    Strategic long-term planning at Anglo Platinum - Synopsis

    By G. L. Smith

    This paper consolidates the key elements of seven contributions, on strategic long-term planning, to two of the three international conferences on Strategic versus Tactical approaches in Mining held o

    Jan 1, 2009

  • TMS
    Charpy Toughness Behavior of Continuous Sisal Fiber Reinforced Polyester Matrix Composites

    By Wellington Pereira Inácio

    This work investigated the toughness behavior of polyester matrix composites reinforced with up to 30% in volume of long, continuous and aligned sisal fibers by means of Charpy impact tests. It was fo

    Jan 1, 2010

  • DFI
    Load Testing Of Deep Foundations Using The Osterberg Load Cell

    By David E. Thompson

    This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and

    Jan 1, 1989

  • AUSIMM
    The Estimation of Gold and Tin Alluvials in Malaya

    The presence of gold or tin in a particular place in payable quantities may be suspected from geological and prospE;cting reports. It behoves the engineer by judiciously spaced boreholes or pits to es

    Jan 1, 1942

  • CIM
    Sidbec-Normines Inc. et la Production de Boulettes à basse Teneur en Silice et de Boulettes a Hauts Fourneaux à Port-Cartier

    By Réjean Lévesque

    SIDBEC-NORMINES a été incorporée en 1976. Depuis la fin de 1977, ses activités comprennent outre la concentration au lac Jeannine, près de Gagnon, du minerai de fer extrait du gisement du lac Fire, I&

    Jan 1, 1979

  • SME
    Using Real Options To Manage Technical Risk In Life Of Mine Planning: Application At Chuquicamata Underground Copper Mine, Chile

    By J. A. Botín

    Traditional risk quantification methods provide little information on the sources of risk, and tend to produce static over-conservative evaluations, which do not account for changes in the performance

    Feb 27, 2013

  • NIOSH
    OFR-64-75 Proceedings Of The Second WVU Conference On Coal Mine Electrotechnology

    A compilation of papers presented at The Second WVU Conference on Coal Mine E1ectrotechnology in Morgantown, West Virginia on June 12 -14, 1974. Papers cover areas of electric power, electronic commun

    Jan 1, 1974

  • SME
    Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)

    By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan

    A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove

  • SME
    Special Shotcrete to Improve Open-Type TBM Performance Under Difficult Conditions

    By Sohta Takatsu, Hachiroh Mizubata, Shigeki Kudoh, Kazuya Takekuni, Yoshinori Yamada

    A special type of shotcrete is used to improve the performance of open-type TBM in difficult situations. The Hakamagoshi and Johana tunnels are expressway evacuation tunnels of 3.2 km and 5.1 km in le

    Jan 1, 2001

  • SME-ICGCM
    Application Of Physical And Mathematical Modelling In Underground Excavations

    The scope of this paper is to introduce a mathematical model based on matrix algebra in order to determine similitude quantities, which can be arranged in specific formats to simulate the field condit

    Jan 1, 1989

  • SME
    Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake

    By Gordon T. Clark, James R. Struthers, Celal Kirandag

    INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men

    Jan 1, 2007

  • SME
    Pre-Failure Pillar Yielding

    By J. F. T. Agapito, R. R. Goodrich

    Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual

    Jan 1, 2001

  • NIOSH
    RI 5399 Carbonizing Properties Of Floyd County, Ky., Coals ? Introduction

    By D. E. Wolfson

    As a part of its overall program of coal carbonization, the Bureau of Mines is studying the coking properties of coals that may be used for metallurgical purposes. The objectives of this study were gi

    Jan 1, 1958

  • ISEE
    Particles Size Distribution by Static Loading and Fragmentation Using Explosive

    By V. A. Akinbinua

    This work is intended to examine the relationship between rock fragments produced during compression tests using a soft testing machine, e.g. hydraulic press (the machine used in this work is Amlser r

    Jan 1, 2014

  • ISEE
    Control Blasting on the Cross Lake Weir Project

    By George McIvor, Bill Thompson, Don Whitmore, Brad Rhude

    "In 1972 Manitoba Hydro decided to develop the hydro electric potential of the Nelson River. This program included the construction of the Jenpeg Generating Station at the point where the channel of t

    Jan 1, 1992

  • AUSIMM
    Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications

    Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was

    Jan 1, 1980

  • AUSIMM
    The Evaluation of Industrial Mineral Projects

    Industrial minerals and rocks are those which are economically important because of desirable physical and/or chemical properties rather than metal or energy content. The evaluation of these resources

    Jan 1, 1988

  • SAIMM
    Regression revisited (again)

    One of the seminal pioneering papers in reserve evaluation was published by Danie Krige in 1951. In that paper he introduced the concept of regression techniques in providing better estimates for stop

    Jan 1, 2015

  • SAIMM
    Simulation Of Time-Dependent Crush Pillar Behaviour In Tabular Platinum Mines ? Synopsis

    By J. A. L. Napier

    It has been established that significant time-dependent stope convergence may occur over time periods of hours and days in certain hard-rock gold and platinum mines. The source of this time-dependent

    Jan 1, 2012

  • SME
    Study on the effects of scrubber operation on the face ventilation

    For the past four years, the Department of Mining Engineering at the University of Kentucky has conducted a validation study of the CFD Fluent code, by comparing its results against mining-related ben

    Jan 1, 2009