Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mine Waste Risk Minimisation by Integrated Waste Management and Process Optimisation
By D Brett
"Mine waste storages including tailings dams and waste rock dumps represent arguably the biggest risk on a mine site from both physical and geochemical viewpoints, related firstly to structural stabil
Jul 15, 2013
-
Recent Port Kembla experience with iron ore use – sintering and blast furnace
By S Chew, A Bennett, N Di Giorgio, B Osborne
After relining one of two blast furnaces and enlarging its sinter plant in 2009, BlueScope radically restructured its Port Kembla steelworks operation in 2011, shutting a blast furnace and halving its
Jul 24, 2017
-
Pit limit optimization using stochastic process
By M. Ataee-pour, S. E. Jalali
So far, a large number of algorithms have been developed for the optimization of pit limits, most of which follow deterministic rules. In this paper, a new algorithm is introduced, which follows a pro
Jan 1, 2006
-
Corrosion Processes And Mineral Formation On The Surface Of Bronze Monuments In Urban Environments
By Olga Frank-Kamenetskaya
The experimental results of study of atmospheric corrosion processes on Saint-Petersburg bronze monuments surface, received in situ and by means of simulating experiments, have been discussed. Infl
Jan 1, 2006
-
Robotic Mapping of Underground Drift Networks
By Unal Artan
It is well known in the robotics community that the ability to determine the position of vehicles in real time is a key enabling technology required for automation, traffic management, and to ensure s
Oct 1, 2009
-
Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build Contract
By David Hake, David Salisbury
The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT
Jan 1, 2005
-
Narrow vein shrinkage stope ventilation measurement using tracer gas and numerical simulation
By G. Arpa
Ventilation survey using tracer gas measurement is one of the techniques for mine ventilation design, monitoring and investigation of movement of fresh air and contaminants. However, there has been li
Jan 1, 2009
-
Running a Drill Program that Supports the Mission of Blasting
By William D. Hissem
While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.
Jan 1, 1997
-
Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze Wall
By Helmut Hass, Michael B. Gilbert
The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S
Jan 1, 2007
-
Getting More From the Ore – 1995 Daniel C. Jackling Lecture
By J. Burgess Winter
It is an honor to present the lecture in honor of Daniel C. Jackling, the developer of the technology of copper mining that we continue to use 100 years later. He made a dramatic breakthrough in the e
Jan 1, 1995
-
Other Nonmetals - Asphalt (Native) (da51f1ba-c21a-4e44-b047-934ffcd0f8e9)
By Wilton Johnson
Native asphalt was produced in 1982 by five companies in two States, Texas and Utah. Bituminous limestone, used primarily as a paving material for street and road repair, was produced by White Uvalde
Jan 1, 1983
-
Outlook for Oil Demand in the Pacific Basin Region
Large GDP increases in the Pacific Rim countries have been accompanied by similarly large increases in demand for oil products. In the case of residual fuels, this demand has been tempered by the subs
Jan 1, 1990
-
Gyratory Crusher Model And Impact Parameters Related To Energy Consumption
By R. Pothina
The objective of this research was to develop a mathematical model for gyratory crushers to help in the prediction of energy consumption and to analyze dominant parameters that affect this energy cons
Jan 1, 2007
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La
By Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
New York Subway Stations And Crossover Caverns—Update On Initial Support Design
By Charles Stone, Hannes Lagger, Dru Desai
The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car
Jan 1, 2007
-
Evaluation of Post-blast Re-entry Times Based on Gas Monitoring of Return Air Mining, Metallurgy and Exploration
By L. Yuan, J. H. Rowland, D. Bahrami, R. Thomas
Blasting is the main method of production in many non-coal underground mining operations and produces multiple toxic gases as a result. The Mine Safety and Health Administration (MSHA) requires mine o
-
Spontaneous Combustion and Simulation of Mine Fires and Their Effects on Mine Ventilation Systems
By H W. Wu, D Humphreys
The structure of a comprehensive research project into mine fires study applying the Ventgraph mine fire simulation software, preplanning of escape scenarios and general interaction with rescue respon
Jan 1, 2005
-
Adjunct Chemical Dust Control Strategies for High Tonnage Mining Operations
By Brian Danyliw
"Dust control is an increasingly important consideration for all mining operations from a health, safety, environmental and maintenance perspective. Modern mining operations incorporate a variety of m
Jan 1, 2015
-
Medición de los proyectos de responsabilidad social
By Cesar Sáenz Acosta
El presente texto señala las mediciones de impactos que se han realizado a los programas de responsabilidad social de una empresa minera. Esta medición se realizó a través del cálculo del indicador “R
Sep 12, 2011
-
Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.
By Creelman C. A
The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' kn
Jan 1, 1944