The Moulds Filling by the Finite Elements / Control Volume Method During RTM Process

    By J. Samir

    The objective of this study is to simulate the isothermal filling up of moulds by a RTM process when adopting CV/FEM and VOF method and when also taking into account the presence of obstacles coupled

    Jan 1, 2009

  • ISEE
    A Model for Near and Far Field Blast Vibration Based on Multiple Seed Waveforms and Transfer Functions

    By Ruilin Yang

    Blast vibration in the highwall from a cast blast in open pit mines or in the hanging walls from a stope blast in underground mines is a common concern. Vibration in such cases is a typical near-field

    Jan 1, 2010

  • AUSIMM
    Mining Methods at Iron Knob, South Australia

    In setting out to describe the methods and machinery employed at Iron Knob the writer does not attempt to give any information as to the situation, topography or geological features of the locality. T

    Jan 1, 1936

  • NIOSH
    RI 8724 In-Plant Recycling of Stainless and Other Specialty Steelmaking Wastes

    By L. W. Higley

    It is estimated that well over 20 million lb of chromium and 8 million lb of nickel, plus other metal values, are diverted annually to furnace dusts, mill scale, and contaminated swarfs in the domesti

    Jan 1, 1982

  • AUSIMM
    Leaching Characteristics of Australian Uranium Ores

    The leaching characteristics of a number of Australian uranium ores were determined under acid and alkaline conditions. Ores from the Ranger, Nabarlek and Koongarra deposits in the Northern Territory

    Jan 1, 1979

  • SAIMM
    Influence Of Slag Composition On Reduction Control And Operations Of The Slag-Cleaning Furnace At KCM, Zambia

    By H. M. Chikashi

    Keywords: Pyrometallurgy, furnace, bath agitation, regression analysis, entrainment This paper presents the results of linear regression analysis of the influence that each component of slag has on

    Jan 1, 2011

  • SME
    Waterproofing: Key to SCL tunnel lining design

    The global tunneling industry has many challenges, both technically and financially, with the latter likely to be a significant feature over the next few years. Many industries have ad-opted standard

    Jan 1, 2010

  • ISEE
    The Actual Cost of Hole Deviation to the Mining Industry - A case Study at Nkana Division of the Former Zambia Consolidated Copper Mines Limited

    By Sam Kangwa, Thomson Sinkala

    In the mining industry, drilling accuracy has a significant effect on the economy of operations. In this paper, results from the Nkana Division of the former Zambia Consolidated Copper Mines are prese

    Jan 1, 2004

  • SME
    Characterization of San Diego’s Stadium Conglomerate for Tunnel Design

    By S. J. Boone, A. Poschmann, C. Pound, A. Pace

    San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper

    Jan 1, 2001

  • SME
    Mining, EPA, and toxic waste : Will your mining company be liable?

    By Peter Haller

    Introduction The impact of the Comprehensive Environmental Response, Compensation, and Liability Act, or Superfund, as well as the Resource Conservation and Recovery Act (RCRA) and their state counte

    Jan 2, 1987

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • AUSIMM
    Risk and Alternate Dispute Resolution Options for Mining Companies Operating in South East Asia (Including a Case Study)

    By K Broadley

    Risk and dispute resolution are linked. Dispute resolution techniques are brought to bear on a dispute - which is an outcome of a risk being wholly or partially realised. There has been an increasing

    Jan 1, 1999